Installation Jobs for Softener and RO Plants

An accepted quotation becomes an installation job that holds the pipework, the crew, the pressure tests and the sign-off. The installer records the model and serial number of the softener, membranes and pumps as they go in. The office then knows what was fitted and who handed it over.

Job card contents for a plant going in

A water treatment installation is part plumbing and part commissioning, and the job card has to hold both. It lists the work to be done, the people doing it and the checks that close it. Handover needs a record, kept somewhere.

Pipework scope and crew

Pipe runs from sump to plant, the valve connections to be made and the crew who will do them are all listed. The scope comes from the accepted quotation. Nothing is invented on site, and nothing is forgotten.

Pressure test readings

Gauge readings from the pressure test are entered against the job, with the date and the name of whoever took them. A line that fails is noted and retested. The final pass stays on the record.

Model and serial numbers fitted

Each softener, membrane set, pump and vessel has its model and serial number noted as it goes in. They later fill the plant register. Copy them at the plant room itself, never from memory afterwards.

First permeate flow and sign-off

At handover the crew records the first permeate flow and the customer signs. That is all. Closing waits until the serial numbers and that first reading are both entered. An unsigned plant stays open on the list until someone returns.

Crew day on a hotel RO installation

A hotel needs an RO plant and a softener fitted before a new wing opens. The crew arrives at the plant room with a job card and leaves with a signed one. Between the two, pipework goes in, pressure is tested and serial numbers are copied. The card travels with them.

Crew leaves the depot with the card

The supervisor opens the job in the morning and sees the scope, the crew and the plant room address. Valves and vessels listed on the quotation are loaded to match. Nobody phones to ask what was sold.

Pipework before the vessels

Pipe runs from the sump to the plant room are fitted first, and each stage is ticked on the job. A pause for a missing fitting is noted. Anyone can see exactly where the work stands.

Pressure test at the end of the run

With vessels and valves in place, the installer pressurises the line and enters the gauge readings. A leak is noted and fixed. Only a passed test lets the job move on to commissioning and handover.

Handover with the hotel’s engineer

The installer starts the plant, records the first permeate flow and walks the hotel’s engineer through the controls and alarms. The customer signs. Closing follows, and the plant is ready to be entered on the register.

Job card views for crew, office and owner

An installation job reads very differently to the person on the roof and the person in the office. The crew needs the steps, accounts need the stage reached and the owner needs to see what is running late. Each wants a different line.

For the owner watching open installations

The owner sees jobs under way, jobs waiting for a pressure test and jobs awaiting sign-off. Anything stuck at one step stands out. Money tied up in unfinished plants is easy to see, plant by plant.

For sales and surveyors handing over

Sales staff and surveyors see the job built from their quotation and check that the plant fitted is the plant sold. If the customer rings with a query, they open the job and answer. No hunting needed.

For service technicians fitting and checking

Technicians on the crew tick steps, enter gauge readings and note serial numbers, so the card is their checklist. Later, a service technician opens it to see how the plant was first fitted. History is kept.

For accounts raising stage bills

Accounts see how far each job has gone. A stage bill for pipework or commissioning is raised when the matching step is done. Final bills wait for sign-off. That order is plain on the card.

Choices that shape how a plant job is closed

Closing an installation is a judgement as much as a click. Before crews use the system, the firm decides what proof is needed, who signs and what happens to jobs that stall. Settle these with the supervisors.

Who signs a pressure test as passed

Decide whether the installer who took the readings may mark the test passed, or whether a supervisor must. A second signature slows a job a little but protects the firm. Choose the rule by plant size.

Which serial numbers must exist before closing

Softener, membranes, pumps and the ultraviolet lamp each carry numbers. Decide which must be entered before closing. A missing membrane number leaves a gap in the register. Only a return visit fills it, and that costs a trip.

How a stalled job is marked

Civil work, power or the customer may hold a plant back. Decide what status such a pause gets and who can set it. Otherwise open jobs look late. They are only blocked, and the board should say so.

Whether half-fitted plants are entered as jobs

Plants half fitted on the day you start can be entered as jobs or finished the old way. Choose a cut-off. Completed installations from earlier come through the plant and asset register, not as jobs.

Installation jobs and the neighbouring features

An installation job starts with a quotation and ends in a register entry and a contract. Along the way it borrows the equipment list, the survey notes and the water analysis, and it hands serial numbers and dates onward. It is the bridge between selling and servicing. Every plant crosses it once.

  • Opens from the accepted plant quotation, equipment lines intact
  • Draws on survey notes for pipe runs and floor space
  • Hands model and serial numbers to the plant register
  • Starts the service contract once the plant is signed off
  • Takes cartridges and chemicals fitted at commissioning from stock

Boundaries of the installation job record

This card records steps, readings and signatures. It does not design the plant, direct a civil or electrical contractor who is not on your payroll or decide whether a pressure reading is acceptable. Those judgements belong to the supervisor. A firm that fits one small purifier at a time may not need a job card at all.

FAQ

Frequently asked questions

Can one job cover a softener and an RO plant?

Every piece of equipment from the accepted quotation is listed, so a softener and an RO skid can sit on one card. Each piece has its own serial numbers. Steps are ticked for the whole job. The customer signs once.

What happens when the crew changes mid-job?

Crew members are named on the job, and the office can change them. Steps already ticked stay ticked. A replacement picks up where the pipework stopped. The card shows exactly what remains to be done.

Does the job keep the pressure test result?

Gauge readings from the test are typed into the job with the date, beside the serial numbers of the vessels tested. A retest after a leak is entered as a fresh reading. The first one remains.

When does the plant reach the asset register?

Once the job closes, the plant’s model, serial numbers and installation date are ready for the register. Warranty and the covering contract are added alongside. Staff do not retype the details. A closed job is the source.

Can accounts bill before the job is signed off?

Stage bills follow the quotation, so a pipework stage can be raised when that step is ticked. The final stage waits for sign-off if you set it so. That rule is yours. Agree it early.

Where it fits

How this feature fits the system.

Water Treatment Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Plant quotations

Softeners and RO skids are sized from the analysis and priced from your own list, with each revision kept beside the one the customer first saw.

Quote & Proposal Management

Installation jobs

An accepted quote becomes a job card with pipework, crew and pressure tests, and closes only after serial numbers and the first permeate readings are recorded.

Job Cards

Service contracts and visits

Each contract holds its scope, visit count and renewal date, so the office knows what is owed to the customer and when.

AMC and Service Contracts
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements