Metres in and out by processing stage
Metres in and out by stage measures length and weight as cloth passes through each stage. Shrinkage and loss are then shown per lot and per process. Supervisors take the figures, marketing quotes them to customers, and the owner reads where cloth is being lost. The process statement draws on the same figures.
Length and weight, stage after stage
Cloth is measured at gate-in and again after the stages the house chooses. Each reading is a pair, length and weight, tied to a lot and a step. Together they let anyone say where a metre went. That is the question customers ask.
Measuring points across one lot’s journey
Different people measure a lot at different points, and each of them reads the figure in a different mood. Gate staff are hopeful, the stenter operator is pressed, and the customer is suspicious. The record has to serve all three. It does.
Who reads shrinkage, and how
The same numbers answer different questions in different hands. The owner reads trends, supervisors read one run, marketing reads one customer’s lot, and dispatch reads the last figure before the gate. Nobody compiles anything by hand.
Measurement choices to settle early
A system that records every stage can drown a shed in readings. Choose with the dye master and the supervisors which stages matter. Readings that nobody wants are soon keyed carelessly, or skipped. Then they mislead.
Measurement beside the other features
Readings are only useful when they land on the right lot and the right step. This feature reads its stages from the route and takes its first figure from booking. Its totals pass to the statement and the bill. Inspection and rework use the same readings to explain a loss. One set of figures serves them all.
- Grey receipt and lot booking supplies the gate-in figures
- Process route by lot decides which stages are measured
- Machine batches by lot gives the run that was measured
- Delivery note and process statement quotes metres in and out
- Process rates and billing charges on metres processed
Where measurement cannot help
The record holds readings that people take. It does not measure cloth by itself. It cannot say why a metre was lost, only where. Whether a loss is acceptable is a commercial question for the owner and the customer. A house with one stage and one customer can simply note lengths in a book kept at the gate.
Frequently asked questions
Is shrinkage calculated or measured?
Measured lengths are entered, and the change between readings is worked out for each stage and lot. The figure shown is the difference between two measurements taken by staff on the floor. It is not an estimate. Nobody guesses.
Can weight be recorded as well as length?
Weight is kept beside length at the stages the house chooses. A process that removes size or impurities changes weight without changing metres. Both readings are stored. The cause of a change is then easier to read.
What if the customer measures in yards?
The unit is a set-up decision. The house records in one unit, and the statement can quote in the customer’s. Conversion is agreed at set-up with GullySystem staff. A figure on the statement never surprises the customer.
Does it show loss per process, not just per lot?
Loss is shown for each process as well as for each lot. A stage that loses more than the others across several lots stands out. The owner can ask the right supervisor the right question. That is useful.
Who enters the measurements on the floor?
Staff at each measured stage enter them, such as the supervisor or an operator named by the house. Machine controller exports can supply some figures where the house has connected them. Hand entry covers the rest.
How this feature fits the system.
Textile Processor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Grey receipt and lot booking
Grey cloth is measured and weighed on arrival against the customer’s delivery note, and damage found at the gate is recorded before it is booked.
Goods Receipt (GRN)Lab dip and recipe library
An approved shade carries its dyes, auxiliaries and conditions as a recipe, and the same formula is released for each repeat lot.
Bill of MaterialsMachine batches by lot
The planner groups lots into jet and range batches by shade and weight and sees which machine is free after the current run.
Production PlanningTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements