Skip to main content
GullySystem

Scopes, estimates and approvals for restoration

A restoration scope starts as a list of repairs and grows when the walls come open. This feature builds the scope from your price list, keeps every revision and records who approved each extra and when. Estimators write it, the owner or insurer signs it off, and the crew starts only on an approved line.

Scope lines, revisions and who said yes

A scope is a priced list of repair work, room by room. It changes as the job reveals more. Each change becomes a new revision, not an overwrite. Weeks later, a disputed figure can be traced back to the day it appeared.

Lines priced from your list

Each line is taken from your price list, such as strip carpet underlay or replace plasterboard, with quantity, rate and room. Rates go in before the first job. Estimating files can be imported. Typing is kept to a minimum.

Revisions kept side by side

Every revision is dated and numbered. The first estimate stays as written when hidden damage adds work. Reading revision two against revision one shows what rose, what fell and why. That settles an argument quickly, with the insurer.

Extras with a reason and photograph

An extra carries its reason, such as rot under a sink or wet insulation in a ceiling void, and a photograph. The note says what was found and where. It sits on the job as its own line.

Who approved and on what date

Each extra is marked approved by the owner or the insurer, with the date. The crew starts only after that mark. A phone call becomes a record. Nobody has to remember who agreed or when.

From first estimate to a signed extra

The first scope is a best guess made before walls are opened. Then the plasterboard comes off and the cavity is wet. By Thursday the extra is in dispute unless it was agreed on the day. The record has to move at site speed.

Writing the first scope

Walking the loss with the drying log and photographs open, the estimator starts. Lines are picked from the price list room by room. The total builds as lines go in. Quantities are typed once and carried forward.

Hidden damage behind the skirting

Strip-out exposes rot behind the skirting and a wet wall cavity. The project manager adds an extra with a photograph and a reason. The owner is asked to approve before the crew carries on. Work waits for the answer.

The insurer approves by email

An adjuster replies to the revised scope. The email is stored on the job beside the revision it answers. The extra is marked approved, with the adjuster’s name and the date. The crew is told to begin.

Accounts bill the approved lines

When invoicing comes round, accounts take the approved lines. An extra not yet agreed sits on the list of scopes awaiting approval. It waits there. No invoice carries a line the payer has not accepted.

Scope seen by estimator, technician and owner

A scope has an author, an approver and a reader who pays for it. Each looks at one document for a different reason. Authors want speed. Approvers want plain figures and a photograph.

For estimators building the scope

Pick lines from the price list, set quantities by room and revise as findings arrive. Each revision is kept. Chasing approval becomes a short list, not a pile of emails. Extras not yet agreed are in view.

For technicians finding hidden damage

Open the assigned job and attach photographs of the affected rooms, with a note on what lies under the underlay or behind the wall. Estimating follows from there. The photograph becomes the evidence, saved with the room.

For firm owners watching unapproved work

Read scopes awaiting approval and extras not yet agreed. Work done on a line nobody has accepted is money at risk. Check the list. Ring the project manager before the invoice goes out, not after the dispute starts.

For accounts billing approved lines

Invoice what has been approved and see who approved it and when. If an insurer queries an extra, the answer is on the job. Date, name and photograph sit together. Nothing is chased by email.

Settling how scopes are written and approved

Firm scopes rest on firm habits. Agree them with your estimators and project managers before the first live loss. GullySystem adjusts the setup afterwards when you ask, so nothing is fixed forever.

Marking an extra as approved

Decide who records an approval and what counts as proof. Perhaps an emailed reply, a signed page or a note from the adjuster. The record keeps the name and the date. So the rule needs to be clear.

Approval given by phone

Owners can say yes on the doorstep. Settle whether that is accepted, and who writes down the time and the name. A spoken yes with no record is a dispute waiting to happen at invoice time.

Numbering revisions between rounds

Agree whether each exchange with the insurer is a new revision, or only a change in total. Frequent small revisions give a long trail. Fewer give a short one. Choose the length of trail you want.

The price list behind each line

Decide whether one price list serves every payer, or insurer work follows a separate list. That choice shapes every line. Later rate changes are made by GullySystem on request, so the list stays current, whichever payer is asking.

Passing approved lines to rebuild and billing

The scope sits between drying and the invoice. It takes rooms and findings from the drying record, and photographs from site. It gives approved lines to the rebuild, and approved totals to the payers. Anything unapproved stays out of both. That keeps billing honest, and the rebuild crew working only on agreed lines.

  • Rooms and findings arrive from moisture and drying logs
  • Photographs of damage come from photographs and job documents
  • Approved lines drive rebuild phases and subcontractors
  • Approved totals pass to invoices and payer splits
  • Equipment days join the scope through equipment tracking

The limits of a priced scope

The scope records what was priced and who agreed. It does not decide what the repair should be, measure the damage, or say whether an insurer will pay. Cover and policy wording belong to the insurer and the adjuster. Tax on a line is for the owner and an accountant. That is not its job. A single small repair priced on one page needs no system.

FAQ

Frequently asked questions

Can an earlier revision still be read?

Every revision is kept with its date. Open the first estimate beside the latest and see which lines rose, which fell and which were added. The reason for each extra sits with its photograph, so the history is readable.

Can we import an estimate from another tool?

Estimating file import is one of the connections available. Samples are gathered at the start. Which file types come in is confirmed in the first workshop, and an estimator then checks the lines against your price list.

What if an extra is split between owner and insurer?

Payer rules set the shares, such as an excess and the insurer’s part. Billing follows them. The owner’s part goes on one invoice and the insurer’s part on another, each for an approved extra only.

Where do extras not yet agreed show up?

They appear on a list of scopes awaiting approval and extras not yet agreed. Project managers read it to chase replies. Accounts read it too. That tells them which lines must not be billed yet.

Can a technician flag an extra from site?

A technician attaches the photograph and a note from the affected room. The estimator or project manager turns that into a priced line and asks for approval. Work on the extra waits for the mark. That is the rule.

Where it fits

How this feature fits the system.

Restoration Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Loss intake and dispatch

Every call or message opens a loss with its address, payer and claim reference, so none is logged late or sent to two crews.

Lead Management

Crew scheduling and on-call roster

Technicians and subcontract crews are planned by day, and the after-hours roster shows who can attend a burst-pipe call tonight.

Technician Scheduling

Moisture and drying logs

Each visit leaves a record of moisture readings, humidity and equipment by room, which becomes the drying log an insurer may request.

Service Reports and Proof of Visit
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements