Weighbridge and dispatch for material plants
Weighbridge and dispatch record gross and tare weight, vehicle number and driver name at the scale. A delivery note prints at the gatehouse. It is linked to the batches that supplied the load, whether pavers, blocks or ready-mix, so each truck leaves with one document.
What a weighbridge ticket keeps
One dispatch record holds everything about a load leaving the gate. The weights, the vehicle and the batches sit together. Later documents read from it, not from memory. The invoice and the delivery note then agree, because both come from one source.
A day at the gatehouse and the scale
Dispatch is where the plant’s promises become trucks. The gatehouse works through a queue of vehicles, and each one passes the scale twice. Follow one tipper. Four moments show how a day runs with one record, from the first empty truck to the last invoice.
Who works at the weighbridge and after it
The weighbridge ticket is made by one person and used by several. Four groups depend on it. Each one reads a different part of the same record, and nobody is asked to retype another’s slip.
Decisions to settle before the first ticket
A weighed ticket ends up in the buyer’s hands. Rules around it should be fixed early. Agree them with the dispatch lead and the accounts head before the gatehouse opens on the new system.
How dispatch links orders, stock and invoices
The dispatch record is the hinge between making and billing. It takes its quantities from orders, its units from released stock and its authority from test results. Billing then reads from it. Billing reads the weight from the ticket. Five hand-offs are listed below, each with a source and a destination.
- Orders supply the destination, quantity and unloading contact
- Finished stock by stage moves loaded pallets to dispatched
- Test results decide which batches may be loaded
- Vehicles and trips take the truck and the site reached
- Invoices are raised from the dispatch record, not retyped
Where dispatch records stop
The ticket is as accurate as the scale and the operator who reads it. It does not calibrate the weighbridge. It files no transport papers for any authority. Those duties stay with the plant owner and the adviser. Pricing a load, deciding credit and settling freight belong to other records. A yard that releases a few loads a week may manage with a gate register.
Frequently asked questions
What appears on the printed delivery note?
The note carries the vehicle number, driver name and the weights from the ticket. Batch numbers are listed. They show where the load was drawn from. The order’s destination and unloading contact appear with them.
Can one load come from more than one batch?
Yes, a load can be linked to every batch that supplied it. Each batch number is printed on the delivery note. Nothing is merged. A complaint can then be matched to the right pour, even on a mixed load.
What stops a failed batch being loaded?
A load can be taken from released batches and no others. A batch whose test failed is held out of finished stock. Nothing held can be chosen. It stays held until someone signs it off or scraps it.
How does the invoice follow the weighbridge ticket?
The tax invoice is raised from the dispatch record. Both weights come from one ticket. The invoice repeats the delivered weight. Short-delivery claims are logged against that delivery, so any dispute starts from one set of figures.
Who may change a ticket after the truck leaves?
Only the person the plant names. A changed weight changes the invoice, so a reason should be given. Corrections should be rare. The works head can ask for the rule to be tightened at any review.
How this feature fits the system.
Building Material Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Orders and dealer price lists
Orders from dealers, contractors and project sites are booked with quantity, delivery date and the account’s own rates, then followed through to the delivery note.
Order ManagementCredit limits and dealer accounts
Each dealer carries a limit and a payment term, and the order desk is warned before a new order takes the balance past either figure.
Credit Limits and ControlMix designs and bills of materials
The recipe for each grade lists cement, sand and aggregate per batch or per unit, so planned quantity can be read against what stores issued.
Bill of MaterialsTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements