Skip to main content
GullySystem

Site Attendance for Deployed Facility Staff

Attendance is marked where the work happens, not at your head office. Each entry carries the site, the shift, the post and the proof your client accepts.

How a duty is marked

Facility staff report at the client premises, so marking has to happen there.

By phone

The site facility manager marks the shift from a phone. A photograph and the location reading are taken with the entry.

By device

A biometric or card unit at the gate can feed readings in, where the site already has one and the make allows it.

Shift in and shift out

Both ends are recorded, so a person who left at midday is not counted for a full duty.

Absence and cover

An absence is marked with its reason, and the reliever who stood in is written against the same post and shift.

Extra duty

A double shift, a holiday duty or an extra hand the client asked for is marked separately from the regular duty.

How attendance supports billing and audits

Attendance is the evidence behind a manpower bill. Auditors and clients sample days and compare the sheet with the gate register. If your entries match the client’s, the bill stands. Where they differ, you need the reason on file.

Matching the client’s gate register

Both sides see the same people on the same days. Differences are listed with the post and shift.

Proof of presence

Photograph or device reading, where the contract asks for it.

Late arrival and early leaving

Marked, so a half duty is counted as one.

Absence reasons

Leave, no report or sick, each stored with the day.

Where the entries travel

One marking at the gate serves three different screens later in the month.

  • The deployment screen compares present strength with the plan
  • The site bill counts duties delivered against duties contracted
  • The wage sheet reads duties, overtime and extra hands
  • Absence patterns per person show on the staff record

Marking when the phone fails

Phones die, supervisors forget and signals drop. Plan for the day it happens. A late marking is allowed by the back office with a reason. Those entries are listed separately, so a pattern of late markings at one site is seen and discussed. Without that list, late entries blend into normal ones and nobody notices.

Corrections

A marking made in error can be corrected by the back office. The old entry is not wiped. The change is kept with its reason, so a bill queried in the third week can still be traced. Site staff cannot alter a past day on their own.

Points to agree with the client on attendance

  • Whether location capture is acceptable to the client and to staff
  • Which device, if any, is already at the gate
  • Who countersigns the monthly attendance sheet
  • How half duties and double shifts are counted
  • Where staff of other vendors are recorded

What site attendance leaves out

It does not judge whether a duty was performed well. Inspection rounds cover that. It makes no claim about any statutory register your client may ask you to keep, and that question belongs with your accountant or advisor.

Marking attendance through a site day

Attendance at a facility site is not one event. It is a series of entries across shifts, each by a different person. These scenes follow a day at one site. They show who marks what and how a wrong entry is corrected.

Morning shift begins

Guards and housekeepers mark presence on a phone or device as they reach their posts. The supervisor sees the strength as it builds. A post still empty at the start time is flagged and covered.

A shift in the middle

At two in the afternoon, a relief guard arrives and the earlier guard leaves. Both entries are made. The post shows continuous cover. No gap. The record carries the post and the shift against each name.

The extra duty request

The client’s admin asks for two extra housekeepers for an event. These two are marked as extra duty by the supervisor, with the request noted. These entries stay apart from regular duty. They reach the bill with their reason.

A day’s end review

Reading the full list for the site, the supervisor checks absences against reasons and corrects a missed entry with a note. The corrected list is the one the office uses. Wage and bill both read from it.

Agreeing attendance rules with the client

Attendance rules are partly yours and partly the client’s, and the two need to match. Before the first entry is made, both sides should know what proof counts and who may correct it. Agree these points at the start. Put them in writing.

What proof the client accepts

Ask whether the client accepts phone entries, a device or only their own gate register. Some clients want a photograph. Record the answer for each site. The proof then matches what an audit will ask for.

Who may enter and correct

Decide whether guards mark their own presence or the supervisor marks for all. Also decide who may correct a wrong entry. A named person with a note is better than an open edit. Write that name down.

When a shift is considered late

Agree the minutes after which an arrival is marked late and the point at which it becomes an absence. Write it for each site. Wages and billing then follow the same rule, without a second argument.

How old attendance comes across

Decide whether previous months are loaded or the system starts at the beginning of a fresh month. Starting fresh is simpler. Loading old data helps only when history is needed for a live dispute with a client.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

How attendance supports billing and audits

Can a correction be traced to the right date and session?

For “How attendance supports billing and audits”, check a late correction against the original register. Agree who may amend it and which downstream total should change after the correction.

Background reading: Frappe HR: attendance records

FAQ

Frequently asked questions

Does marking work without a network at the site?

Entries made on a phone are held and sent when the signal returns, so a basement or a lift lobby does not block the shift.

Can the client see attendance for their own site?

Yes, if you open a client login. They then read present strength for their site and nothing from your other contracts.

Is a photograph compulsory?

No. Photograph and location capture can be turned on for the sites where your clients want it and left off elsewhere.

What about staff who work at two sites in a day?

Each duty is marked against its own site, so the bill for each client carries only the hours spent there.

Can staff mark their own attendance?

That depends on the arrangement. Most sites have the facility manager mark for the shift, and a device can feed in readings where one exists.

What if a phone is lost mid-shift?

The facility manager signs in on another phone, and entries already sent remain. Unsent entries on the lost phone are entered again by the office.

How are night shifts that cross midnight counted?

A shift belongs to the day on which it starts, with its end time recorded.

Can the client approve attendance online?

A client login can read the sheet. Whether it also signs off is a set-up choice.

Where it fits

How this feature fits the system.

Facility Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Sites and contracts

Each client site is held with its blocks, posts, service scope, rate per category, billing cycle and the dates the agreement runs.

Contract Management

Attendance at the site

Staff mark in and out where they report, by phone with a photo and location, or through a device at the larger sites.

Attendance & Time Tracking

Complaint helpdesk

Residents, tenants and office admins log complaints by category, the desk assigns them with a reply time, and closure records the work done.

Helpdesk Automation
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements