Rebuild phases and subcontractors for restoration

Once a structure is dry, the repair becomes a building job. This feature schedules the rebuild trades for plasterboard, flooring, paint, joinery and electrical after drying sign-off, sends purchase orders to subcontractors and records each completion. Which phase is next, and who has finished, is plain to the person managing the job.

Phases, orders and completions on the job

A rebuild is a run of phases, each with a trade, a start and a finish. Each phase has its own line. The record holds the order of the phases, the subcontractor chosen and what that trade was told to do.

Phases in building order

Phases such as plasterboard, flooring, paint, joinery and electrical are laid out in the order the work must follow. The first is dated after drying sign-off. Each carries a planned start and a planned finish.

Subcontractor chosen for each phase

Each phase names the subcontractor or the in-house crew doing it, and the rooms it covers. A plasterer booked for two houses appears on both. Names are entered once. The same name is then used every time, with no spelling variants.

A purchase order for each trade

A purchase order goes to the subcontractor for the phase, with the scope lines it covers and the agreed price. The order is numbered and dated. That paper backs the payment later, when the subcontractor’s own invoice arrives.

Completion recorded and dated

When a subcontractor finishes, the completion is recorded against the phase with its date. Work completed and payable shows on its own list. Unfinished phases stay open and visible to everyone. Gaps are not hidden.

Rebuild week by week, trade by trade

Drying sign-off is the starting gun. Until it is given, nobody should hang plasterboard on a damp wall. After it, several trades have to pass through the same rooms without treading on each other. The sequence is the project manager’s daily puzzle.

Sign-off releases the rebuild

The last room meets its drying goal and the technician marks it. The loss moves to rebuild on the project manager’s list, and trades are booked. Equipment has already gone back to the yard. The handover is clean.

Booking the plasterer and the painter

Booking the plasterer first and the painter after, the project manager sends a purchase order to each. The dates sit on one plan. A slip by the plasterer is plain, and the painter can be told.

The electrician finishes early

The electrician completes a day ahead. The completion is recorded with its date. The flooring can then be pulled forward. No one waits for a phone call to find out, and no day is wasted.

Final walk-round and certificate

With every phase complete, the project manager walks the rooms with the occupant. The completion certificate is filed on the job. Then comes final invoicing. Nothing is missing from the file, from first photograph to last signature.

The phase plan as each person reads it

The same plan is read by those who book trades and those who wait for them. A phase means different things to each. Dates matter to the project manager and the occupant. Completion matters to accounts.

For project managers sequencing the trades

Lay the phases out after drying sign-off, pick a subcontractor for each and send the purchase orders. See which trade is on site today and which is late. Reshuffling takes a few edits. It does not take a day of calls.

For technicians handing over a house

Mark the drying goal reached and collect the equipment. That entry is the signal to book the rebuild. It starts the next stage. The technician’s last record on the job is the first one the builders rely on.

For accounts checking work payable

Check the list of subcontractor work completed and payable each time a bill arrives. Each line ties a purchase order to a recorded completion. Unfinished phases are not on it. Nothing finished is forgotten either.

For owners watching rebuild progress

See which losses are in rebuild, which phase each has reached and where trades have slipped. A job stuck waiting for a joiner is costing time. Call the subcontractor yourself. The facts are in front of you.

Rebuild choices to make with your trades

Subcontractors work to their own habits, so the system has to match yours. Settle a few points with your project managers and with the trades you use regularly. GullySystem sets up phases and orders to suit.

Phases each loss type follows

A fire loss needs soot cleaning and a different run of trades from a clean-water flood. Decide the phase list for each loss type. Water, fire, mould and storm jobs get their own stages, set with you.

Releasing the job to rebuild

Settle who confirms drying sign-off, and whether one room drying early may release its trades while another room is still wet. A cautious rule delays work. A loose one risks damp behind new paint, which is worse.

Purchase order wording and limits

Agree what each order must say, such as the scope lines, the price and the access arrangements, and who approves an order. A vague order produces a disputed invoice from the trade, weeks later. Short orders need to be exact.

Who records a subcontractor’s completion

Decide whether completion is recorded after a site visit, or on the subcontractor’s word. A photograph of the finished wall can back either choice. The record keeps the date and the name. Pick the habit.

The chain from drying sign-off to invoice

Rebuild is where earlier records pay off. Drying sign-off opens it, and the approved scope supplies the lines for each order. Crews are planned on the same schedule as technicians. What a subcontractor completes becomes something to bill. The chain runs from drying to invoice.

  • Drying sign-off arrives from moisture and drying logs
  • Approved scope lines feed each purchase order
  • Materials are drawn from the materials and supplies store
  • Subcontract crew days appear in crew scheduling and on-call roster
  • Completed phases support progress bills in invoices and payer splits

Limits of a rebuild schedule

Phase scheduling records who does what and when it was finished. It does not judge the quality of a trade’s work, certify a building or manage a subcontractor’s own staff. Contracts and payment terms with subcontractors are agreed outside the system, with the owner and an adviser. A single repair with one painter needs only a phone call. The feature earns its place when trades overlap.

FAQ

Frequently asked questions

Can rebuild start before every room is dry?

Rebuild trades are scheduled after drying sign-off, so the first dated phase follows that mark. Whether one dry room may release its trades early is a rule. Set-up settles it with your project managers. The answer is yours.

What does a purchase order to a subcontractor contain?

It names the subcontractor, the phase and the loss, with the scope lines it covers and the agreed price. Each is numbered and dated. Wording is set up with you before the first job, so nothing is invented on the day.

How is a subcontractor’s completion recorded?

Completion is recorded against the phase, with the date. Subcontractor work completed and payable then appears as its own list. Accounts read that list before they settle anything with the trade. Every line is dated.

Can one subcontractor serve several jobs at once?

A trade can hold orders on several losses on the same days. Each purchase order and completion stays against its own job. The plan shows the trade’s days. A clash between two jobs is visible. Nothing blurs.

What happens to the plan when an extra is approved?

An approved extra adds a line to the scope. The related phase then needs a new or revised purchase order. Project managers see the extra waiting. The trade is not left working on a verbal request.

Where it fits

How this feature fits the system.

Restoration Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Loss intake and dispatch

Every call or message opens a loss with its address, payer and claim reference, so none is logged late or sent to two crews.

Lead Management

Crew scheduling and on-call roster

Technicians and subcontract crews are planned by day, and the after-hours roster shows who can attend a burst-pipe call tonight.

Technician Scheduling

Moisture and drying logs

Each visit leaves a record of moisture readings, humidity and equipment by room, which becomes the drying log an insurer may request.

Service Reports and Proof of Visit
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements