Scheduling forklift technicians and service vans

A forklift workshop sends fitters and vans to several customers each day. Technician scheduling places the day’s jobs against the people and the vans that will do them. Fitters then open assigned work on a phone, with the truck’s serial number and last service already in view when the visit starts.

What the technician schedule keeps

A schedule is a list of jobs set against fitters and vans for one day. The workshop controller builds it from breakdown calls and planned services. It changes as the day goes. Every change stays visible to the people it affects.

Jobs placed against fitters

Each job on the day carries its customer, truck, fault or service type and the fitter chosen. A fitter sees only that list. Unassigned jobs stand apart on the controller’s screen, so none is forgotten.

Vans and their stock

Every fitter works from a van, and the van carries parts. Scheduling names the van with the fitter, so the parts counter knows which stock is going out. Filters for a planned service are loaded before departure. Vans do not leave blind.

Order of visits through the day

Jobs are placed in the order the controller wants them done, with breakdowns pushed up the list. A customer who is waiting on a stalled truck comes before a routine check. The order can be changed on the day.

Truck details on the job

Each assigned job shows the truck’s serial number, model and last service. The fitter does not search for them. If the previous visit left a note about a weeping hose, that note is the first thing read.

Placing fitters through a workshop day

Scheduling is done early and then adjusted, because forklifts fail at awkward moments. The four moments below show how the controller, the fitters and the parts counter use the plan between first light and the last visit. Each acts at a different time.

Building the day before eight

Before the first fitter arrives, the controller lists planned services and open breakdowns, then assigns each to a fitter and a van. A 500 hour service goes to the fitter who knows that fleet. The list is ready by eight.

A fitter opens the first job

One fitter starts the day by opening the first assigned job on a phone. The serial number and last service are in view. Nothing is copied from a whiteboard. The drive to the customer begins already briefed.

A breakdown interrupts the plan

A reach truck stalls at a cold store while every fitter is elsewhere. A lower priority job moves to the afternoon and the breakdown takes its place. The fitter’s phone shows the change at once.

Two vans, one yard

Two jobs fall at the same customer’s yard. Seeing both, the controller sends one fitter with one van. Nobody drives to a yard a colleague is already visiting. That time goes back to the workshop.

Who uses the schedule and what appears

The schedule is read by the fitters, the controller, the parts counter and management, and each sees a different cut of it. Rights decide who may assign or move a job. Fitters see their own work.

For owners and managers

Owners see service jobs by status and technician, so a heavily loaded fitter or an idle van is obvious. The same screen shows trucks on hire and due back. Workload is judged from the plan. Complaints come later.

For the workshop and technicians

Each fitter works from an assigned list on a phone and photographs a cracked fork or stretched chain on the spot. Hours, findings and parts go on the job before the visit closes. Closed jobs flow back to the office.

For the parts counter

The parts counter reads tomorrow’s plan and loads the vans. Filters for a planned service, hoses for a known fault and a replacement battery are put aside by job. Issues name the truck. Stock on each van is accounted for.

For the sales desk

Salespeople ask whether a delivery preparation can be slotted for a new truck going out to a customer. They see which fitter is placed. A customer promised a handover on Friday gets a straight answer.

Decisions before technician scheduling starts

A schedule is useful only when the workshop controller and the fitters agree how it is used. Four choices settle that. They are worth deciding with GullySystem in the first workshop. Write down the rules.

Who may assign and reassign

Decide whether only the workshop controller moves jobs, or whether a fitter may swap with a colleague. Reassignments should show who made them. Fitters should know when a job has moved away from them. Surprises cost time.

What each van carries

Agree which parts are held on each van and which are issued job by job. Common items such as filters and hoses can sit on the van. Costly parts are issued from the store when a job needs them. Keep it short.

How today’s jobs come across

Open jobs and the fitters who hold them are keyed or loaded before go-live. Whoever plans the day checks them against the whiteboard or book in use. Once the two agree, the board is put away. Then the plan is the one record.

Which report matters first for technician scheduling

Start with service jobs by status and technician. It shows who holds what, and which jobs have stalled. Review it with the fitters, since they will see whether their own list looks right. Their view corrects the plan.

How scheduling hands work to other features

Scheduling decides who does a job and when, and it relies on other features for the job itself and for the parts that go with it. The links below show what arrives in the schedule and what leaves it once the visit is done. Each is a hand-off.

  • Due services arrive from service plans and reminders
  • Breakdown calls arrive as service jobs and job cards
  • Truck serial number and last service come from the register
  • Van loading draws on spares, batteries and chargers
  • Closed visits pass to invoices, receipts and dues

Where technician scheduling stops

Scheduling places jobs against people and vans. It does not track a van on the road, and there is no GPS or live map. It does not work out the shortest route, and it does not decide who is qualified for which truck. Those judgements stay with the workshop controller. A workshop with two fitters can plan on a board.

FAQ

Frequently asked questions

Can a fitter see the day’s jobs on a phone?

Yes. Fitters open assigned work in the phone browser, with the serial number and last service in view. The job screen needs a connection, so a fitter in a dead-signal corner of the yard enters notes later. Plans stay readable.

What happens when a breakdown arrives mid-day?

The controller raises a job, picks a fitter and moves lower priority work if needed. The fitter’s list updates. The displaced job is reassigned, not dropped, so the customer waiting for a routine visit still gets one.

Does scheduling show where each van is?

No. There is no GPS or live map of vans. A fitter’s place is whatever the assigned job says. A telematics unit would be separate work, agreed and priced on its own. Ask us when you are ready.

Can we see how busy each technician is?

Service jobs by status and technician show who holds what and which jobs are open or waiting for a part. An owner can see an overloaded fitter and move work before customers complain. Balance is visible.

Can the plan include vans as well as people?

Yes. A job is placed against a fitter and a van together. The parts counter then knows which stock goes out on which van. Two jobs competing for one van are visible. Clashes are caught early.

Where it fits

How this feature fits the system.

Forklift Dealer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and quotations

A quotation is built from the truck models, attachments and battery options on file, and every revision stays with the enquiry.

Quote & Proposal Management

Machine register by serial number

Each truck, battery and charger carries its own serial number, so a sale, a hire and a repair all point back to one machine.

Batch and Serial Tracking

Hire contracts and off-hire checks

A hire contract holds the rate, the period, the opening hours and the return condition, so billing follows what was agreed.

Contract Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements