Skip to main content
GullySystem

Workshop jobs and servicing for hire machines

Workshop jobs and servicing gives the hire yard’s workshop a job card for each repair and a service schedule for each machine class. Hours recorded at return show what is due. Spares and labour are written against the unit, and the counter learns when a machine is ready to hire again.

What a workshop job card keeps

A job card is the workshop’s record of one piece of work on one machine. It opens when a unit comes back needing attention, or when a service falls due. It closes when the unit is marked ready. One card covers one job.

Fault, unit and job type

The card names the unit, says whether the job is a repair or a service, and describes the fault. A split hydraulic hose and a worn track pad are separate cards. Each is easy to find later by machine.

Spares fitted to the unit

Each filter, hose, bucket tooth or other part fitted is written against the machine that received it. The last change is easy to see. The owner sees what each machine costs in spares and parts.

Labour recorded on the job

Time spent by each fitter is recorded on the card. Labour then sits beside spares, so the cost of a repair is whole. Over a year, the figures show which machines keep the fitters busiest. Cost is plain.

Status passed to the counter

A card is open, in progress, waiting for spares or finished. While it is open, the unit stays on the ramp in the calendar. Marking it ready releases the machine. The counter sees the change.

Servicing and repairs through the week

Workshop work runs on two clocks. One is the hour meter, which counts up with every hire. The other is the calendar, which brings dates round. These moments show both at work in a yard week. They are routine jobs.

A machine returns from site

A telehandler comes back and the yard clerk records the hour meter reading. The reading is checked against the class’s service rule. Filters and lubrication are due. A service card is opened before the next hire is promised.

A hose splits on a site

A site rings about a leaking hydraulic hose on a mini digger. A repair card is raised for the unit. It shows as unavailable from that day, and a like-for-like unit is offered as a swap.

Greasing visits to the field

Some machines stay on hire for weeks. The office sees which are due a greasing visit and passes the list to the workshop. A fitter travels out. The visit is logged against the machine and its contract.

Marking a unit ready

The fitter finishes the work, notes the spares and labour, and marks the unit ready. The machine rejoins the available list at that moment. A plate compactor can be offered the same afternoon. The release is recorded.

Who works from job cards

Job cards belong mainly to the workshop. Other roles lean on them all the same. A repair affects what the counter can promise, what the owner earns and what the yard expects at the gate. Each role reads from one card.

Owners weighing repair cost

Owners read repair, spares and attachment cost against each machine and set it beside earnings. A machine that earns less than it costs stands out. Replacing it becomes a matter of figures. Feeling plays no part.

Counter staff promising machines

Counter staff see whether a unit is on the ramp and when the workshop expects it ready. No hirer is promised a machine with its grease, hoses and air filters undone. Answers to hirers are firm.

Yard handing over to workshop

Drivers and yard staff see which returned machines were passed to the workshop and which went straight back to the available list. Damage noted at the gate goes onto the card. Nothing is carried by word of mouth.

Workshop staff running the ramp

Workshop staff open job cards for returned machines, record spares and labour, and mark a unit ready for hire. The ramp is theirs. Greasing, filters and hose checks are listed per class. Fitters know what to do.

Decisions about the workshop before set-up

Servicing rules differ between a plate compactor and a boom lift. Settle these four points with the workshop lead and the owner. The yard then starts with rules that match the machines it owns. Keep it practical.

Who may mark a unit ready

Decide who may release a machine from the ramp. The workshop lead alone is one choice. A second person may be allowed for simple jobs. The mark carries a name, so any release can be traced.

What a service rule contains

For each class, list the hours or dates that bring a service due. List the tasks that go with it, such as greasing, filters, undercarriage and hose checks. Take the intervals from the manufacturer’s manual.

Past service history

Bring across each machine’s last service date and last hour reading from your fleet list or workshop book. Without them, the schedule starts blind. Every machine then looks due at once or not at all.

Which report to read first for Workshop jobs and servicing

Servicing due by hours or by date is the report the workshop lead opens first. Decide who reads it each morning and who raises the cards. Cost reports can wait until data builds up. Start with what is due.

How the workshop links to the rest of hire

This feature sits at the end of every hire and the start of the next. It takes readings and damage from the return, and gives status back to the counter. Cost goes to the equipment register. The loop closes there, ready for the next hire.

  • Condition checks supply damage notes and hour readings at return
  • Equipment register holds service rules by class and cost by unit
  • Availability calendar keeps the unit on the ramp until ready
  • Rental contracts carry any damage charge raised after a repair
  • Delivery and collection bring faulty machines back to the yard

Where workshop jobs and servicing stop

This feature records work and reminds the workshop what is due. It does not diagnose a fault, set a service interval, or certify that a machine is safe. The manufacturer’s manual, the workshop lead and any statutory inspector decide those. It does not order parts from a supplier. A yard with a few machines can keep a service diary.

FAQ

Frequently asked questions

Can a job card be raised from a site call?

Either the counter or the workshop opens a card for the unit while the call is on. The fault is written down and the machine is marked unavailable. A swap is arranged in the same sitting. Both steps are quick.

How does the counter know a unit is ready?

The workshop marks the job card finished and the unit ready. The calendar then lists the unit as available. Until that mark, staff see only the ramp status. No promise is made to a hirer.

Are service rules the same for every machine?

Rules are set for each class. A plate compactor and a boom lift follow different intervals and different task lists. A machine in a class takes the rule of that class when it is added.

Can repair cost be compared between machines?

Spares and labour are written against each unit, so repair, spares and attachment cost can be read for any machine or class. The owner then sets that against earnings. What stays in the fleet is the owner’s call.

What happens to a job card when a part must be ordered?

The card stays open with a waiting status. The unit stays on the ramp. When the part arrives and the fitter records it, work resumes. Counter staff see the delay and can offer a swap.

Where it fits

How this feature fits the system.

Equipment Rental Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and customers

Every enquiry is logged with its source, dates and site, so a request for a machine is followed up from the counter and not lost.

Lead Management

Equipment register

Each excavator, lift or generator is held with its serial number, attachments, location and purchase details, and its hire history grows on the same record.

Fixed Asset Register

Quotations and rate cards

A quotation is priced from the rate card for the machine class and hire basis, with operator and transport lines added and every revision kept.

Quote & Proposal Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements