Finished stock by stage for material plants
Finished stock by stage shows every unit as in the mould, steam chamber, kiln, sorting bay, ready or dispatched. The sales desk quotes only what can be loaded today. Each pallet sits in one stage at a time, so it is never counted twice by two supervisors.
What a stock-by-stage record shows
Stock is not one number. In a building material plant a paver is cast, then steamed, then fired or dried, then sorted. Each lot is kept in one stage at a time. Sales reads the stage names in the yard’s own words.
From the mould to the loading bay
Stock changes stage several times before it leaves the gate. Picture a block and paver plant. Four moments from one day show who moves a lot forward and who reads the result, and what each person then sees on the page.
Who looks at stock by stage
Stock by stage is read from several desks, each with its own question. Where is the lot, can it be sold, and what is stuck? Four groups share one view. Each gets the answer it needs.
Decisions to settle before stages are set
Stages are the vocabulary of the plant, so they are worth agreeing carefully. Settle the points below with the works head and the supervisors before stock is entered. Sales will read the words you choose.
How stock stages link to production and sales
Finished stock is where production meets selling. It is filled by batches, filtered by test results and drained by dispatch. Orders read from it. Credit holds can pause what is promised. The five links below show the hand-offs on either side of the yard, in order.
- Production batches add units at the mould stage
- Test results release units or hold them out of ready
- Orders and quotes read the ready quantity only
- The weighbridge record moves loaded pallets to dispatched
- Credit holds decide whether ready stock can be promised
Where finished stock stops
The record reflects stage moves that staff enter. It does not count pallets by itself, and it does not see a unit that nobody has moved. A physical count in the yard still settles a disagreement. A yard with one stage, such as air-dried blocks stacked in rows, may do well with a chalk board.
Frequently asked questions
Can the stages match our own process?
Yes, your own stages become the states that stock moves through, whether steam curing, air drying, kiln firing or grading. The sales screen shows them in familiar words. The names are agreed with you at set-up, so nobody learns a new vocabulary.
How is a pallet kept from being counted twice?
A pallet holds one stage at a time. When a supervisor moves it, the earlier stage is cleared and the new one is set. Two people counting on different days read the same record, not two lists.
What does the sales desk see when quoting?
The ready quantity, by product. Units still curing or firing are visible but not offered. Held units are not offered either. The desk can tell a dealer what can be loaded today and what is waiting for a later stage.
What happens to units that fail a test?
They are held out of finished stock until someone signs them off or scraps them. They show as held and not as ready. Sales therefore cannot quote them by accident. Loads are drawn from released batches only.
Who moves units from one stage to the next?
The supervisor in charge of that stage, as the work proceeds. The plant decides who is allowed. Others can read the stage but cannot change it. Moves are entered by hand, not sensed. Barcode scanners would be extra integration work, scoped in the first workshop.
How this feature fits the system.
Building Material Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Orders and dealer price lists
Orders from dealers, contractors and project sites are booked with quantity, delivery date and the account’s own rates, then followed through to the delivery note.
Order ManagementCredit limits and dealer accounts
Each dealer carries a limit and a payment term, and the order desk is warned before a new order takes the balance past either figure.
Credit Limits and ControlMix designs and bills of materials
The recipe for each grade lists cement, sand and aggregate per batch or per unit, so planned quantity can be read against what stores issued.
Bill of MaterialsTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements