How to Automate a Plumbing Contracting Business

Ganesh HSStrategy and Technology, GullySystem
Practical advice · 5 min read

In this guide 7 sections
The short answer

Start by putting every enquiry, quotation, service call and site job in one list, each tied to a client and a site address. Material issued, plumber wages and bills attach to that same job, so costs and billing are read side by side without opening a second book. The three books become one.

Start with one list of enquiries and site visits

Work arrives by phone and walk-in. Each channel leaves its own scrap of paper or chat thread, and by the weekend nobody can say which quotation was promised to whom.

Log every enquiry with its source, the client’s name, the site address and the kind of work asked for, from a bathroom refit to a building water line. The site visit is booked there.

Visit photographs stay on the record. The supervisor reads the measurements again when the quotation is built, and the office reads them when a client questions the work months later. Larger sites also record the storey, wing and riser, since a fourth-floor leak is a different visit from a leak in the basement.

Price from your own rate list

Enter the firm’s rates for pipes, fittings, sanitaryware and labour once, with sizes and types, and let every quotation pick its lines from that list. Nobody retypes a price. Sizes matter, because half-inch and three-quarter-inch GI pipe, CPVC fittings and PVC drain pipe are priced and stocked as separate lines in the rate list.

Every revision is kept. The earlier figure is not overwritten when a client negotiates, and the owner can see which quotations are still open, which were won and which were lost.

An accepted quotation becomes a job. Its stages, such as first fix, second fix and testing, are set to match the contract, so billing later follows the same milestones the builder signed.

Separate service calls from site jobs

A service call is a short job. A tap leaks or a drain blocks, and one ticket follows the complaint from the first phone call to the repair bill and the receipt.

A site job covers a building or a block of flats, runs in stages over weeks, and needs a different screen from a ticket.

The office assigns the plumber. The plumber sees the day’s calls and site jobs on a phone, marks each one done, and the office stops phoning around to find out where everyone is.

  • Ticket with client, address and complaint
  • Plumber assigned and visit recorded
  • Material used on the visit
  • Repair bill raised from the ticket

Tie material, wages and bills to the job

Pipes, fittings and sanitaryware are received from dealers, issued to a job and returned when unused, with reorder levels set for the sizes that go out most often. Gate valves, bib cocks, flush tanks and water meters are items that walk out of a store unrecorded unless each issue is booked to a job.

Plumbers and helpers are marked present and assigned to jobs, and daily wages, piece-rate pay and advances then follow the rules the firm already uses. Attendance becomes the wage sheet.

Work done is measured against each stage and turned into a running bill or a final bill, and receipts by cash, bank transfer or cheque are posted against it. Retention, advances from the builder and the next running bill appear on one screen, so the owner knows what to chase before the month closes. Dues show with the oldest bill first.

When a notebook is enough, and what to decide first

One plumber taking a few calls a week gets by on a phone and a notebook, but several plumbers, several sites and several unpaid bills running together outgrow it. Signs of outgrowing the notebook: a quotation promised twice, a fitting issued with no name against it and a builder disputing a bill that nobody can back with measurements.

Decide three things before moving. First, the stages and billing terms your builders use; second, how wages are paid; third, which open jobs and unpaid bills must come across from the register.

A firm that also does electrical work or waterproofing should ask whether those trades need their own job stages, since plumbing stages will not fit them. Separate trades deserve separate stages.

Put the advice to work.

Use a test copy or fictional example to turn the discussion into something your team can check.

Price from your own rate list

Which assumptions stop being valid when the quotation changes?

For “Price from your own rate list”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

One-job record sheet

Take one live job. Make columns for quotation figure, stages done, material issued, plumber days and bills raised, then fill them for a job running today and note which records sit apart.

Open a blank worksheet to print

Questions owners ask

What should we move into the system first?

Move the rate list, the client list and the open jobs with their unpaid bills first, then enquiries and service calls after that. The office checks every loaded balance against the bill file before go-live, and plumbers join the phone view only after the numbers agree.

Does it suit a firm that only handles repair calls?

A repair-only firm can use tickets, plumber assignment, repair bills and receipts on their own, and the site job screens stay untouched until the firm wins a building contract. The ticket stands alone.

How are plumber wages handled?

The firm’s existing wage rules, whether daily wage, piece rate or advances, are entered once, and attendance marked each day then produces the wage sheet. Pay practice does not change.

Browse all guidesBack to top ↑
Next step

Have a specific situation to work through?

This article covers the general case. Tell us what you’re actually dealing with and we’ll respond directly.

See the Plumbing Contractor Management Software product