Skip to main content
GullySystem

Moisture and drying logs for restoration jobs

An insurer reads the drying record before anything else on a water loss. It keeps moisture readings, humidity, temperatures and drying goals by room and visit. Then it prints one log with the photographs of each affected wall, floor and ceiling beside it. Technicians fill it in on a phone, and the office reads it.

Readings, goals and rooms in one drying file

Each visit adds a dated row of figures to a room. Across several visits those rows show a wall getting drier, or failing to. Every figure stays against its room and visit. Gaps stay visible. Nobody has to rebuild the story from five sources.

Moisture readings by room and visit

Each reading is kept against the wall, floor or ceiling surface it came from, the room and the visit date. Comparing visits shows whether a surface is drying. A reading that rises stands out. So does a visit with no figure at all.

Humidity, temperature and dewpoint

Air figures from a hygrometer go in per room, covering humidity, temperature and dewpoint. They explain a slow wall. Damp air held in by a closed door shows up here. Short notes sit beside the figures, such as a door left shut overnight.

A drying goal for each room

Each room gets a target when drying starts. The visit that meets it is marked. Equipment is moved or collected as goals are met. That entry is also the start of drying sign-off for the job.

Photographs beside the readings

Pictures of each affected wall, floor and ceiling are attached next to the figures for that visit. An insurer reading a line sees the wall it describes. The match is exact. Room and date match the entry, so nothing is filed by guesswork.

A drying job from first probe to sign-off

On day one a technician walks the rooms with a pinless probe and a thermal camera, and the first figures go in. After that, the job lives on return visits. The drying log is how everyone else learns where the loss stands.

First walk-through with probe and camera

The technician takes first readings with a pinless probe and a thermal camera, room by room, and keys them in on a phone. Wet plasterboard and carpet underlay come out. Baseline figures are now on record.

Return visit on the second day

Back at the loss, the technician repeats the readings and compares them with the last visit on screen. A wall still wet keeps its equipment. A dry floor frees an air mover for another room.

The office spots a late visit

The project manager opens the list of jobs in drying with moisture readings overdue. One is a basement where the phone had no signal, so entries were held. A call settles it. The crew keys the figures in from the van.

Goal reached, equipment collected

Readings in the last room meet the drying goal. The technician marks it and collects the air movers and the dehumidifier. Equipment goes back to the store. After sign-off, the project manager can book rebuild trades.

Reading the drying log from each desk

A drying record is written on site and read in the office. The two need different things from it. Site wants a quick way to key figures. The office wants a clean print for an insurer.

For technicians keying figures on site

Open the assigned job, pick the room and enter moisture, humidity and temperature for the visit. Add photographs as you go. The form is short on purpose, because wet gloves and a basement leave little patience.

For project managers judging progress

Compare visit against visit and see which rooms are drying and which are stuck. Overdue readings come to the surface. Decisions about extra equipment or an extended stay then rest on figures, not on memory or a hunch.

For accounts answering an insurer’s query

Print the log with the photographs attached and send it with the invoice or in reply to a question. The query is answered from the job file. Nobody goes hunting through phone notes or old emails for a missing visit.

For owners reading overdue jobs

See the jobs in drying and which have readings overdue. A job nobody has measured for a while is a risk to the claim. Ring the project manager. Ask what is holding the next visit up.

Choices to make before the first drying log

Drying logs go wrong when two technicians record the same wall in different ways. Settle the habits first, with your project managers and the technicians who hold the probes. GullySystem changes the setup later on request.

Surfaces measured in each room

Choose which surfaces get a reading in every room, such as skirting, lower wall, floor and ceiling. A fixed set makes visit-to-visit comparison fair. A free choice produces figures that cannot be compared, and an adjuster will notice.

Drying goals for each material

Agree the target figure for plasterboard, timber and screed, and who sets it. Your own method and any insurer requirement decide the number. GullySystem stores the goal. It does not choose it, and it does not check it against any standard.

Print layout an insurer will accept

Show your adjusters a sample log early. Some want photographs inside each row, others at the back. Whether a particular insurer accepts the format is checked during implementation, before a live claim depends on it.

Correcting a figure after the visit

Decide who may amend a reading once saved, and whether the first entry stays visible. A mistyped number is easy to make. A silently changed one is a problem when an adjuster compares versions of the log.

Where drying figures flow to and from

Drying sits in the middle of the job. Intake gives it the rooms, and equipment tracking tells it what is placed. A met goal releases units and opens the way for the scope and the rebuild. The finished log leaves with the insurer’s invoice query.

  • Rooms and loss type arrive from loss intake and dispatch
  • Equipment days per room come from equipment tracking
  • Visit photographs link to photographs and job documents
  • Drying sign-off releases rebuild phases and subcontractors
  • Overdue readings appear in the jobs in drying list

What a drying log cannot decide

The log records what was measured. It does not tell a technician where to put equipment, say when a structure is dry, or show that a policy covers the loss. Drying methods and targets come from your own practice and any insurer requirement. A single small leak in one room can be logged on a printed sheet. Judgement stays with the person holding the probe.

FAQ

Frequently asked questions

Can the log print with photographs attached?

A printed log lists readings by room and visit. Photographs of each affected wall, floor and ceiling sit beside the entries they belong to. The exact layout is checked against what your insurers ask for during implementation. Nothing is retyped.

Can figures be entered without phone signal?

The phone needs a signal to save. In a basement, a technician can jot figures on paper and key them in once outside. The visit date is still recorded. Late entries show up on the overdue list.

Who sets the drying goal for a room?

Your own method sets it. The goal is entered per room when drying starts, and the visit that reaches it is marked. GullySystem does not decide target figures. Your technicians and project manager agree them.

How does a project manager spot a late visit?

Jobs in drying with moisture readings overdue appear as their own list. The project manager opens it in the morning and rings the crew concerned. Late entries are hard to hide. A job nobody has measured is easy to see.

Can paper logs from live jobs be loaded?

Open jobs come across from your spreadsheet or current tool. Estimators confirm them. Whether paper readings from a drying job already running are typed in or kept in a folder is agreed in the first workshop.

Where it fits

How this feature fits the system.

Restoration Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Loss intake and dispatch

Every call or message opens a loss with its address, payer and claim reference, so none is logged late or sent to two crews.

Lead Management

Crew scheduling and on-call roster

Technicians and subcontract crews are planned by day, and the after-hours roster shows who can attend a burst-pipe call tonight.

Technician Scheduling

Moisture and drying logs

Each visit leaves a record of moisture readings, humidity and equipment by room, which becomes the drying log an insurer may request.

Service Reports and Proof of Visit
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements