Moisture and drying logs for restoration jobs
An insurer reads the drying record before anything else on a water loss. It keeps moisture readings, humidity, temperatures and drying goals by room and visit. Then it prints one log with the photographs of each affected wall, floor and ceiling beside it. Technicians fill it in on a phone, and the office reads it.
Readings, goals and rooms in one drying file
Each visit adds a dated row of figures to a room. Across several visits those rows show a wall getting drier, or failing to. Every figure stays against its room and visit. Gaps stay visible. Nobody has to rebuild the story from five sources.
A drying job from first probe to sign-off
On day one a technician walks the rooms with a pinless probe and a thermal camera, and the first figures go in. After that, the job lives on return visits. The drying log is how everyone else learns where the loss stands.
Reading the drying log from each desk
A drying record is written on site and read in the office. The two need different things from it. Site wants a quick way to key figures. The office wants a clean print for an insurer.
Choices to make before the first drying log
Drying logs go wrong when two technicians record the same wall in different ways. Settle the habits first, with your project managers and the technicians who hold the probes. GullySystem changes the setup later on request.
Where drying figures flow to and from
Drying sits in the middle of the job. Intake gives it the rooms, and equipment tracking tells it what is placed. A met goal releases units and opens the way for the scope and the rebuild. The finished log leaves with the insurer’s invoice query.
- Rooms and loss type arrive from loss intake and dispatch
- Equipment days per room come from equipment tracking
- Visit photographs link to photographs and job documents
- Drying sign-off releases rebuild phases and subcontractors
- Overdue readings appear in the jobs in drying list
What a drying log cannot decide
The log records what was measured. It does not tell a technician where to put equipment, say when a structure is dry, or show that a policy covers the loss. Drying methods and targets come from your own practice and any insurer requirement. A single small leak in one room can be logged on a printed sheet. Judgement stays with the person holding the probe.
Frequently asked questions
Can the log print with photographs attached?
A printed log lists readings by room and visit. Photographs of each affected wall, floor and ceiling sit beside the entries they belong to. The exact layout is checked against what your insurers ask for during implementation. Nothing is retyped.
Can figures be entered without phone signal?
The phone needs a signal to save. In a basement, a technician can jot figures on paper and key them in once outside. The visit date is still recorded. Late entries show up on the overdue list.
Who sets the drying goal for a room?
Your own method sets it. The goal is entered per room when drying starts, and the visit that reaches it is marked. GullySystem does not decide target figures. Your technicians and project manager agree them.
How does a project manager spot a late visit?
Jobs in drying with moisture readings overdue appear as their own list. The project manager opens it in the morning and rings the crew concerned. Late entries are hard to hide. A job nobody has measured is easy to see.
Can paper logs from live jobs be loaded?
Open jobs come across from your spreadsheet or current tool. Estimators confirm them. Whether paper readings from a drying job already running are typed in or kept in a folder is agreed in the first workshop.
How this feature fits the system.
Restoration Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Loss intake and dispatch
Every call or message opens a loss with its address, payer and claim reference, so none is logged late or sent to two crews.
Lead ManagementCrew scheduling and on-call roster
Technicians and subcontract crews are planned by day, and the after-hours roster shows who can attend a burst-pipe call tonight.
Technician SchedulingMoisture and drying logs
Each visit leaves a record of moisture readings, humidity and equipment by room, which becomes the drying log an insurer may request.
Service Reports and Proof of VisitTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements