Skip to main content
GullySystem
Manufacturing · Control Panel Manufacturer Management Software

One system for panel quotes, schematic revisions, MCCB and VFD orders, ferruling jobs and megger test sheets.

Each cabinet is one record, from the customer’s single-line diagram and load list to the as-built set, with every MCCB, contactor and VFD fitted listed beside the schematic revision. It also holds the horizontal busbar rating and the insulation readings taken before dispatch. Everyone reads one page. Years later, a service engineer standing at a live cabinet opens the wiring actually fitted, including the contactor of another make that replaced the specified one.

  • Busbar, enclosure and gland plate rates entered as your estimators price them
  • Open panels, schematic revisions and supplier orders carried over from your sheets
  • Test sheet layouts that follow your own megger and functional routine

Price a panel from its load list, release only the approved schematic revision, order VFDs and air circuit breakers per cabinet, and record megger and functional readings against the serial. Nameplate data and the as-built set stay on that record. Service starts there.

Where it breaks today

What goes wrong before the software.

Wiring teams hold an older print

The design office issues schematic revision C while the bay is mid-wire, and ferruling and lug crimping carry on from revision B on a printout nobody recalled from the bench. The fault surfaces at functional test, after the doors are hung.

Substitutions never reach the drawing

A contactor of another make goes in because the specified coil voltage is out of stock, and the as-built list and the schematic then disagree. The service engineer discovers it on site with a torch in hand.

Late drives hold hidden panels

One VFD or air circuit breaker can hold a whole cabinet. The buyer knows which, yet the project manager sees only a dispatch date that keeps sliding, and nobody can name the panel that waits.

Enclosure and busbar costs are guessed

Copper bar weight, enclosure size, gland plates and powder coating are priced from last year’s sheet, so the quoted cost and the final cabinet cost drift apart. Margin leaks away quietly, one cabinet after another.

Test sheets sit in a folder

Insulation resistance, earth continuity and functional checks go on paper, and a year on the customer asks for the report on panel 0381. Nobody can find that sheet, and the cabinet is already commissioned.

Nameplate data is retyped

Rated current, short-circuit withstand, supply voltage and serial are typed again for the engraved plate, and one slipped digit puts a wrong rating on a finished cabinet. A riveted plate cannot be corrected on site.

How it runs

How the work flows through it, step by step.

  1. 1

    Enquiry and load list

    A customer sends a single-line diagram and load list, and each DOL starter, star-delta set, feeder and control function is entered before the panel type is chosen. Nothing is retyped later.

  2. 2

    Quotation

    The panel is priced from enclosure, busbar, component and labour rates, and because customers keep changing motor ratings, every revision of the offer is kept with the figures that were sent. Old offers stay readable.

  3. 3

    Drawings and approval

    General arrangement and schematic revisions go out for comment, remarks are logged by round, and only the approved revision is released to the wiring bay. Older prints are withdrawn at once.

  4. 4

    Procurement and kitting

    The component list becomes supplier orders for MCCBs, thermal overload relays and DIN rail terminal blocks, and parts that arrive are checked against the list and kitted to the cabinet. Shortages show early.

  5. 5

    Build, wiring and test

    The bay cuts the enclosure, mounts the back plate, then wires and ferrules the cabinet, and the test engineer records megger and functional readings against the approved drawing. A witnessed test carries the witness’s name.

  6. 6

    Dispatch and service

    As-built drawings, the test sheet and nameplate details travel with the delivery note, and later site calls are logged against the cabinet serial. The record stays open for the life of the panel.

Modules

What is inside.

Every module can be switched on, left out or changed to match how your team already works.

Load list enquiries

Enter motors, feeders and control functions from the customer’s load list, then pick the panel type, whether an MCC bay with withdrawable starters or a changeover panel with an ATS controller. Enquiries start here.

Panel pricing

Price enclosure, tinned copper bar, components and labour from rate tables, and keep every revision of the offer that went out. Compare any two side by side.

Drawing revisions

Hold general arrangement and schematic revisions with their comment rounds, and mark the single one approved for release to the bay. Every other print is locked out of circulation.

Panel component lists

List the MCCBs, contactors, relays and terminal blocks for each cabinet, with any substituted make shown beside the specified one. Totals follow without a second spreadsheet.

Component orders and lead times

Raise supplier orders per panel and watch the promised date of every drive and breaker, so that a late line names the cabinet and the customer it holds. Chasing becomes specific.

Component store and kitting

Receive parts by lot and kit them to the cabinet, with reorder levels for ferrules, cable lugs, end clamps and control cable. Shortfalls show at kitting, not at the wiring bench.

Cabinet build jobs

Follow each cabinet through enclosure fabrication, back plate mounting, wiring and ferruling, with the wiring team named at every stage. The office reads progress without walking the bay.

Outside fabrication

Send enclosures and busbars out for punching, bending or powder coating, and check the quantity that comes back against the quantity sent. Short returns are flagged on the day.

Insulation and functional tests

Record insulation resistance, earth continuity and functional readings with the witness sign-off, against the cabinet and its approved drawing. A failed reading sends it back to the bay.

Serials and nameplates

Give each cabinet a serial and print the nameplate from the record, with rated current, short-circuit withstand and supply voltage. Nobody retypes a rating from a drawing.

Site calls and warranty

Log commissioning visits and fault calls against the cabinet serial, with the as-built set and the test sheet one click away. The engineer reaches the site already prepared.

Stage invoices

Raise advance, delivery and commissioning invoices against the panel order, and see the dues for each customer with the oldest first, so that part payments stay matched to the right cabinet. Dues are never guessed.

Solutions inside

The business modules it is built from.

Each one is also available on its own, or inside a system built for you.

  • Estimate/Quotation Management

    Offers are built from enclosure, copper bar, component and labour rates for each panel type, and every revised figure that went to the customer is kept beside the new one.

  • Workflow and Approvals

    Schematic and general arrangement revisions pass through the customer’s comment rounds, and the wiring bay receives only the approved revision. Older prints are withdrawn from circulation.

  • Bill of Materials

    MCCBs, contactors, relays and terminals are listed per cabinet, and each substituted make is recorded so the as-built list matches the drawing on the day of dispatch.

  • Purchase Order Management

    Supplier orders for VFDs and air circuit breakers are raised per panel, with each promised date shown against the cabinet and customer it holds up.

  • Stock Tracking and Alerts

    Ferrules, lugs, cable and common contactors are received by lot, kitted to cabinets and watched against reorder levels so the bay never waits at the bench.

  • Work Order Management

    Each cabinet moves through fabrication, back plate mounting and wiring with a named team, and the office can read the current stage without walking the bay.

  • Quality Control

    Megger, continuity and functional readings are entered per cabinet against the agreed limits, and a failed reading returns the panel to the bay with a remark.

  • Job Work Management

    Enclosures and busbars sent for cutting, bending or powder coating are tracked as outside jobs with a return date and checked against quantity on return.

Services

How we would put it in.

Setup, data migration, integrations and anything built on top.

Who uses it

One system, each person sees their part.

For panel designers

Release schematics, answer customer comments on each revision, and see which revision every cabinet in the bay is built to. Stale prints stop circulating from the first release.

For the purchase desk

Raise component orders per panel and chase the VFDs and air circuit breakers that are running late, with the cabinet and customer named on every line. No more bare order numbers.

For store staff

Receive components against the list, flag any substitution, and kit lugs, ferrules, relays and breakers to the right cabinet. Leftover pieces go back to stock with their lot.

For wiring supervisors

See which cabinets have their kit and approved drawing, assign wiring teams, and mark stages complete. A cabinet without a full kit cannot start, so benches stay busy.

For test engineers

Enter megger and functional readings, note who witnessed the test, and send a failed cabinet back with a remark. The report prints from the same record, with the serial on top.

Reports

The numbers the owner asks for.

  • Panels by build stage and customer
  • Schematic revisions awaiting approval by age
  • Late VFDs and breakers by the panel they hold
  • Megger and functional failures by type and cabinet
  • Quoted against actual enclosure, busbar and component cost
  • Open site calls by cabinet serial
Good fit

Who this is built for.

  • Builders of motor control centres and power control panels
  • Makers of PLC and automation control boards for machines
  • Workshops that build power factor correction, ATS and distribution panels
  • Panel shops working for OEMs and project contractors
  • Firms that buy in VFDs and breakers and assemble to drawing
Honest answer

When it is not the right choice.

  • A site electrician who wires one small distribution board a month can work from a notebook.
  • Companies that only trade in ready-made enclosures have no schematic revisions to control.
Made to fit

Adapted to your business before it goes live.

You are not handed a login and left to it. The product is set up around your records, your people and the tools you already use.

Panel types

Motor control, power control and automation panels are set up with the build stages your bay follows, from back plate mounting to ferruling and door-mounted devices.

Component catalogue

Makes, ratings and reorder levels for MCCBs, contactors and terminals are loaded with the suppliers you buy from, so the first component list needs no retyping.

Test sheet layouts

Megger readings and limits follow your inspection routine and whatever each customer’s specification asks for. The layouts are yours, down to the column order.

Opening records

Panels in progress, drawing revisions and supplier orders are copied in from the workbooks your office keeps, and the design office checks them before real orders begin on the new system.

Currency and tax

Quotes for a control panel can be priced in the buyer’s money, and the invoice applies whatever tax rules govern that buyer’s country. Exports follow the same rule.

Works alongside

  • Email
  • WhatsApp
  • Accounting export
  • Label printer
  • Drawing file storage
Common questions

Questions owners ask before a demo.

Can a revision be locked once the customer approves it?

Yes. An approved schematic is marked released, any later change becomes a new revision with its own comment round, and the bay sees only the released one. Older prints are withdrawn from every bench.

How are substitutions handled?

The store records the part actually fitted against the panel, so the component list shows the specified contactor and its substitute side by side. The as-built set is therefore true to the cabinet.

Does it show which late drive holds which cabinet?

Yes. Every supplier order line carries a promised date and the panel it serves, so a late VFD names the cabinet and the customer waiting, not a bare order number.

Can it price enclosure and busbar by size?

Yes. Rates for enclosures, copper bar, gland plates and powder coating are kept per size, and a quotation picks them up from the panel type and busbar rating with no stale sheet.

Where are insulation readings stored?

They sit on the cabinet’s record, beside the schematic revision it was built to. A failed megger reading sends the cabinet back to the bay with a remark attached.

Can nameplates be printed from the record?

Yes. Rated current, supply voltage, short-circuit rating and serial print from the cabinet record on a plate layout taken from your own template. No digit is retyped by hand.

How does it handle outside sheet-metal work?

Enclosures sent out for punching or powder coating are logged as outside jobs with a return date, and receipt back is checked against the quantity sent. Short returns are caught at the gate.

Can service calls be linked to a cabinet?

Yes. A call from the customer is logged against the cabinet serial, and before setting out, the engineer opens the as-built drawings and the test sheet for that exact panel.

Do we lose our earlier panel jobs?

No. Past panels, drawings and open orders load from your spreadsheets, and someone from your accounts team checks the balances against the old sheets before real orders begin.

What does a first conversation involve?

Bring a recent panel with its single-line diagram and component list. You see it run on the system, and a proposal follows once users and modules are agreed.

Wondering what it would cost? Share your requirements and an engineer will come back with a scope.

Book a demo

See Control Panel Manufacturer Management Software with your own data.

Tell us how you run things today. We’ll show you the parts that matter to you and say plainly what would need changing.

  • No obligation
  • A reply within one business day
  • Your details stay private

Start with your requirements

Seven short steps that tell us what you need. An engineer reads them before getting in touch.

Share your requirements