Skip to main content
GullySystem

Pitch calendar and availability for campgrounds

The pitch calendar lists every pitch, cabin, yurt and bay by date, with its hookup type, length limit and features beside it. A booking is offered only the sites that fit the rig and the party. The warden, the office and the grounds crew all read the same grid.

What the pitch calendar records for each site

Each pitch, cabin, yurt and bay is entered once, with the facts a booker needs before a rig is sent to it. Those facts are then laid against dates. A short field, a slope or a missing pedestal is written down, not remembered.

Supply type and hardstanding

Each site carries its hookup type, such as full hookup, electric only or none, and whether it is hardstanding or grass. A tent field and a pull-through bay never look alike on the grid. Staff read the difference at a glance.

Length limit and rig features

The longest rig a bay takes is stored as a length limit, with notes on slide-out room, awning space and slope. A manager can override a limit, and the override is logged. A pull-through is marked as one.

Booked, held and blocked nights

Every night of a site shows as free, booked, held for a deposit or blocked. Blocked nights cover a broken pedestal, a flooded corner or a cabin out for repair. Staff see the reason beside the block.

Search by dates and needs

Arrival and departure dates, party size, rig length and hookup need go in at the office. Only the sites that fit come back. Pets, awnings and extra vehicles are noted on the same screen as the search.

A day at the barrier with the calendar

A campground day runs from early checkouts to a late arrival at the barrier. The pitch calendar is open at every step. These moments show where it earns its place on a busy weekend. Each item below is one person and one moment, taken from a park with tent fields, bays and cabins.

Morning enquiry at the office

A caller wants a long weekend for a motorhome and a dog. The office keys in the dates and rig length, reads out the two bays that fit and holds one. The call ends with a site.

Gate check at arrival time

A family reaches the barrier with a rig longer than the booking noted. The warden opens the calendar, finds the next bay with a bigger limit and moves the stay across. The change shows on the grid at once.

Midweek gap filling

A cancellation leaves a run of nights open in a cabin. The office filters the grid to cabins, sees the gap and offers it to the next waiting enquiry noted on the list. The gap is easy to spot.

Seasonal planning in the off season

The manager looks across the coming season, blocks bays booked for resurfacing and marks the bays held for seasonal guests before any tourer is sold. The rest stay open to touring bookings. Occupancy by pitch type is read from the same grid.

What each person sees on the grid

Everyone reads the same grid, but not everyone needs the same view. Roles decide what a person sees first. Each of the four below opens the calendar with a different question in mind.

Owners and park managers

The owner reads occupancy by pitch type and night, and sees which bays sit empty on which dates. A manager approves any length-limit override and sees it logged. Planning for peak dates starts from this view.

Office staff taking bookings

Office staff search by date, party size and rig, hold a site and see what is free for a caller or a web enquiry. They read pitch notes aloud. Callers hear the slope, the shade and the hookup before they book.

Gate and reception staff

The gate sees today’s arrivals against the pitch each guest holds. If a bay is blocked or a rig has changed, the warden finds another site that fits without ringing the office. Hand-over details sit on the same screen.

Grounds and cleaning crews

Crews open the calendar to see which pitches turn over today and which stay blocked for repair. A blocked bay is not prepared for a guest who is not coming. The job list matches the grid.

Decisions to settle before the calendar goes live

A calendar is only as good as the facts keyed into it. Four choices are best settled with the park manager before the first booking goes in. Each shapes what a guest is offered.

Who may change a site record

Decide who may edit a pitch’s hookup, length limit and notes, and who may block nights or override a limit. Name the manager and an office lead first. Add the senior warden if the gate needs it.

What is left out at first

Some sites may be left off the opening list, such as a field used only for rallies or a static unit with no bookings. Add them later. Keeping the list short makes the first calendar easier to check.

How existing bookings come across for Pitch calendar and availability

Bookings already taken are copied from your diary or sheet and compared with the paper diary before the first guest checks in. Settle which dates are loaded, and who checks each bay against the old record. Agree this early.

Which view matters first for Pitch calendar and availability

Pick the one report to read first. Occupancy by pitch type and night suits an owner. Arrivals and departures for the day suit the gate. Agree which one the manager checks each morning. Both come from the same grid.

Where the pitch calendar hands over work

The calendar is where a stay begins, so the other features read from it. A booking made at the gate, the office or the web page lands on the grid. From there, rates, deposits, cleaning and messages follow the dates. Here is what it takes and gives.

  • Takes bookings from the web page and the gate
  • Reads rate plans and seasons to price each night
  • Hands the held deposit to the stay’s folio
  • Passes departures to cleaning and grounds tasks as turnover jobs
  • Feeds dates to guest messages and arrival reminders

Where the pitch calendar stops

The calendar shows what can be booked. It does not set your rates, take the deposit or clean the cabin. Those sit in other features. Spacing between pitches and fire safety rules stay with the owner and an adviser. A small farm field with a handful of tents and no store can run on a paper chart and a cash box.

FAQ

Frequently asked questions

Can I block a pitch that is out of use?

Blocked nights are set on the site with a reason, such as a broken pedestal or repair work. The grid then shows them as unavailable. No booking from the gate or the web page lands on that site.

Does the calendar show cabins and yurts as well?

Cabins, yurts and glamping units sit on the same grid as tent fields and RV bays. Each has its own features and limits. A family asking for a roof is offered a roof, not a field.

What happens if the gate moves a guest to another bay?

The stay is reassigned on the calendar and the old bay opens again. The gate notes the reason on the stay. Any rate difference between the two pitch types is a decision for the manager.

Can the gate and the office look at availability together?

The gate, the office and the booking page all read one calendar, so a site held in one place shows as held in the others. One grid serves all three. No pitch is promised to two families on one night.

Is there a report of empty nights by pitch type?

A report of occupancy by pitch type and night shows which types sit empty on which dates, so a manager can see slow nights. Whether to change a rate is the manager’s call. The data comes from the grid.

Where it fits

How this feature fits the system.

Campground Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Reservations and online booking page

A web page shows free pitches for the dates a guest chooses, and the booking joins the calendar the gate staff read.

Online Booking Portal

Pitch calendar and availability

Each pitch, cabin and bay is held as a bookable resource with its supply type and length limit, so a rig meets a bay that fits.

Resource and Room Booking

Rate plans and seasons

Nightly, weekly and seasonal rates sit against each pitch type, with peak dates and minimum stays applied when the booking is priced.

Price Lists and Schemes
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements