Skip to main content
GullySystem

Plant and Asset Register for Treatment Companies

Every softener, RO skid and ultraviolet unit sits on the register with its pump, vessels, membranes, installation date, warranty and the contract that covers it. A technician opens the site before leaving the depot and knows what is inside the plant room. Plants are counted by model for the owner.

Parts, dates and cover held for each plant

A register earns its keep when a technician stands at a skid and the entry matches what is bolted to the floor. Working parts, dates and the paper that covers it are listed for each plant. Gaps show up as blanks.

Pump, vessels and membranes

The entry names the pump rating, the vessel sizes and the membrane set inside the skid. Technicians read them before leaving the depot. Replacement parts are then picked from the right shelf, not the nearest one.

Ultraviolet lamp and dosing parts

Plants with an ultraviolet unit or a dosing pump record the lamp and the pump as parts of their own. A lamp change is entered against the plant. Judge the next change from that date.

Installation date and warranty

The commissioning date and the warranty on each part sit on the plant record. A failing pump is checked against them first. Plants still covered are easy to pick out. Others are not, and the list shows it.

The contract that covers it

Its entry points to the service contract that covers it, or shows that none does. Plants without cover are easy to spot. Renewal then becomes a call to make, not a surprise at the gate.

A technician’s morning with the register open

At the depot a technician holds a list of visits and the register open on each plant. What is inside the skid is already known. What changed since the last visit is written down on return. Nothing is guessed at the gate.

Checking the skid before loading the van

The technician reads the plant’s membrane model and cartridge size, then loads the matching spares. A visit to a canteen plant needs different parts from a laundry softener. That is settled before the van leaves.

Finding a pump that was replaced

At a housing complex the pump is not the one listed. The technician enters the new model and serial number against the plant. Visits after that start from the corrected entry. Old data does not linger.

A warranty question on the phone

A hotel asks whether a failed membrane is still under warranty. The office opens the plant, reads the installation date and the covering contract, and answers on the call. No file is pulled from a cabinet.

Counting plants before renewals

Before renewal calls begin, the service manager lists plants by model and site, with the contract each sits on. Plants with no contract are listed apart. The calls start from that list, one customer at a time.

Plant entries as each role reads them

A plant entry answers a different question for each person. Where it is, what it holds and who covers it matter to different desks.

For the owner counting installed plants

The owner sees plants by model, vessel size and site, and which are covered by a contract. A model that gives repeated trouble shows itself in the list. Buying and quoting decisions rest on it.

For sales and surveyors looking for upgrades

Sales staff and surveyors open a site to see what is installed and how old it is. An older softener beside a newer RO skid suggests a visit. Facts come from the entry. The conversation is theirs.

For service technicians at the plant

Technicians read the plant’s parts, the last cartridges fitted and the contract cover. They update whatever they replace. Whoever visits afterwards finds the entry current, not a note left in a van or a head.

For accounts checking cover before billing

Accounts see whether a plant is under warranty or a contract before a repair bill is raised. A covered part is not charged by mistake. The decision stays visible on the entry for anyone who asks.

Settling plant entries before the first import

Settle them early. The firm decides what each entry must hold, who edits it and how the existing plant list arrives. Those choices are quicker to settle before anyone starts typing.

Which parts count as part of a plant

Decide whether a booster pump or a dosing pump belongs to the plant or stands as a separate asset. A skid with six listed parts reads differently from one with two. Pick the rule your technicians already use.

Who may amend a serial number

A wrongly copied serial number is an easy slip to make. Decide who can correct one and whether the old number is kept in a note. Warranty questions depend on this entry being right. Care pays.

How the existing plant list is brought in

Your spreadsheets supply the customer list, each plant’s model and serial number and the contract end dates. Decide the order of import and who reviews it. A review is needed. The service manager checks the list site by site.

What happens to a plant that is removed

Sometimes a plant is replaced or taken out. Decide whether the entry is archived with a reason or deleted. Keeping it explains why that site’s earlier readings stop on a given date, and where the plant went.

The register as the middle of the product

This feature sits in the middle. Installation jobs fill it, contracts attach to it and every service visit reads and updates it. Readings and stock charges also point back at the plant, so the entry gathers the history of the machine. Little is typed twice.

  • Filled from installation jobs at sign-off, serial numbers intact
  • Linked to the service contract that covers each plant
  • Opened by technicians when visits come due
  • Receives readings and parts replaced from service reports
  • Shows cartridges and membranes charged from stock to the plant

Cases the register cannot settle alone

This record shows what is installed and what covers it. It does not inspect a plant, promise that a warranty claim will be accepted or hold the maker’s own terms. Those stay with the supplier and the owner. A firm with a handful of plants may keep them in a simple list until its service routine grows.

FAQ

Frequently asked questions

What is stored for each plant on the register?

Pump, vessels, membranes, ultraviolet lamp, installation date, warranty and the covering contract are held. Technician updates add parts replaced. The entry grows as visits are made. It stays attached to the site for as long as the plant is installed.

Can several plants sit on one site?

A site can hold more than one plant, such as a softener ahead of an RO skid. Each has its own entry, parts and cover. Opening the site shows both. Contracts may cover one or both.

Can I list every plant running one membrane model?

Plants can be listed by model, vessel size and site, so everything running one membrane type is in front of you. A supplier notice or a price change is then easy to act on. The list comes from the entries.

What does a technician update after a visit?

Parts replaced, such as a pump or a lamp, are entered against the plant with the date. The readings and the cartridges fitted come from the service report. That keeps the entry current for the next visit. No separate form is needed.

Does the register show warranty cover for each plant?

Each plant shows its installation date and the warranty held on its parts, so staff see what is covered. Messages to customers depend on your messaging set-up. Dates come from the register. The rest is yours to judge.

Where it fits

How this feature fits the system.

Water Treatment Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Plant quotations

Softeners and RO skids are sized from the analysis and priced from your own list, with each revision kept beside the one the customer first saw.

Quote & Proposal Management

Installation jobs

An accepted quote becomes a job card with pipework, crew and pressure tests, and closes only after serial numbers and the first permeate readings are recorded.

Job Cards

Service contracts and visits

Each contract holds its scope, visit count and renewal date, so the office knows what is owed to the customer and when.

AMC and Service Contracts
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements