Skip to main content
GullySystem
Manufacturing · Precision Forging Company Management Software

One record for billet heats, dies, forging lots and outside treatment.

Follow a forging from bar receipt through press and hammer planning, die life, induction heater logs, weight and profile checks, magnetic particle testing and outside normalising to the dispatch bay. Each lot carries its steel heat, its die set and its test results. The die shop, the press crew, the inspectors and the dispatch desk all read one lot.

  • Your part numbers, die sets and steel grades go in as you name them
  • Bar in stock, lots still open and jobs out at vendors are brought over from your registers
  • GullySystem staff change check sheets and fields whenever you ask

GullySystem sets this up so a precision forging shop can follow steel from bar heat to the dispatch bay. A lot records the billets, the heating, the die set, the weight and profile checks and the crack tests, and returns from outside treatment are matched against what was sent.

Where it breaks today

What goes wrong before the software.

Heat numbers vanish at the saw

Each bar comes with a mill certificate and a heat number. Once it is cut into dozens of billets and tipped into a bin, the heat lives in someone’s head. A customer’s query then takes days to settle.

Die condition is tracked on a board

Impressions wear, crack and get re-sunk by the die shop, yet the count of forgings per die sits on a whiteboard. Nobody planning the press can see which blocker or finisher is close to its limit.

Heating data is not tied to the lot

Billet temperature at the press decides fill and grain flow, but readings go on a clipboard beside the furnace and never join the lot that used those billets. Nobody can look back.

Weight and flash are judged one piece at a time

A drifting forging weight can run for hours before anyone adds up the readings, and overweight wastes bar steel across a whole lot while underweight means a short fill. Flash hides both.

Outside treatment counts do not match

Lots leave for normalising, quenching, tempering or rough machining, and the returned count and the hardness report arrive separately, so a short return is noticed late. Chasing starts then.

Crack findings float free of their cause

A magnetic particle test turns up laps or cracks, yet linking the finding to the die, the heating run and the operator means searching three separate books by hand. The cause stays unnamed.

How it runs

How the work flows through it, step by step.

  1. 1

    Customer order and drawing

    An order is entered against a part number, its drawing revision, weight tolerance and finish allowance, and the delivery dates and schedule releases are held with it. One screen shows the whole job.

  2. 2

    Bar receipt and billet cutting

    Bars are booked by heat number, grade and diameter. Billets are sawn to the set weight, and the heat number is carried onto every billet lot, so a bin of cut pieces never loses its origin.

  3. 3

    Press planning and heating

    Planning places the lot on a press or hammer with a die set that has life left, and heating settings are logged as billets pass through the induction heater or furnace. The operator initials each run.

  4. 4

    Forging, trimming and checks

    Blocker, finisher and trim operations run under the lot, and weight, profile and flash are checked at set intervals before shot blasting follows. A bad reading stops the press.

  5. 5

    Testing and outside treatment

    Magnetic particle and hardness results are recorded against the lot. Lots going for normalising, tempering or rough machining leave with counts, and they return with a vendor report that is matched to what was sent.

  6. 6

    Packing and dispatch

    Forgings are packed in bins or crates with a label carrying part, lot and heat. Paperwork for the buyer is produced from that same lot, so the crate and the invoice cannot disagree.

Modules

What is inside.

Every module can be switched on, left out or changed to match how your team already works.

Orders and drawing revisions

Hold orders by part number and drawing revision with weight tolerance, finish allowance and schedule releases, so a revised drawing sits beside the old one and nothing is overwritten. Both stay visible.

Bar and billet register

Book bars by heat, grade, diameter and weight with the mill certificate on file. Record billet cuts and the weight each billet was sawn to, so every offcut and remainder stays on the bar record.

Press and hammer plan

Plan lots by tonnage, hammer or press, die availability and billet size, and a job cannot be released onto a die set that has passed its count. The planner sees conflicts before the changeover.

Die set register

Keep blocker, finisher and trim dies with forgings run, repair history and re-sinking dates. The die shop sees what is waiting for work, and the planner sees how many hits a set has left.

Furnace and heater log

Enter induction heater power, furnace temperature and soak time against the lot with operator and time, and heats outside the set window are flagged to the furnace hand at once. Nothing waits for the shift report.

Weight, profile and flash checks

Record forging weight, profile gauge results, flash thickness and surface findings on sheets laid out per part. A reading outside the drawing stops the lot, which then waits for the inspector.

Crack test and hardness records

File magnetic particle results, hardness readings and any outside laboratory report against the lot, with inspector and date. Failed lots stay on hold. They do not ship, whatever the delivery date says.

Outside treatment tracking

Track lots sent for normalising, quench and temper, shot blasting or rough machining, and compare the count out with the count back before a lot is released. A short return shows up the day it lands.

Scrap and rework log

Record rejections by cause, such as underfill, lap, crack, mismatch or oversize flash, against die set, press and shift. Repeated causes then become visible instead of drowning in a monthly scrap total.

Dispatch and invoicing

Pack forgings to the order, print labels showing part, lot and heat, and raise the invoice from what was packed. Customer returns are tied to the original lot, so a rejection traces back to its die.

Solutions inside

The business modules it is built from.

Each one is also available on its own, or inside a system built for you.

  • Order Management

    Orders are held by part and drawing revision, with finish allowance and release dates, so a revised drawing never overwrites the one a lot was made to.

  • Batch and Serial Tracking

    Bars are booked by heat, billets keep that heat, and every lot carries it forward to the dispatch label.

  • Production Planning

    Lots are placed on presses and hammers by tonnage, billet size and die availability, and a die past its count blocks release.

  • Fixed Asset Register

    Each die set is listed with its forgings run, repairs and re-sinking dates, so the die shop and planner see the same wear figure.

  • Quality Control

    Weight, gauge and flash readings are entered on sheets laid out per part, and a result outside the drawing holds the lot.

  • Job Work Management

    Lots sent for quench and temper or rough machining leave with a count, and the returned count and report are checked before release.

  • Goods Receipt (GRN)

    Bars are checked in at the gate against the purchase order and mill certificate, then issued to the saw by heat number.

  • Invoice Management

    The delivery note and tax invoice are raised from packed lots, with currency and tax rules set per buyer.

Services

How we would put it in.

Setup, data migration, integrations and anything built on top.

Who uses it

One system, each person sees their part.

For owners

See lots running, dies close to retirement, lots held for magnetic particle results, and the bar steel issued against the forging weight shipped. The gap between them is your scrap and flash.

For planners

Match lots to presses and dies, watch the turnaround at the normalising vendor, and keep delivery dates against customer schedule releases in view. Late returns show first.

For the die shop

Open the register to see which blocker and finisher sets are due for repair or re-sinking, then record the work done with its date. The count resets.

For quality staff

Enter checks, release or hold lots, and review scrap causes by die and shift. Attach outside hardness and laboratory reports as they return, so each lot file is complete when the buyer’s auditor visits.

For stores and dispatch

Bars come in and are sawn into billets for the press. Lots sent to the heat treater are followed out and back, and finished forgings are packed against the order last of all.

Reports

The numbers the owner asks for.

  • Bar stock and billets by heat number, with weight issued and remaining
  • Die sets by forgings run, repairs and re-sinking dates
  • Lots by press, hammer, die set and shift
  • Forging weight against drawing limit, by part number
  • Magnetic particle and hardness results by lot
  • Outside treatment counts out and back, by vendor
  • Scrap and rework by cause, die set and part
Good fit

Who this is built for.

  • Companies that hot-forge steel parts to near-net shape on hammers, screw presses and crank presses, where die wear decides the day
  • Shops that supply crankshafts, flanges, gear blanks and wheel hubs to machining customers who expect a heat number on every box
  • Forging units that heat billets by induction and need a heating record per lot
  • Plants that run an in-house die shop and need die counts, repairs and re-sinking in one register
  • Firms that send forgings out for normalising, tempering and rough machining
Honest answer

When it is not the right choice.

  • Plants that form parts from wire at room temperature will find Cold Forging Company Management Software closer, since billet heating and die re-sinking do not arise there.
  • A blacksmith or fabricator making single items to order may manage with job sheets and a quotation book.
Made to fit

Adapted to your business before it goes live.

You are not handed a login and left to it. The product is set up around your records, your people and the tools you already use.

Part and die masters

Part numbers, finish allowances, die sets and their impressions are entered under your own names before the first lot is opened. Nothing is renamed for the software.

Check sheets

Weight bands, profile gauges and how often each is tested come from your inspection plan, and the inspectors confirm every sheet before go-live. Limits are theirs, not ours.

Heating windows

Temperature or power ranges for each alloy steel are entered as the shop works them today, so an out-of-range heat is flagged to the furnace hand before the billet reaches the die.

Outside vendors

Normalising, shot blasting and machining vendors are set up with their usual routes and return times, and every returned count is matched against what left the gate. Short returns surface quickly.

Opening data

Your current bar stock by heat, die histories, open orders and part-finished lots are keyed or imported before the first lot is opened. Nobody starts from an empty screen.

Works alongside

  • Email
  • WhatsApp or other messaging
  • Barcode and label printers
  • Weighing scales
  • Accounting export
Common questions

Questions owners ask before a demo.

Can a finished forging be traced to its bar heat?

Yes. Billets keep the heat of the bar they were cut from. A lot opened from those billets carries it forward, so a label scan shows the heat, the die and the press.

How does the system know a die is near its limit?

Each die set has a forging count and a limit set by your die shop. Counts are added by lot, and a set that is close to its limit is shown to the planner before the changeover.

Does it connect to a pyrometer or induction heater?

No. Operators key in pyrometer and heater readings by hand. A machine feed can be scoped later with your maintenance team as separate work.

Can we follow an outside heat treatment vendor?

Yes. Each outside job records the lot, the count, the vendor and the due date. When the lot returns, the count and the vendor’s report are checked before release.

Does the software approve our forgings?

No. It records your inspectors’ readings and your vendors’ reports, and the limits you work to are entered from your own drawings and inspection plan.

What about forgings that go for machining outside?

They travel as an outside job with a count and a due date. The machined count and any scrap are entered on return, and the lot history stays whole.

Can two customers share one billet heat?

Yes. A heat can feed lots for different part numbers and buyers. Each lot records the billets it drew, and what remains stays on the bar record.

How do shift supervisors use it?

They open the lot on a shop-floor screen, enter weight and profile readings, and see the die count before a changeover. The screen needs a network link; if the line is down, readings go on a printed sheet and are keyed in afterwards.

What drives the quotation?

The quotation grows with presses, named users and outside routes, and a walkthrough using one of your own forging drawings comes first. The proposal follows in writing.

Can our lot and die records be exported?

Yes. Lots, heats, die history and test results leave in spreadsheet files, and the layout is agreed in the quotation before the first export is run.

Wondering what it would cost? Share your requirements and an engineer will come back with a scope.

Book a demo

See Precision Forging Company Management Software with your own data.

Tell us how you run things today. We’ll show you the parts that matter to you and say plainly what would need changing.

  • No obligation
  • A reply within one business day
  • Your details stay private

Start with your requirements

Seven short steps that tell us what you need. An engineer reads them before getting in touch.

Share your requirements