Shift output and haul log for mining

The shift output and haul log keeps every trip, load, working hour and delay against the machine and the shift that made it. Operators key entries into a phone at the face. Supervisors and managers read the totals straight away, and nobody adds up paper count sheets afterwards.

What a shift and haul entry records

Each entry belongs to a machine, a shift and a place on the site. The person who did the work makes it. Short fields keep it quick in a cab. The record builds a shift total as entries arrive, so nobody waits for the paper to be collected.

Trips and loads per machine

A haul trip is booked against a truck, a driver and a route. Loads are counted trip by trip. A dumper that ran from the face to the crusher shows its own count, apart from every other truck.

Working hours of each machine

Engine hours are keyed at start and finish. The loader, dozer or drill rig keeps its own running total, with no sharing of one count between machines. Those hours later feed the equipment register and the service plan for that machine.

Delays and their reasons

Waiting for a blast, a flat tyre or a queue at the crusher is entered as a delay with a reason. The shift total then shows lost time. Argument about where the hours went is replaced by entries.

Shift, crew and location

Every entry names the shift, the crew and the bench or pit. Night shift on Pit 2 is read apart from day shift. Notes for handover notes sit beside the figures. The next supervisor reads both.

A shift from first load to handover

The log is filled as the shift runs, not written up at the end. Follow one shift and the pattern is plain. The people at the face enter what happened, and the office sees it before the shift is over.

Operators sign in at start

The driver opens the shift on a phone and sees the machine assigned for the day. Starting hours are keyed. Trips follow as they happen. A site without signal holds them until it is back in range.

The supervisor watches the pit

From the pit office the supervisor sees which machines are working, waiting or under repair across the pit. A silent truck stands out. That is the cue to walk down and ask the driver what is wrong.

A breakdown interrupts a haul

A hydraulic fault on Loader 03 is reported from the cab. Delay time starts on that machine. The trucks waiting beside it log their own delays, so the cost of one fault becomes visible across the whole pit.

Handover to the next crew

At the change of shift the supervisor closes the log. A note on open work goes with it. Totals for trips, loads and hours are already summed, and the incoming supervisor reads both before the crew moves out.

Who enters and who reads the haul log

The same figures reach everyone, but each role sees them cut differently. Operators enter the trips. Supervisors check them as they land. Managers and the office read the totals that result, with no second tally kept.

For operators and drivers

Drivers log hours and trips from a phone and report a fault from the cab before the shift ends. The screen is short on purpose. It asks for the trip, the load and any delay, and nothing else.

For shift supervisors

Supervisors plan the shift, record trips and delays and check entries as they arrive. A missing count is chased while the driver is still on site. Paper would show it tomorrow. This shows it now.

For owners and managers

Managers read output and delays by site, shift and machine. Pits can be compared on cost per tonne moved once fuel and hours sit beside trips. No month-end workbook is needed. The numbers are already there.

For the mine office

The office compares logged trips with weighbridge tickets and contractor bills. Where a hired tipper claims more trips than the log shows, the difference is a plain list. It is ready to discuss with the contractor.

Decisions before the haul log goes live

A haul log is only as clear as its questions. Settle a few points with the supervisors. The answers set the time an entry takes in the cab. They also decide how far the totals can be trusted.

Who may correct an entry for Shift output and haul log

Decide whether a driver can edit a trip after saving, or only the supervisor. Honest slips do happen on a long shift. Pick a rule so an altered figure leaves a trace and nobody doubts the shift total.

What counts as a delay

List the delay reasons your crews actually give, such as waiting for a blast, fuel, no loader or weather. Leave out reasons nobody uses. Short lists get filled in. Long ones get skipped by tired drivers.

How earlier output comes across

Past shift totals can be loaded from your sheets so the first comparisons have something behind them. Loose paper count sheets seldom need typing in at all, and the totals carry the history.

Which total matters first for Shift output and haul log

Choose one figure to trust first, perhaps trips per truck or output per shift on a single bench. Check it against the weighbridge for a few shifts. Do the two agree? Then the rest can be read with confidence.

How the haul log feeds the rest

Trips and hours entered at the face are the raw material for other screens. Places and machines come from the set-up records. Then it hands the totals on. One entry is made, and several people use it, from the pit office to the accounts desk.

  • Sites, benches and stockpiles supply the locations trips are booked to
  • Equipment register and hours receives engine hours from each shift
  • Fuel, spares and store compares diesel issued with hours worked
  • Contractors and purchase orders checks hired trips against this log
  • Reports and dashboards turn the entries into output and cost per tonne

Where the haul log stops

This feature records what people enter. It does not track vehicles by satellite, and it does not measure a load on its own. A trip count is not a weight, so tonnes sold still come from the weighbridge ticket. Fleet dispatch optimisation belongs to specialist software. A small quarry with one truck and one driver can keep a simple notebook and still be fine.

FAQ

Frequently asked questions

Can drivers enter trips from the cab?

Drivers open the shift on a phone. Trips, hours and delays go in as they happen from the cab or beside the machine. A site without signal holds the entries until it is back in range, and nothing is lost.

Does the log track trucks by GPS?

It does not. The product records hours, trips, fuel and maintenance entered by your own people. It can receive figures from other systems you already run, but it never follows a vehicle on a map.

How is a haul trip different from a weighed load?

A trip is counted at the face. A weighed load is measured at the gate. Both are kept, so the office can set trip counts against tickets and see exactly where the two disagree on any day.

Can a delay be tied to a breakdown job?

Both sit against the same machine. A delay is entered on it and the breakdown job is raised on it. That keeps lost time and repair history together. The maintenance supervisor sees the hours a fault cost the pit. Spares used sit on the same job.

What happens if a driver forgets to log a trip?

The supervisor sees a gap against that truck during the shift and asks the driver. Entries can be added before the log closes. After that, a correction follows the rule you set for changes, as agreed with the manager.

Where it fits

How this feature fits the system.

Mining Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Equipment register and hours

Each loader, truck, drill and crusher is held with its operator, hours and service due date, so planners see what is available.

Fixed Asset Register

Maintenance and breakdown jobs

A job card records the fault, the mechanic, parts fitted and hours spent, and the repair history stays with that machine.

Job Cards

Fuel, spares and store

Diesel, tyres, bits and lubricants are booked in and issued against a machine, and an alert shows when a fast-moving spare falls low.

Stock Tracking and Alerts
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements