Skip to main content
GullySystem

Metres in and out by processing stage

Metres in and out by stage measures length and weight as cloth passes through each stage. Shrinkage and loss are then shown per lot and per process. Supervisors take the figures, marketing quotes them to customers, and the owner reads where cloth is being lost. The process statement draws on the same figures.

Length and weight, stage after stage

Cloth is measured at gate-in and again after the stages the house chooses. Each reading is a pair, length and weight, tied to a lot and a step. Together they let anyone say where a metre went. That is the question customers ask.

Length in and length out

Every measured stage keeps the metres entering and the metres leaving. The difference is the change at that stage. A lot can lose length at singeing, gain width at the stenter and still sit inside the quote. Each stage is shown alone.

Weight at each measured stage

Weight is recorded beside length, since a process such as desizing removes weight without changing metres. Length and weight together describe the cloth. A lone figure invites a wrong conclusion, so the pair is always kept.

Shrinkage per stage and lot

Shrinkage is shown for each lot and for each stage it passed through. A shrink of a few metres across a whole lot means little. Set it against the stage that caused it, and it means more. Stages explain the loss.

Loss with its stage named

A lost metre is not a single figure. Each is a loss at a named stage, on a named lot, between two readings. Cut ends and rolled-up ends are noted where found. Waste has an address.

Measuring points across one lot’s journey

Different people measure a lot at different points, and each of them reads the figure in a different mood. Gate staff are hopeful, the stenter operator is pressed, and the customer is suspicious. The record has to serve all three. It does.

Gate staff take the first reading

Grey arrives, and its first length and weight are keyed against the lot. That reading becomes the baseline for every later comparison. A slip here carries on. The gate measure is therefore taken with care.

A rolled-up end at the stenter

At the stenter a roll finishes with a rolled-up end, which the operator cuts away. The cut length is booked as loss at that stage, with a note. The loss is explained at once. Nothing waits for dispatch.

The owner compares with the quote

The report of metres in and out with shrinkage by lot sits beside the shrinkage that was quoted to the customer. Any lot outside the quoted figure is flagged for a call. The call happens before the delivery goes out.

A customer disputes the length

A customer claims the delivery is short. Marketing opens the lot and reads out the length at gate-in and after each stage. The loss is placed at a stage. The conversation then turns to what happened there.

Who reads shrinkage, and how

The same numbers answer different questions in different hands. The owner reads trends, supervisors read one run, marketing reads one customer’s lot, and dispatch reads the last figure before the gate. Nobody compiles anything by hand.

For the owner, shrinkage against quote

Per lot and per process, the measured figures show shrinkage against the quoted figure. A process that keeps losing more than quoted becomes visible. A pricing decision can then rest on facts. It need not rest on feeling.

For supervisors, measuring after a run

A machine supervisor records length and weight when a run ends, for the lots in it. Two figures per lot are entered. No long form is needed. A re-measure after a doubtful run is simply a new reading.

For marketing, defending a figure

Marketing quotes metres in and metres out to a customer, and shows the loss by stage when asked. The figures come from measurements taken at the time. No one reconstructs them from memory. The call is answered.

For dispatch, the last reading

Inspection and dispatch take the final length and weight before release and set them against the earlier stages recorded for that lot. A figure that does not fit is queried first. It is not sent out unexplained.

Measurement choices to settle early

A system that records every stage can drown a shed in readings. Choose with the dye master and the supervisors which stages matter. Readings that nobody wants are soon keyed carelessly, or skipped. Then they mislead.

Stages where cloth is measured

Gate-in and dispatch are the obvious points. Singeing, bleaching, dyeing and stentering may each be measured as well. Decide which stages are worth the effort, starting where loss has been disputed before. Fewer readings, taken well, serve better.

Unit of length and weight

Customers may think in metres, yards or kilograms. Decide the unit the house records in, and the unit the statement quotes. Conversion between the two is a risk. Agree it once, in writing, before go-live.

Quoted shrinkage for each customer

Some customers are quoted a shrinkage figure and others are not. Decide where the quoted figure is stored and who may change it, so the comparison with measured shrinkage means something. A quote is a promise made by marketing.

Cut ends and sample pieces

A piece cut for a lab dip or a strike-off leaves the lot short. Decide whether such cuts are recorded as sample lengths, apart from true loss. Without that rule, honest sampling looks like wastage.

Measurement beside the other features

Readings are only useful when they land on the right lot and the right step. This feature reads its stages from the route and takes its first figure from booking. Its totals pass to the statement and the bill. Inspection and rework use the same readings to explain a loss. One set of figures serves them all.

  • Grey receipt and lot booking supplies the gate-in figures
  • Process route by lot decides which stages are measured
  • Machine batches by lot gives the run that was measured
  • Delivery note and process statement quotes metres in and out
  • Process rates and billing charges on metres processed

Where measurement cannot help

The record holds readings that people take. It does not measure cloth by itself. It cannot say why a metre was lost, only where. Whether a loss is acceptable is a commercial question for the owner and the customer. A house with one stage and one customer can simply note lengths in a book kept at the gate.

FAQ

Frequently asked questions

Is shrinkage calculated or measured?

Measured lengths are entered, and the change between readings is worked out for each stage and lot. The figure shown is the difference between two measurements taken by staff on the floor. It is not an estimate. Nobody guesses.

Can weight be recorded as well as length?

Weight is kept beside length at the stages the house chooses. A process that removes size or impurities changes weight without changing metres. Both readings are stored. The cause of a change is then easier to read.

What if the customer measures in yards?

The unit is a set-up decision. The house records in one unit, and the statement can quote in the customer’s. Conversion is agreed at set-up with GullySystem staff. A figure on the statement never surprises the customer.

Does it show loss per process, not just per lot?

Loss is shown for each process as well as for each lot. A stage that loses more than the others across several lots stands out. The owner can ask the right supervisor the right question. That is useful.

Who enters the measurements on the floor?

Staff at each measured stage enter them, such as the supervisor or an operator named by the house. Machine controller exports can supply some figures where the house has connected them. Hand entry covers the rest.

Where it fits

How this feature fits the system.

Textile Processor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Grey receipt and lot booking

Grey cloth is measured and weighed on arrival against the customer’s delivery note, and damage found at the gate is recorded before it is booked.

Goods Receipt (GRN)

Lab dip and recipe library

An approved shade carries its dyes, auxiliaries and conditions as a recipe, and the same formula is released for each repeat lot.

Bill of Materials

Machine batches by lot

The planner groups lots into jet and range batches by shade and weight and sees which machine is free after the current run.

Production Planning
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements