Skip to main content
GullySystem

Job Billing and Payments for Rooftop Solar Installers

Each solar job is billed in the stages you agreed with the customer. Invoices carry GST, each payment is posted to its job, and the office sees what is due before the crew moves on.

Invoices raised from the job

Advance and stage invoices

The advance at acceptance, a payment when material arrives and the balance at handover are taken from the payment stages on the proposal. Terms are yours.

Material and service lines

Panels, inverter, structure and installation work appear as lines. Extras such as a longer cable run are added as their own lines. Nothing is hidden in a lump sum.

GST on the invoice

Invoices are issued in a GST format. The rate and treatment for each item are decided by the client’s accountant and set up once.

Recording payments

Customers pay by bank transfer, cheque, UPI or cash. Each receipt is entered against the invoice, with the reference. Where a loan or subsidy is part of the payment, it is recorded as a separate receipt. Part payments leave a balance that stays visible on the job.

Money due

The owner sees which jobs have an invoice raised and unpaid. A balance on a commissioned plant stands out, and the person who calls the customer sees the amount and the invoice. Chasing starts from facts.

What job billing does not do

  • It is not an accounting package. Ledgers and returns stay with your accountant.
  • Tally export is scoped during set-up, based on how your books are kept.
  • Subsidy and loan terms are between the customer, the bank and the scheme.
  • Payment gateway links are confirmed during scoping.

Stage billing in a solar contract

Solar jobs are paid in parts. Customers want to know when each part falls due, and why.

Booking advance

Paid on acceptance, it releases the order for material.

Material delivery stage

Raised when panels, inverter and structure reach the site.

Completion stage

Raised on commissioning, with the handover signature as the trigger where the contract says so.

Final balance

Held until a meter change or a subsidy credit, depending on what the contract says.

Subsidy, finance and who pays what

Rooftop jobs that use a scheme credit or a bank loan mix that money with the customer’s own.

  • The invoice shows what the customer pays and what is claimed elsewhere.
  • Subsidy that arrives later is tracked as a separate receivable.
  • Loan disbursals are matched to the stage they cover.
  • Refunds or adjustments carry a reason.

Questions about solar stage invoicing

Billing errors cost cash and goodwill.

  • Can an invoice carry both goods and service lines?
  • Can part payments be matched to an invoice?
  • Can I print a statement for a customer?
  • How does the accountant take over the figures?

Billing a solar job stage by stage

A rooftop contract is paid in parts, and each part is raised when a stage is reached. The billing clerk, the site team and the owner all touch the same invoice trail. Follow one job through, stage by stage. Watch the invoices.

Advance on acceptance

When the customer signs, the clerk raises the first invoice for the agreed advance. The crew gets a start date only once the advance shows as received. Simple, and fair to both sides.

Material delivered to site

When panels and inverter reach the roof, the stage is marked and the next invoice falls due. The clerk raises it that afternoon and sends it by chat. Payment follows a visible event. The customer knows exactly what has arrived on site.

Commissioning and balance

After the plant is switched on, the final stage closes and the balance invoice follows. If subsidy money is expected later, it is noted separately. The customer sees what is still owed. Nothing is hidden or rounded.

Owner’s Friday check

The owner opens the due list and sees which jobs carry overdue invoices, with the stage that triggered each. A short call goes to the largest one. Chasing begins with facts rather than memory, which keeps calls polite.

Billing choices before the first job

Stage billing depends on terms the whole team can repeat to a customer. Keep it plain. Before invoices are raised in the system, the owner settles the stage split, who raises an invoice and how corrections are handled by the office.

The standard stage split

Decide the usual order of payments, such as advance, delivery and commissioning. Allow exceptions per job with a note. A fixed template reduces arguments at the doorstep, while exceptions keep larger jobs workable and honest.

Who may raise or cancel

Give invoice raising to the clerk and cancelling to the owner alone. A cancelled invoice should carry a reason, typed by whoever cancelled it. Both roles are named in advance. This keeps the numbers believable on the day the accountant reviews the whole job file.

How part payments are posted

Agree how a short payment is recorded. It stays against the same invoice, leaving the balance visible. The clerk does not create a fresh invoice for every instalment. That would clutter the job and confuse the customer.

Treating subsidy and finance

Decide how money from a scheme or a lender is recorded, since it arrives later and from someone other than the customer. Label it clearly. Then the customer’s own balance stays simple and the books stay clean.

Make an informed decision

Questions to settle before rollout.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Recording payments

Can the same receipt be allocated without counting the money twice?

Take an unallocated amount in “Recording payments” and apply it to the intended balance. Review the remaining amount and the original receipt reference together.

Background reading: ERPNext: payment allocation

Job Billing and Payments for Rooftop Solar Installers

Can you explain the balance from its original documents?

Select a partly settled example in “Job Billing and Payments for Rooftop Solar Installers”. Ask for the invoice, allocated receipts and remaining balance to be shown together before agreeing the opening figures.

Background reading: ERPNext: outstanding invoices

FAQ

Frequently asked questions

Can an invoice be raised before material arrives?

Yes. Which stage triggers each invoice follows your payment terms, and the office can raise one by hand if a stage changes.

Can the customer pay by UPI?

Yes. A UPI receipt is posted to its invoice, and a payment link can be added if you use a gateway. Cash is recorded too.

Can a bank-financed job be handled?

The customer’s share and the bank’s disbursement are recorded as separate receipts on the same job.

Does it show profit on a job?

It can show material issued and billed values side by side. Whether labour and overheads are counted is set with you.

Who decides GST treatment for solar work?

Your accountant. The software prints invoices as the tax setup instructs, and it does not replace professional advice on rates or place of supply.

Can a customer pay in cash?

Yes, and the receipt is posted to the job like any other payment. Cash handling rules remain the firm’s responsibility.

Where it fits

How this feature fits the system.

Solar Installation Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Proposals and quotations

Sales engineers size the plant in kW, choose panels, inverter and structure, and issue a priced proposal with every revision kept against the enquiry.

Estimate/Quotation Management

Material and serial numbers

Panels, inverters, structures, cables and protection items are tracked in stock, and panel and inverter serial numbers are tied to the job.

Batch and Serial Tracking

Service visits and AMC

Cleaning, inspection and fault visits are booked per plant, with each annual maintenance contract and its renewal date tracked, so a lapsing contract gets a call.

AMC and Service Contracts
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements