Certificates of analysis and limit checks for laboratories
Certificates and limit checks compares approved results with the limits for the client’s site or permit. It issues a signed certificate in the laboratory’s own layout. Limits sit beside each value, a named signatory signs, and every version is kept. Clients download the current certificate from their login.
What a certificate of analysis carries
A certificate is a record first. It holds the results, the limits, the sample details and the signature, and it knows which version it is. Its layout is the laboratory’s own, and clients receive it in the form they expect.
From approved batch to signed certificate
Certificates are issued daily. The moments below follow one set of results for one client’s order, from approval through to download. Each moment is a person at the reporting desk or the signatory’s screen, checking before anything leaves the building.
Who prepares, signs and receives certificates
Four roles meet at the certificate. One prepares it, one signs it, one audits it and one receives it. Each sees the same version but acts on a different part of it.
Decisions to settle before certificates are issued
Four decisions control what leaves the laboratory with your name on it. Settle them with the manager, the quality manager and the person who signs. Every one affects a client.
How certificates link to results and invoices
The certificate sits at the end of the sample record. It takes approved results from review, limits from the client record and layouts from set-up. When it is issued, the work is complete, and the invoice can follow the tests that were done. A superseded certificate stays on file.
- Takes approved results from result entry and review
- Takes permit limits from clients, sites and permits
- Reads sample details from receipt and custody
- Files superseded versions and instrument data with the sample
- Tells quotes and invoicing which tests are complete
Where certificates and limit checks stop
The feature compares numbers and prints a document. It does not decide whether a result meets a regulation, whether a permit has been breached or what a client must report to an authority. Those conclusions belong to the client and its adviser. The laboratory states results. A laboratory that issues a few certificates may use a fixed template.
Frequently asked questions
Can a certificate follow our own layout?
Yes, from one you already issue. GullySystem staff reproduce the layout your clients and your quality system expect from that certificate. The laboratory agrees the wording. Later changes to the layout are made on request, so a revised wording does not wait for a project.
What does a limit check actually show?
Each reported value appears beside the client’s limit for that parameter, with a mark where it exceeds the limit. It is a comparison of two numbers. Whether a sample complies in law is for the client and its adviser.
Can a client see older versions of a certificate?
The current version is clear. Older versions are kept and marked as replaced, so the laboratory can show what was issued and when. Whether the client’s login lists the old ones is set at implementation.
Can two people sign one certificate?
Yes, if your rules ask for it. Set the rule for each certificate type during implementation. Each signature is attributed with its time, and the certificate shows both names. Some certificate types may need two signatures and others one, which your quality system decides.
Is a certificate editable after it is signed?
No, a signed certificate is not edited. A correction issues a new version, signed again, and the old one is marked as replaced. That keeps the file straightforward for an audit or a client’s query.
How this feature fits the system.
Environmental Testing Laboratory Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Sampling schedules
Each field round is placed against the samplers who will drive it, with the sites, bottle sets and visit dates visible to the whole team.
Technician SchedulingAnalytical batches and controls
Every sample receives a laboratory number and travels in a batch, so any result can be followed back to its bottle, analyst and run.
Batch and Serial TrackingSample receipt and labelling
Labels printed at the receipt desk carry the laboratory number for the bottle and each aliquot drawn from it.
Barcodes and LabelsTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements