Skip to main content
GullySystem

Raw material stock and purchasing for material plants

Raw material stock and purchasing follow cement, aggregate, clay, fly ash, admixtures, diesel and kiln fuel from supplier receipt to batch issue. When a level falls below the figure set for it, an alert appears. Silo and yard bin balances are read together by stores and the buyer.

What a raw material stock record holds

Each material has one running balance, kept in its own unit. Receipts raise it and batch issues lower it. Nothing else moves it without a reason on record. That figure is what stores should find in the silo and the yard bin.

Receipts from each supplier

Cement, aggregate, clay, fly ash, admixtures, diesel and kiln fuel are received against the supplier that sent them. Each receipt raises the balance. The record shows what arrived and from whom, ready for the accountant’s bill check.

Silo and yard bin together

Cement may sit in a silo while sand and aggregate lie in yard bins. The balances are read together. Nobody adds two registers by hand. Fine aggregate in Yard 2 is one line, alongside the cement silo, on one screen.

Issues against batch numbers

Every issue to the mixer or the kiln is posted against a batch number. Stock falls by what was drawn. Planned use from the mix design sits beside the issue, so the difference is visible.

Reorder level for each material for Raw material stock and purchasing

A reorder level is set for each material. When the balance falls below it, an alert appears. The level reflects how long a supplier takes to deliver. Only the plant itself can judge that, so the figure is entered by the plant.

The stores yard through a working day

Material stock is touched at the gate, at the store counter and at the bin. Take one ordinary day. Four moments follow. In each, the balance is corrected while the event is fresh, not left to be found later at stock-taking.

A truck of fly ash arrives

A supplier’s truck reaches the gate with fly ash. Stores books it against that supplier on arrival. The balance rises. The receipt then waits for the supplier’s bill to be checked against it by accounts.

Cement issued to a batch

At the start of a pour, the storekeeper issues cement against the batch number. The planned quantity from the recipe is shown. An issue above plan is seen at the counter and does not wait for later.

Fine aggregate falls below level

At 14:15 the screen shows raw material below reorder: fine aggregate in Yard 2. The buyer sees it before the bin empties. A supplier is called, and the press line is not left waiting for aggregate.

Fuel for kiln and tipper

Diesel and kiln fuel are received and issued like any other material. Each has a balance. The supervisor can see what remains before a firing day. A fuel shortage then becomes a planned purchase, not a stoppage.

Who relies on the material balance

Stores keys the movements, but the balance serves several desks. Four groups read it for different reasons. They need not telephone the store to learn what is in the yard.

Owners and works heads

They read raw material used against the mix design and the list of materials below reorder. It joins cost and supply on one page. A walk round the bins is no longer the only check.

Press line supervisors

Before a run, supervisors need to know that cement, aggregate and clay are present. The plan checks quantities against the mix design. Any shortfall surfaces early. Casting is not started and then abandoned half way.

Lab and quality team

When a cube result is weak, the lab reads what the batch actually drew. Cement and fly ash issued show beside the recipe. That narrows the search. A cause can then be checked in the records, not guessed.

Stores, dispatch and accounts

Stores keys receipts and issues, and reads reorder alerts. Accounts uses receipts to check supplier bills. Exports go to its accounting software for the books. Dispatch reads the same list for the fuel its own tippers need.

Decisions to settle before stock goes in

Settle the points below with the stores head and the plant head before opening balances are entered. They fix how every later figure is read.

Who may adjust a balance for Raw material stock and purchasing

Decide who can post a correction when a count disagrees with the screen. Only that person may. Everyone else may receive and issue only. Keep the reason for each adjustment, so the works head can read it later.

What is left out for Raw material stock and purchasing

Decide which items are tracked. Cement, aggregate, clay and fly ash clearly are. Small consumables, such as grease or packing strap, may stay outside. Write the list down so stores applies it the same way.

How opening balances come across for Raw material stock and purchasing

Opening balances come from the plant’s stock registers. Before the first batch is logged, the stores head recounts a sample in the yard. Count first, then enter. Silos and bins are measured by the plant’s own method.

Which report matters first for Raw material stock and purchasing

Read raw material used against the mix design first. It shows drift in cement or fly ash use within days, not at stock-taking. Reorder alerts become reliable once balances are right. Cement and fly ash come first, since a recipe cannot run without them.

How material stock feeds batches and costs

Raw material stock is the supply side of production. It receives from suppliers, hands quantities to batches and signals when buying is due. The five links below show where its figures go and where its quantities come from. Each link is a hand-off. Nothing is keyed twice.

  • Mix designs give the planned quantity for each material
  • Production batches draw cement and aggregate from the balance
  • Test results are read beside what a batch drew
  • Confirmed dealer orders show how much material is coming
  • Accounting software export carries receipts to the accountant

Where material stock stops

Stores enters the receipts and issues that build the balance. It reads no silo gauge. Connecting an instrument would be extra integration work, scoped separately. Supplier prices, payment terms and the valuation of stock stay with the owner and the accountant. A yard with one bin and one supplier may manage with a plain notebook and a regular count.

FAQ

Frequently asked questions

How are silo and yard bin balances shown together?

Each material has its own line, whether it sits in a silo or a yard bin. One screen shows them all. Cement, fine aggregate and fly ash appear together. Stores does not hunt through separate registers or add them up by hand.

What happens when aggregate falls below reorder level?

An alert appears for that material, such as fine aggregate in Yard 2. The buyer sees it. The bin is not yet empty. The plant decides how much to order and from which supplier, since prices and terms are its own.

Can diesel and kiln fuel be tracked too?

Yes, diesel and kiln fuel are received and issued like cement or clay. Each has a balance and a reorder level. Whoever fires the kiln can see what remains in advance. A tipper’s diesel is tracked as well.

Who sets the reorder level for each material?

The plant does, with the stores head. The level depends on how a supplier delivers, which only your team knows. A distant supplier needs a higher level than a near one. GullySystem staff enter it and change it when asked.

Does the balance come from a silo gauge?

Balances come from receipts and issues entered by stores. A physical check against the silo or bin keeps them honest. Instruments are separate. Connecting any of them is extra work, scoped in the first workshop.

Where it fits

How this feature fits the system.

Building Material Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Orders and dealer price lists

Orders from dealers, contractors and project sites are booked with quantity, delivery date and the account’s own rates, then followed through to the delivery note.

Order Management

Credit limits and dealer accounts

Each dealer carries a limit and a payment term, and the order desk is warned before a new order takes the balance past either figure.

Credit Limits and Control

Mix designs and bills of materials

The recipe for each grade lists cement, sand and aggregate per batch or per unit, so planned quantity can be read against what stores issued.

Bill of Materials
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements