Skip to main content
GullySystem

Timber, Plywood and Hardware Stock for Carpenters

Plywood, MDF, veneer, laminate and hardware are held by thickness, grade and shade. Useful offcuts become reusable stock lines, and a warning shows when a store level runs low. Teak beading and edge tape get lines too. The store keeper and the workshop lead use it daily.

What carpentry stock records hold

A stock record is a line for each board, finish or fitting that the shop buys and issues. Lines are separate when thickness, grade or shade differs, because one cannot stand in for another. Each line carries the quantity on hand.

Board lines by thickness and grade

Plywood and MDF are held by thickness and grade, so a sheet of one thickness is never counted as another when a job asks for board. A better grade sits on its own line. Quantity is held in sheets.

Laminate and veneer by shade

Laminate and veneer are held by shade as well as thickness, so a pale oak and a dark walnut are different lines. A shade the client chose is found by its name. Sheets are counted against it.

Hardware, beading and edge tape

Hinges, channels, handles, teak beading and edge tape each get their own line. Small parts are counted in pieces, and tape and beading in running lengths. A missing hinge is known early. Fittings are issued per job.

Offcuts as reusable lines

A useful offcut is kept as its own line, noted with board, size and finish on the edges. A later cutting list can use it before a fresh sheet is ordered. Scraps too small to use are written off.

Carpentry stock through a working week

Stock moves every time a board is cut, bought, issued to a job or returned as an offcut. These four moments show the store keeper, the workshop lead and the owner reading the same lines. Each begins with a question about the shelf.

Issuing board against a job

Before cutting starts, the store keeper issues the board and fittings on the cutting list against that job, line by line. Stock falls by exactly what was issued. The job’s board use begins to build up on its record.

A low level warns the buyer

A laminate shade falls below its set level after a large wardrobe job is cut. A warning shows on the stock list. The buyer raises a purchase order before the next job is held up for want of board.

Offcuts saved at the saw

After cutting, the operator measures what is left of a ply sheet. A piece worth keeping is entered as an offcut line with its size and edge finish. The next job’s list may use it. Scraps are written off.

The month-end stock count

At month end the store keeper walks the racks with the stock list. Counted sheets are compared with the figures on screen. A difference is looked into before the figure is corrected. The owner reads the result.

Who reads and who issues carpentry stock

Stock touches four roles, but only the store changes quantities. The others read what they need to plan, buy or fit. One stock list serves them all. Each reads it through the work in hand.

Owners and contractors

Owners read stock on hand with offcuts and low levels, and the money tied up in board. They also see board and hardware used against each job, so a quoted margin can be tested. Idle stock shows up as a figure.

Site engineers and estimators

Estimators check that the board and laminate in a quotation are on the shelf or on order. A shade that is out of stock changes what they promise the client. They read the store but never edit it.

The workshop and store

The store keeper receives, issues and counts. Workshop leads request board against a job and return the offcuts that are worth keeping. A gap in stock is flagged before the saw is switched on. Surprises stay off the floor.

Foremen and fitting gangs

A foreman asks the store for hardware and finishing items for a site and returns what is unused. Hinges and handles are counted out and back. A shortage on site is traced to the issue.

Decisions to settle before stock set-up

Stock accuracy comes from a few firm rules, set before the first count. Agree them with the store keeper, the workshop lead and the owner. Poor lines at the start weaken every report.

Who may issue and adjust stock for timber plywood and hardware stock

Decide who may issue board and who may correct a quantity after a count. If everyone can, nobody answers for a gap. Name the store keeper for adjustments and the owner for write-offs of damaged sheets.

What stock lines leave out

Decide the smallest item worth a line. Nails, screws and glue may be bought in bulk and left off the list as running costs. Sheets, shades and fittings a client chooses by name deserve their own lines.

Bringing in existing stock

Existing stock is counted once, shade by shade and thickness by thickness, and keyed in as the starting figure. Offcuts worth keeping are entered as lines at the same time. Count before new jobs are issued.

Which stock report matters first for timber plywood and hardware stock

Begin with the report of stock on hand with offcuts and low levels. Fix the reorder level for each board line first. Without a level, the warning has nothing to compare against. Start with the busiest lines.

Stock handing over to purchasing and cutting

Stock is the point where planning meets buying in a carpentry shop. The cutting list asks what is on the shelf, the purchase order fills the gaps, and the job card draws from it. Five hand-offs are worth setting up. Each is listed below, with the record it touches.

  • Cutting lists and board planning ask for sheets needed
  • Purchase orders and dealer accounts add received board
  • Workshop job cards draw issued board against the job
  • Quotations by area or item name the board sold
  • Snag lists and handover draw small fittings for repairs

Where timber and hardware stock stops

Stock records quantities and levels. It does not grade a board, judge a shade or count the racks by itself. A person must count and record. How stock is valued in the accounts is for your accountant. A small shop that buys board for each job and uses it all may need no stock list.

FAQ

Frequently asked questions

How are shades of laminate kept apart?

Each shade is its own line, so a pale oak and a dark walnut never share a quantity. Search by shade name or by thickness. A cutting list names the shade, and the store issues that line.

What triggers the low stock warning?

A reorder level is set for each line, and the warning shows when the quantity falls to it. Busy lines, such as ply, need higher levels. Set them with the store keeper, who knows how fast each line moves.

Can I see which job used which board?

Each issue from the store is recorded against the job it served. The board and hardware report then shows the real use, job by job. Compare it with the plan to test a quoted margin. Gaps are easy to see.

How are damaged sheets handled?

A damaged sheet is written off with a note, so the quantity on hand stays true. The owner decides which write-offs are acceptable. A run of damage points to the way board is stored or delivered.

Does a received delivery add to stock?

Stock rises when a delivery is checked against its purchase order and accepted by the store keeper. A short delivery adds only what arrived. The balance stays open on the order until the dealer supplies it.

Where it fits

How this feature fits the system.

Carpentry Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and site visits

Enquiries are logged by address and type of work, visits are scheduled, and unanswered quotations are listed for follow-up.

Lead Management

Quotations by area or item

Wardrobes, doors and panelling are priced by area or piece from your rate card, with board and finish named.

Estimate/Quotation Management

Timber, plywood and hardware stock

Board, laminate and hardware levels are tracked by shade and thickness, with an alert when a store runs low.

Stock Tracking and Alerts
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements