Skip to main content
GullySystem
Manufacturing · Avionics Hardware Manufacturer Management Software

One system for components, boards, firmware loads, burn-in and repair history by serial.

Every avionics unit carries its own serial chain. Reel date codes, approved manufacturers, modification status, reflow profiles, X-ray and automated optical inspection findings, flashed firmware images and burn-in soak results sit against the unit, with every repair after it. Purchasing sees allocation risk on a long-lead connector before the kit comes up short, and quality can open any shipped serial. Nothing is rebuilt from memory.

  • Bills of materials, build standards and approved source lists entered the way engineering holds them
  • Open builds, serial history and stock migrated
  • Changes to test forms and routings handled by GullySystem staff when asked

Avionics hardware manufacturers use this software to record how each unit was built. Capacitor date codes and approved sources, reflow profiles and AOI results, flashed firmware checksums and burn-in soak readings all attach to the serial. A repaired line replaceable unit returns to its current modification status. The whole chain opens from one number.

Where it breaks today

What goes wrong before the software.

Date codes disappear into kits

Reels are opened, split and shared between kits. Once a board is built, the date code and lot of one 0402 capacitor cannot be recovered, so a suspect reel means pulling every unit it touched.

Alternates are agreed informally

A memory device goes on allocation and a replacement is accepted by phone. The bill of materials stays unchanged, and the next board lot is built around the part nobody can buy.

Firmware images are loaded from a laptop

Units take whichever image sits on the programming laptop. The version flashed into the unit then disagrees with the version named on the test record, and the checksum was never compared.

Moisture exposure is unrecorded

A BGA package sits on the line past its floor life. Nobody wrote down when the dry bag was opened, so the bake decision becomes a guess.

Repairs go back at the old standard

A returned unit is fixed to the build it arrived with. Service bulletins and later modifications are skipped, and the operator finds out at installation in the aircraft.

Allocation risk shows up late

A connector with a long lead time is ordered once the kit is already short. The board lot waits on that single part while the delivery date moves.

How it runs

How the work flows through it, step by step.

  1. 1

    Order and build standard

    A customer order is logged against unit part number, modification status and delivery date. Contract review notes stay with it.

  2. 2

    Purchasing and goods inward

    Parts are ordered from approved sources. At receipt the date code, lot, country of origin and packaging are recorded, and moisture-sensitive items are labelled before they reach the shelf.

  3. 3

    Kitting

    A kit is issued for the board lot at the current bill of materials. Reel numbers and the date codes used are written to the kit.

  4. 4

    Board assembly

    Paste is printed, parts placed and boards reflowed, then AOI or X-ray checks follow, with solder profile and result stored per lot. Through-hole parts, harness looms and conformal coating come next.

  5. 5

    Firmware, burn-in and test

    The unit is flashed with its firmware, soaked through the set burn-in cycle and put to acceptance test. Readings are logged. A failure holds the serial.

  6. 6

    Dispatch and repair

    Passed units ship with a certificate of conformance. A return reopens the serial, and the repair and any modification join its chain.

Modules

What is inside.

Every module can be switched on, left out or changed to match how your team already works.

Customer orders and build standards

Hold orders against part number, modification status and delivery date, then release each build at the correct standard with the contract review notes attached.

Approved source list

List approved manufacturers and franchised distributors by part. A purchase from a source outside the list is flagged to the buyer before the order goes out.

Bills of materials and alternates

Keep the bill of materials by build standard, with dated and reasoned alternates, so earlier builds keep the original part on record.

Goods inward and date codes

Record date code, lot, quantity, packaging and country of origin at receipt, and hold a reel or tray that fails incoming inspection apart from usable stock.

Moisture-sensitive part control

Track dry bag open time against the floor life of each moisture-sensitive package. A kit that has outlived its limit is flagged and sent for baking.

Kitting and allocation

Issue kits per board lot, note the reels and date codes drawn, and show the parts on allocation that will stop a build.

Board line records

Log stencil print, solder profile, AOI, X-ray and rework for each board lot, linked to the unit serials it produced.

Firmware and acceptance test

Record firmware image, version and checksum flashed to each unit, with burn-in soak duration and acceptance readings beside it.

Repair and modification history

Open a returned unit by serial, record the fault and the part replaced, then bring it to the current standard before it is retested.

Certificate and shipment

Issue the certificate of conformance and packing list for each batch, with serials, test dates and release signatures listed.

Solutions inside

The business modules it is built from.

Each one is also available on its own, or inside a system built for you.

  • Bill of Materials

    The bill of materials is held per build standard, and a dated alternate leaves earlier builds with their original part on record.

  • Vendor Management

    Approved manufacturers and distributors are listed against each part, and a purchase from a source outside the list is flagged to the buyer.

  • Goods Receipt (GRN)

    Date code, lot, quantity and packaging are noted at receipt, and a reel that fails inspection is held apart from usable stock.

  • Batch and Serial Tracking

    Kits record the reels used, so a unit serial leads back to the date code and lot of each component on its boards.

  • Quality Control

    Firmware version, burn-in duration and acceptance readings are logged per serial, and a unit that fails stays on hold.

  • Production Planning

    Orders are released at the correct build standard, and parts on allocation show which planned builds will be held.

  • Service Reports and Proof of Visit

    A returned unit receives a repair report with fault, part replaced and modification applied, filed against the same serial.

  • Audit Trail

    Each release, alternate approval and certificate carries a user and time, so the build chain of any shipped unit can be reviewed.

Services

How we would put it in.

Setup, data migration, integrations and anything built on top.

Who uses it

One system, each person sees their part.

For engineering leads

Release build standards, approve alternates and read the full chain of any serial, from reel to repair.

For purchasing staff

Order from the approved list and see which allocated parts will hold up a board lot.

For line supervisors

Check kits, bag exposure and board lot progress before the placement line starts its changeover.

For test technicians

Flash firmware, run the burn-in chamber and enter acceptance readings against the unit serial.

For quality staff

Review nonconformance reports, repair records and certificates before a batch leaves the dock.

Reports

The numbers the owner asks for.

  • Date codes and lots used in each unit serial
  • Parts on allocation and the builds they affect
  • Moisture-sensitive packages past floor life
  • Firmware version loaded against build standard
  • Burn-in and acceptance failures by fault and part
  • Repairs by modification applied
Good fit

Who this is built for.

  • Makers of line replaceable units for aircraft avionics bays
  • Builders of cockpit displays, radios and sensor boxes
  • Contract assemblers of circuit cards for aerospace customers
  • Harness and box build shops that serialise every unit
  • Repair stations that return avionics to a current build standard
Honest answer

When it is not the right choice.

Made to fit

Adapted to your business before it goes live.

You are not handed a login and left to it. The product is set up around your records, your people and the tools you already use.

Build standards

Your modification status scheme and bill of materials structure are entered the way engineering keeps them.

Test forms

Burn-in and acceptance sheets mirror the procedure the customer signed off, and your test lead confirms each layout.

Approved sources

Your approved manufacturer and distributor lists are loaded with the parts each may supply.

Records brought across

Orders still open, serial history of delivered units and component stock on the shelf come in from your current records.

Tax and currency

Currency, tax invoices and units follow the country and customer you work with.

Works alongside

  • Email
  • Test equipment data import
  • Firmware repository link
  • Barcode and label printers
  • Accounting export
Common questions

Questions owners ask before a demo.

Can I see which date codes are inside a particular unit?

Yes. Kitting records the reels drawn, so a serial opens the date code and lot of each component on its boards, back to the goods inward entry.

How does the system handle approved alternates?

An alternate is added to the bill of materials with a date and a reason. Builds before that date keep the original part, and builds after it use the approved alternate.

Is a warning given for moisture-sensitive parts?

Yes. It logs when a dry bag is opened and compares the elapsed hours with the floor life of the package. A kit past the limit is flagged before it reaches the feeders.

Are firmware versions stored?

Yes. Image name, version and checksum are recorded when the unit is flashed. The acceptance test record then shows which version the unit carried when it passed.

How are repairs recorded?

A returned unit reopens its serial. The fault, the part replaced and any modification are added, and the unit must reach the current standard before retest.

Can we separate parts on allocation?

Yes. Parts marked as on allocation show which open builds depend on them and how long the shortage may last.

Will it certify us for airworthiness?

No. It stores the records. Airworthiness approvals and certification rules stay with your own engineering and quality staff, who answer to the authority.

Is test equipment connected?

Yes, through export files. Readings can be imported from CSV logs of a chamber or bench meter, and the instruments supported are agreed in the quotation.

What does it cost?

The number of users, lines and test stations decides the cost. First comes a demonstration on one of your units, and the written proposal arrives after it.

Can we take the serial histories with us later?

Yes. Build chains, test records and repair history can be exported by serial or part number, in a format fixed in the quotation.

Wondering what it would cost? Share your requirements and an engineer will come back with a scope.

Book a demo

See Avionics Hardware Manufacturer Management Software with your own data.

Tell us how you run things today. We’ll show you the parts that matter to you and say plainly what would need changing.

  • No obligation
  • A reply within one business day
  • Your details stay private

Start with your requirements

Seven short steps that tell us what you need. An engineer reads them before getting in touch.

Share your requirements