Delivery note and process statement for cloth

The delivery note and process statement send finished cloth back to its owner with the figures behind it. The note lists the rolls leaving. Metres in, metres out and shrinkage for the lot go on the statement. Dispatch prepares both, marketing issues the statement, and the process bill follows from them.

Two papers that travel with returning cloth

When cloth leaves a processing house, the customer receives two papers that matter. One says what is on the vehicle. The other says what happened to the cloth on the way. Both come from the lot record, never from memory.

Rolls and metres on the note

The delivery note lists the lot, the rolls released, and their metres and weight. Roll numbers match those booked at gate-in. Nothing is retyped. Checking the vehicle against the note, the customer finds the same figures the house holds.

Metres in, metres out, shrinkage

Metres received are set against metres returned, and the shrinkage between them is shown. Those figures come from the readings taken at each stage. The customer sees the change, not only the end point. Detail builds trust.

Steps performed on the lot

Steps the lot went through are named, such as bleaching, dyeing, stentering and compacting. The customer sees that the agreed route was followed. A step that was skipped would show. Gaps are plain to see.

Reference to the process bill

Lot and order references that the process bill will quote are carried across. Bill and statement then describe the same cloth. Reconciling the two, the customer meets no surprise. Both agree on the cloth and the metres.

Dispatch day, from last roll to open bill

Dispatch is the end of a long chain, and anything left unfinished earlier shows up here. A lot ends its journey at the dispatch bay, the customer desk and the billing screen, in that order. Every stop leaves a record. Each can be read later.

Inspection releases the final roll

The last roll of a lot passes inspection and is released. Dispatch sees the lot turn ready, with its roll count. Cloth still held for correction stays off the note. Nothing leaves half finished, and nothing leaves unnoticed.

Dispatch prepares the note

At the bay, dispatch selects the lot and the rolls going out on this vehicle. Metres and weight are listed beside each. Two loads are possible for one lot. Each load gets its own note.

Marketing issues the statement

Marketing opens the lot, reads the metres in and out with shrinkage by stage, and sends the statement by whatever channel the house has set up. The figures were already measured on the floor. Little is left to chase.

The customer queries a figure

One customer rings to say a lot looks short against what was sent. Marketing opens the statement and reads the gate-in figure, the stage figures and the returned figure. The query ends at the stage that explains it. Calls are brief.

Who prepares the paperwork, and who leans on it

Four people touch these documents, and each trusts a different part. Inspection trusts the release. Dispatch trusts the roll list. Marketing trusts the statement, and the owner trusts the figures before they leave the gate. All of it comes from one lot.

For inspection, releasing the rolls

Inspectors mark which rolls pass and which return for correction. Only released rolls become available to dispatch. A roll that failed never lands on a note by mistake, since the list does not offer it. Release is a deliberate act.

For dispatch, building the note

Dispatch chooses the rolls leaving and prepares the delivery note from released rolls. The note comes from the lot, not from a typed slip. A clerk at the gate checks the vehicle against it. The count must match.

For marketing, issuing the statement

Marketing issues the statement and answers any customer who asks about a figure, reading the same lot record that dispatch used when it built the note. Note and statement agree. Nobody has to explain a gap between them.

For the owner, checking before release

The owner reads lots about to leave, with their shrinkage against the quote. Any lot outside the quoted figure can be reviewed first, with the stage figures open beside it. That review is brief. A disputed bill costs far more time.

Choices about the note and the statement

Documents carry the house’s name to the customer, so their shape is worth settling early. Agree the points below with marketing, dispatch and the owner. GullySystem staff then set up the layouts. They reshape them on request later.

Layout of the delivery note

Decide which fields the note shows, such as the customer’s order reference, lot, roll numbers, metres and weight. A cluttered note is ignored at the gate. Show only what the customer checks. Leave the rest on screen.

How much the statement shows

A statement can show the figures for every stage or only the totals. Decide what each customer should see. One who disputes length wants the stages. Another wants only the final metres. Ask marketing which is which.

Partial deliveries of one lot

Cloth sometimes leaves in two loads because rolls finish on different days. Decide whether one statement covers the lot or one covers each load. Choose before the first partial leaves the gate. Late changes confuse customers.

Corrections after a statement goes out

If a figure is wrong after the statement went out, someone must reissue it. Decide who may do that and how the correction is marked, for example with a reissue date. A reissue with no mark confuses the customer.

The statement and the features beside it

Statement and note are outputs. Almost everything they say was recorded earlier, at booking, at each measured stage and at inspection. What they add is order and presentation. Little is new. Readers get one clear account of the lot. The bill follows the same account.

  • Grey receipt and lot booking gives metres in and rolls
  • Metres in and out by stage supplies shrinkage by step
  • Process route by lot lists the steps performed
  • Inspection, rework and re-dye releases rolls and notes corrections
  • Process rates and billing raises the bill from metres returned

Limits of these two documents

These two papers report what was recorded. They do not prove the figures to a customer who disputes them, and they are not a tax document. Tax invoices, their format and their filing belong to the accountant and the rules that apply to your business. A house sending two or three lots a week can type its notes by hand. That is fine.

FAQ

Frequently asked questions

Can one note cover several lots?

A vehicle may carry rolls from more than one lot. Each lot appears with its rolls. The statements stay separate, one per lot. That lets the customer match each statement to the order it belongs to.

What if a roll is held back for rework?

The roll stays off the note, and the lot shows as part-delivered. When the roll returns, a later note carries it. Nothing leaves unexplained. Figures for each load appear on the statement, so partial loads are clear.

Can the customer receive the statement electronically?

Email is a listed integration, and messaging can carry lot status. Where the house has set these up, the statement can be sent that way. Otherwise it is printed and travels with the cloth. The choice is the house’s.

Is the statement a tax document?

It is an account of metres and shrinkage that supports the process bill. The tax invoice and its format are matters for the accountant and the rules that apply to your business. It stays separate from them.

Can we change the layout later?

Statement layouts are changed by GullySystem staff on request. Tell them what to add or remove. The edit is made for you. Statements already issued keep the shape they had when they went out, which keeps old records honest.

Where it fits

How this feature fits the system.

Textile Processor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Grey receipt and lot booking

Grey cloth is measured and weighed on arrival against the customer’s delivery note, and damage found at the gate is recorded before it is booked.

Goods Receipt (GRN)

Lab dip and recipe library

An approved shade carries its dyes, auxiliaries and conditions as a recipe, and the same formula is released for each repeat lot.

Bill of Materials

Machine batches by lot

The planner groups lots into jet and range batches by shade and weight and sees which machine is free after the current run.

Production Planning
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements