Skip to main content
GullySystem

Dyes, chemicals and utilities per batch

This feature counts what leaves the store for each machine batch and books steam, water and power readings against the lot. Dye master, store and supervisors all use it. The owner then reads dye and chemical use per kilogram of cloth and sees which shades are costly.

Issues and readings behind each batch

A dyeing batch consumes more than dye. Auxiliaries leave the store, steam is drawn, water runs and machines draw power. The record puts a figure on each, tied to a batch and a lot, so cost can be read without guesswork.

Dyes issued to the batch

Every dye issued to a batch is recorded by name and quantity against the lot it dyed. The figure can be compared with the recipe that released it. A gap between recipe and issue is visible.

Auxiliaries and chemicals issued

Salt, alkali, acid, bleaching agents, softeners and other chemicals are issued against the batch in the same way. Each item keeps its own count. A chemical that leaves without a batch is noticed at the store.

Steam, water and power readings

Readings of steam, water and power for a run are booked against the lot, where the house has meters to read. The cost of finishing a lot then covers more than materials. Utilities join the lot.

Stock left in the store

Each issue lowers the stock of that dye or chemical. Stock left is visible, and so is each item that sits under their reorder level before a run is blocked. Shortages are planned for. They do not ambush the floor.

Store, bench and meter through one shift

The dye store opens before the first batch is loaded and closes after the last is unloaded. In between, quantities are weighed, carried, added and read from meters. Each of those moments leaves a figure behind. Few are written down.

The store issues for Jet 4

Before the navy batch for lot 512 is loaded, the store weighs out the dyes and chemicals the recipe lists. The issue is booked against the batch. The jet supervisor collects what the slip says.

A supervisor adds a correction

Midway through a run the shade reads low, and the supervisor adds a little more dye. The extra quantity is booked to the same batch, with the time it went in. The correction is on record.

Meters are read at shift end

At the end of a shift someone reads the steam, water and power meters for the machines that ran. The figures are booked against the lots they served. A dated reading beats a monthly estimate.

Storekeeper sees a low balance

While issuing a chemical, the storekeeper sees that the balance has fallen under its reorder level. The item is flagged before the next batch needs it, so a run is not held up. Purchasing becomes a short conversation.

What each role reads about materials

Materials are watched from the store, the bench and the owner’s office, and each watcher needs a different cut. Balances matter to the store. Recipe against issue matters to the laboratory. Cost for each kilogram of cloth matters to the owner.

For the laboratory, recipe against issue

The laboratory compares what a recipe lists with what was issued for the batch. A difference may be a correction, or it may be waste. The dye master reads the entry. The call is made there.

For supervisors, drawing and returning

A machine supervisor draws the issue for a batch and records any extra added during the run, such as a second portion of dye. Leftovers are noted. The slip is tied to the batch, not to memory.

For the owner, use per kilogram

Dye and chemical use per kilogram of cloth shows which shades and which customers consume more than the rest. A costly shade can be priced for it. Hidden rework cost shows up too, in kilograms.

For marketing, pricing a new shade

Marketing looks at what comparable shades have consumed before quoting a new one. A deep navy with a long hold costs more than a pale cream. History gives the quote a basis. Guessing gives way.

Store rules to set before issuing starts

A materials record is only as good as the habits at the store counter. Agree these points with the storekeeper, the dye master and the owner before the first batch. Every later figure on cost rests on them.

Units for dyes and chemicals

Dyes may be issued in grams and chemicals in kilograms or litres. Decide the unit for each item once, so a recipe and an issue speak the same language. A mismatched unit corrupts the figure.

Issue against batch or against lot

A batch holds several lots, so a dye issue has to be shared among them. Decide whether cost is split by weight of cloth or booked to the batch alone. The split affects each customer’s bill.

Which utilities are metered

Not every house has separate meters for steam, water and power at each machine. Decide which readings exist and who takes them. A reading nobody takes is a blank column. Start with the meters you trust.

Opening stock at go-live

On the first live day the store holds a physical stock of dyes and chemicals. Decide who counts it and when, so balances start true. A wrong opening balance spoils every reorder alert. Count carefully.

Materials and the features around them

Materials sit between the recipe and the bill. The recipe says what a batch needs, the batch says where it was used, and the rates decide what the customer pays. Rework adds its own issues. Each link keeps the cost of a lot in one place.

  • Lab dip and recipe library lists the quantities to issue
  • Machine batches by lot receives the issue for each run
  • Inspection, rework and re-dye books extra chemicals for corrections
  • Process rates and billing receives the cost of corrections
  • Metres in and out by stage sets use against cloth weight

Where materials records end

This record counts issues and readings. It does not buy dye, pay a supplier or settle a utility bill, which stay with the owner and the accountant. Dosing system data can be brought in where the house sets it up, but the system does not dispense anything. A house with a few steady recipes can keep a store register.

FAQ

Frequently asked questions

Does it take data from our dosing system?

Dosing and dispensing system data is a listed integration, and it adds scope. Where the house connects it, dispensed quantities can come into the batch record. Where it does not, issues are keyed by the storekeeper. Scope appears in the proposal.

Can we track stock of each dye?

Each dye and chemical has its own balance, reduced by every issue to a batch. Items under their reorder level are flagged. Supplier orders are placed outside the system. Balances stay current and visible to the whole store.

How are utility readings booked to a lot?

Readings for a run or a shift are entered and shared among the lots that ran in that period. How the share is worked out is agreed at set-up. It follows the rule the house chooses.

Can it show cost per kilogram of cloth?

Dye and chemical use per kilogram of cloth is a standard view. Utilities readings add to it where the house books them. The view shows use, and the house prices it. No money figure is promised.

What if a chemical is returned to the store?

A return is booked against the batch it came from, which raises the stock again and lowers the batch’s use. The entry notes the reason. Without it, a batch would look more costly than it was.

Where it fits

How this feature fits the system.

Textile Processor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Grey receipt and lot booking

Grey cloth is measured and weighed on arrival against the customer’s delivery note, and damage found at the gate is recorded before it is booked.

Goods Receipt (GRN)

Lab dip and recipe library

An approved shade carries its dyes, auxiliaries and conditions as a recipe, and the same formula is released for each repeat lot.

Bill of Materials

Machine batches by lot

The planner groups lots into jet and range batches by shade and weight and sees which machine is free after the current run.

Production Planning
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements