Skip to main content
GullySystem

Dealer orders and rate cards for material plants

Orders and dealer price lists keep every request from a dealer, contractor or project site on one list. Each is booked at that account’s own rate card and rebate scheme. Quantity, delivery date and the site contact for unloading are read before any truck is promised.

What an order and a rate card record

Each order line carries the product, grade and unit of sale in the words the plant uses. Beside it sit the account, the rate applied and the rebate scheme in force. It is short to read. It answers what was promised, to whom, and at what price.

Rate card for each account

Each dealer, contractor and project site has a rate card pricing 100 mm solid block, 60 mm interlocking paver or M25 kerbstone. Orders pick up that rate. Staff read the figure from the card, not from memory of an earlier quote.

Rebate scheme on the account

A rebate scheme sits on the account beside the rate card. A line shows which scheme applies. Dealer and desk then read the same terms, and accounts can see the basis for any later credit note.

Quantity and delivery date

Each line holds the quantity ordered, the unit of sale and the date the buyer wants it. Two lines for one product on the same morning appear side by side. That is how a clash is spotted.

Site contact for unloading

The person who receives the load is recorded against the order, together with the site address. Dispatch sees whom to call. A driver reaching a project site with an unattended gate then has a name to ask for.

A day at the plant’s order desk

The order desk opens the list at the start of the shift and works down it. Phone calls, site visits and messages all end up as lines on one page. Take a block and paver plant. One day looks like the four moments below.

Morning call from a dealer

A dealer phones for a truck of 6-inch hollow blocks. The desk opens that dealer’s rate card and books the lines against it, with the rebate scheme applied. The delivery date is agreed during the call.

Sales visit to a contractor

A sales executive returns from a contractor’s car park job with a paver requirement. The desk books it that afternoon. The project site’s rate card applies, and the unloading contact goes onto the line with the quantity and date.

Two sites, one morning

The list shows hollow blocks promised to two sites on the same morning. One date is moved and that site’s contact is told. The clash gets settled at the desk. It never reaches the gate.

A small kerbstone order

A small order for kerbstones sits on the list with its date. Before closing, open orders are read by dealer. That reading carries a minor line forward, so it is not forgotten after a busy day of larger trucks.

Who works from the order list

Four groups open the same list, and each reads a different part of it. No second sheet is kept. Nobody has to ask what was promised, because the page already says so.

Owners and works heads

Open orders and delivered orders by dealer show which accounts are buying. This is a clear view. A walk round the yard stops being the only way to learn what the coming days will ask of the plant.

Sales and order desk

Orders are booked here, with the rate card and the rebate scheme checked on the line. A dealer is told what can be loaded this afternoon. Edits happen on the line itself. Dates and quantities move there.

Supervisors on the press lines

Confirmed orders by product and date are read before the shift begins. The quantity for each press line is clear. No call to the sales office is needed to learn what the day’s casting is for.

Stores, dispatch and accounts

Dispatch reads the delivery date and the unloading contact for each load. Accounts reads the rate and rebate applied. The invoice raised later then matches what the dealer was promised when the order was booked.

Decisions to settle before rate cards go in

A few choices made at the start decide how the order list behaves afterwards. Settle them with the sales head and the accounts head in the first workshop. Do it before any rate card is entered.

Who may change a rate for orders and dealer price lists

Decide who can alter a rate card or a rebate scheme. Edits to price lists come from GullySystem staff when asked. So name one person. Only that person sends the request, and the accounts head approves the figures.

What is left out for orders and dealer price lists

Decide which records stay off the list. Keep it for real commitments. A passing enquiry that never becomes an order need not be entered. Write the rule down, so the desk applies it the same way on every shift.

How old accounts come across

Dealer accounts, rate cards and pending orders are brought over from your ledger or spreadsheet. Unpaid invoices come with them. The accounts head checks a sample before go-live. Any account that does not match is corrected first.

Which report matters first for orders and dealer price lists

Begin with orders open and delivered by dealer. It shows what is promised, what has reached the site and what is still waiting. It is also the page the works head will ask for. Others follow once orders flow.

How orders reach the rest of the plant

An order is the first record in the chain from dealer to invoice. It takes its terms from the dealer account and hands quantities onward to planning, stock and dispatch. Each link below reuses the order line. Nobody types it again, and a corrected date shows wherever the line is read.

  • Credit limits warn the desk before a line is accepted
  • Confirmed orders feed production planning by press line or kiln
  • Finished stock by stage tells the desk what loads today
  • The weighbridge record carries the order into a delivery note
  • The tax invoice is raised from the dispatch record

Where order booking stops

The order list records what was agreed. It does not decide the commercial terms behind it. Rate cards and rebate schemes stay the owner’s agreement with each buyer, and a tax or legal reading of a scheme belongs with the accountant. A small yard turning out a few hundred solid blocks a week for neighbours will cope with a ledger book and a printed rate card.

FAQ

Frequently asked questions

Can a contractor have a different rate from a dealer?

Yes, because each dealer, contractor and project site carries its own rate card and rebate scheme. Each line takes the rate of the account it is booked against. Two buyers of one paver pay differently.

Who updates a rate card when prices change?

GullySystem staff make edits to price lists when asked. A named person at the plant sends the request, with the new rates listed. The accounts head checks the new rates. Only then does the order desk book against them.

Do orders show who will receive the load?

Yes, the site contact for unloading is held on the order, so dispatch can see whom to call. This matters at a project site. The gate may be unattended and the driver needs a name.

Can dealers see their rebate figures on an order?

That is decided with you at set-up. Dealers can be shown rates, orders and deliveries while rebate figures stay hidden. Hidden rebates are a normal setting. The choice is made for each kind of account, not for each order.

What happens to orders already open at go-live?

Pending orders come across with the dealer accounts and rate cards. Before the first new order is booked, the accounts head checks a sample against the old ledger. Nothing already promised drops out of sight.

Where it fits

How this feature fits the system.

Building Material Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Orders and dealer price lists

Orders from dealers, contractors and project sites are booked with quantity, delivery date and the account’s own rates, then followed through to the delivery note.

Order Management

Credit limits and dealer accounts

Each dealer carries a limit and a payment term, and the order desk is warned before a new order takes the balance past either figure.

Credit Limits and Control

Mix designs and bills of materials

The recipe for each grade lists cement, sand and aggregate per batch or per unit, so planned quantity can be read against what stores issued.

Bill of Materials
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements