Skip to main content
GullySystem

Equipment tracking for restoration contractors

A restoration firm owns a lot of kit that leaves the yard every morning. Equipment tracking gives each air mover, dehumidifier and HEPA scrubber its own record. Each is placed against a job and a room, with placed and collected dates that drive rental days. Any unit still out stands out on the list.

A register entry for every drying unit

Every unit the firm owns is a register entry, from a small air mover to a desiccant dehumidifier or a fogging machine. Placement adds a line to that entry. Collection closes it. The history of one unit reads like a short diary.

Unit tag, type and serial

Each air mover, dehumidifier, scrubber or fogging machine has its own entry with type, tag and serial. The serial noted at placement matches that entry. Tags are loaded before the first job. No unit is ever just a number on a whiteboard.

Placed and collected dates

Placement stamps the date, the job and the room. Collection stamps the day the unit came back. The gap between the two is the time that unit sat in that room. No tally sheet is needed.

The room and job

Each unit is placed against a room on a loss, so the kitchen of one job shows its air movers and its desiccant unit. Moving a unit to another room logs the move. Nobody guesses where it went.

Moves, collections and short notes

Each move between rooms or jobs is logged with its date and the person who made it. Back from site with a damaged guard or a full tank, a unit can carry a short note. Missing units show as still out.

Kit through a flood, from van to yard

A flooded ground floor swallows a van load of equipment. Every unit has to come home. The list tells the yard which ones are still out, where they are and which job pays for them. It does so at the start and end of each day.

Loading the van at dawn

The technician picks units from the register for the loss, such as air movers, a dehumidifier and a scrubber. Serial numbers are noted as each unit leaves the yard. Loss and room are chosen on the phone.

Placing units room by room

At the loss the crew sets air movers in the lounge and a dehumidifier in the hall, and each is recorded against its room. The rental count starts from that placement date. A short phone entry covers it.

Moving a dehumidifier next door

On the second visit the hallway has dried but the bedroom has not. The technician carries the dehumidifier across and logs the move. From then the days count in the bedroom. The old room closes, with its total kept.

The yard counts what came back

When a job ends, yard staff tick off units collected against the loss. Anything still showing as out stands out on the equipment list. A call to the crew finds the missing scrubber. Nothing slips by.

What each person asks of the equipment list

The equipment list answers a different question for each person who opens it. A technician asks what is free. The owner asks what has been out too long, and accounts ask which days to charge.

For technicians loading and placing units

Choose units from the register for the loss, note the serial and place each against a room. Collect them against the same entry. A short phone entry replaces a scribble on a clipboard in the van.

For project managers shifting kit

Read which units are out on which loss and room, and which job has finished drying. Shift a dehumidifier from a dry house to a wet one. Log the move. Billing then follows it, room by room.

For owners chasing units still out

Read equipment out by unit, room and days placed. A scrubber that has sat on one job far too long is easy to spot. Ask the project manager why. Lost kit is costly, and rental days keep running on the invoice.

For accounts counting rental days

Take the placed and collected dates for each unit on a loss. Carry the days to the invoice for the payer concerned, whether owner, insurer or agent. They can then be charged with confidence. Dates back each one.

Equipment rules to settle with the yard

Untagged kit cannot be tracked. Settle the rules with whoever runs the yard and with your project managers. GullySystem loads the register before the first job and adjusts the rules later when you ask.

Smallest item worth a record

Decide whether hoses, extension leads and spare filters get entries, or only the big units, and whether a ladder or a moisture meter counts. A longer register is more complete. A shorter one is easier to keep honest. Choose before loading.

Counting the first and last day

Agree how placed and collected dates become rental days. Is the day of placement charged, and is the day of collection? The rule is yours and your payers’. Each loss then applies it the same way.

Writing off a unit never collected

Settle who may mark a unit as lost, and what happens to the payer’s charge if a unit stays behind. A written-off dehumidifier is a cost to the firm. It should leave the register on purpose.

Hire rate for each unit type

Set a daily rate for air movers, dehumidifiers and scrubbers. Your rates stay yours. Decide whether a desiccant unit sits on a different rate. Rates go in with the register, so invoices price the days consistently across every payer.

Where equipment records meet the rest of the job

This feature draws its rooms from the loss. It takes its goals from the drying log. In return it supplies the days that invoices need. A collected unit frees stock for the next job. That list is read at the owner’s desk and in the yard.

  • Rooms and job references come from loss intake and dispatch
  • Met drying goals trigger collection in moisture and drying logs
  • Placed days feed invoices and payer splits
  • Equipment cost per job reaches the margin by job report
  • Collection runs follow the crew scheduling and on-call roster

A register is not a maintenance system

Tracking records where a unit is and for how long. Servicing is separate. It does not service, calibrate or test equipment, and it does not read a unit’s own meters. Rental rates, damage charges and write-offs remain decisions for the owner and the accountant. A firm with a few units on a single shelf can use a sign-out sheet. The register earns its place once kit is out on several jobs at once.

FAQ

Frequently asked questions

Can rental days be charged to the payer?

Placed and collected dates give the days each unit spent in each room. Those days can be carried to the invoice for the payer concerned. Agree them with the payer. The system does not set them for you.

What happens when a unit moves between rooms?

The move is logged with its date. Days before the move count against the first room, and days after it count against the second. The job keeps one whole total, and nothing is counted twice.

Can units we hire in be recorded too?

The register covers every drying unit you own. Hired-in units can be added as entries and followed in the same way. Whether to include them is settled in the first workshop. Yard staff should be there.

How do we find a missing air mover?

Open the equipment list and look for units still out. Each shows the job and room where it was last placed, with the date. Begin with that short list. Ringing the project manager on that loss settles it.

Is equipment tracked by serial number?

The serial noted at placement is matched to it. Tags and serials are loaded before the first job, so the technician chooses from your real register, not a blank list.

Where it fits

How this feature fits the system.

Restoration Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Loss intake and dispatch

Every call or message opens a loss with its address, payer and claim reference, so none is logged late or sent to two crews.

Lead Management

Crew scheduling and on-call roster

Technicians and subcontract crews are planned by day, and the after-hours roster shows who can attend a burst-pipe call tonight.

Technician Scheduling

Moisture and drying logs

Each visit leaves a record of moisture readings, humidity and equipment by room, which becomes the drying log an insurer may request.

Service Reports and Proof of Visit
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements