Scopes, estimates and approvals for restoration
A restoration scope starts as a list of repairs and grows when the walls come open. This feature builds the scope from your price list, keeps every revision and records who approved each extra and when. Estimators write it, the owner or insurer signs it off, and the crew starts only on an approved line.
Scope lines, revisions and who said yes
A scope is a priced list of repair work, room by room. It changes as the job reveals more. Each change becomes a new revision, not an overwrite. Weeks later, a disputed figure can be traced back to the day it appeared.
From first estimate to a signed extra
The first scope is a best guess made before walls are opened. Then the plasterboard comes off and the cavity is wet. By Thursday the extra is in dispute unless it was agreed on the day. The record has to move at site speed.
Scope seen by estimator, technician and owner
A scope has an author, an approver and a reader who pays for it. Each looks at one document for a different reason. Authors want speed. Approvers want plain figures and a photograph.
Settling how scopes are written and approved
Firm scopes rest on firm habits. Agree them with your estimators and project managers before the first live loss. GullySystem adjusts the setup afterwards when you ask, so nothing is fixed forever.
Passing approved lines to rebuild and billing
The scope sits between drying and the invoice. It takes rooms and findings from the drying record, and photographs from site. It gives approved lines to the rebuild, and approved totals to the payers. Anything unapproved stays out of both. That keeps billing honest, and the rebuild crew working only on agreed lines.
- Rooms and findings arrive from moisture and drying logs
- Photographs of damage come from photographs and job documents
- Approved lines drive rebuild phases and subcontractors
- Approved totals pass to invoices and payer splits
- Equipment days join the scope through equipment tracking
The limits of a priced scope
The scope records what was priced and who agreed. It does not decide what the repair should be, measure the damage, or say whether an insurer will pay. Cover and policy wording belong to the insurer and the adjuster. Tax on a line is for the owner and an accountant. That is not its job. A single small repair priced on one page needs no system.
Frequently asked questions
Can an earlier revision still be read?
Every revision is kept with its date. Open the first estimate beside the latest and see which lines rose, which fell and which were added. The reason for each extra sits with its photograph, so the history is readable.
Can we import an estimate from another tool?
Estimating file import is one of the connections available. Samples are gathered at the start. Which file types come in is confirmed in the first workshop, and an estimator then checks the lines against your price list.
What if an extra is split between owner and insurer?
Payer rules set the shares, such as an excess and the insurer’s part. Billing follows them. The owner’s part goes on one invoice and the insurer’s part on another, each for an approved extra only.
Where do extras not yet agreed show up?
They appear on a list of scopes awaiting approval and extras not yet agreed. Project managers read it to chase replies. Accounts read it too. That tells them which lines must not be billed yet.
Can a technician flag an extra from site?
A technician attaches the photograph and a note from the affected room. The estimator or project manager turns that into a priced line and asks for approval. Work on the extra waits for the mark. That is the rule.
How this feature fits the system.
Restoration Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Loss intake and dispatch
Every call or message opens a loss with its address, payer and claim reference, so none is logged late or sent to two crews.
Lead ManagementCrew scheduling and on-call roster
Technicians and subcontract crews are planned by day, and the after-hours roster shows who can attend a burst-pipe call tonight.
Technician SchedulingMoisture and drying logs
Each visit leaves a record of moisture readings, humidity and equipment by room, which becomes the drying log an insurer may request.
Service Reports and Proof of VisitTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements