Explosives, wire and spare stock for quarries
This feature tracks detonators, explosive, diamond wire, drill bits and spares as they are received and issued. Reorder levels are set for the items whose absence stops the face. A drill crew that finds the store empty is the problem it is meant to prevent. That morning never comes.
What the quarry store records for each item
A quarry store holds a few items that matter far more than their price. A saw cannot cut without wire. A rig cannot drill without bits. Every item below is entered once, and then moves in and out by receipt and issue.
From delivery to the saw and the rig
Stores work is short and repeated. Busy faces make it easy to skip. These four moments are where the record is made, from the gate to the saw. Each is a few taps, done by the person who has the item in hand.
Who handles the store and who reads it
Few people should touch the store. More should read it. The roles below show how the work is shared. Putting a name to each task matters here more than on almost any other screen of the product.
Decisions to settle before stock is counted
Stock records matter for the few items that halt the work. Those need care first. Settle four points with the manager and the store’s keeper. Do it first. GullySystem staff then set up the item list and the levels you choose.
How the store connects to blasts and machines
Stock only has meaning where it is used. Explosive meets a blast. Wire meets a saw. A bit meets a rig. The links below show where issues from the store feed other records. Nobody then types the same fact in two places, and the figures agree.
- Drilling and blasting log shows the charge drawn from stock
- Machine hours and maintenance records each wire and bit change
- Haulage, loading and diesel tracks fuel issues in the same way
- Crews and shifts names the people who drew items that day
- Bench and face plan shows which face the stock was used on
Where store tracking stops
This record counts what is entered. It does not lock a magazine, check a licence or tell the quarry how much explosive the law lets it hold. Those duties stay with the owner and the adviser. A missed receipt gives a wrong balance until someone counts. A quarry that fires a rare shot can keep a bound book.
Frequently asked questions
Can the store show what is about to run out?
A reorder level is set per item. Items at or under their level are listed on the screen. Setting the level is the manager’s call. The list then shows what needs buying before the face is stopped.
Is explosive tracked by the shot?
Issues to the blaster are entered with a name and time. The charge for each blast sits in the blast log. The two can be read side by side. They are separate records, and the manager reconciles them.
Can diamond wire be followed to the saw?
Issues name the saw that received the wire. The machine record also carries the wire change. Reading the two together shows how much wire a saw has consumed. It also shows how frequently the wire was changed.
Does it handle licences and storage rules?
Not at all. Storage, licensing and reporting rules for explosives vary by region and stay with the owner and an adviser. The product keeps quantities received and issued, and nothing is filed with an authority.
Who counts the shelves at the start?
Whoever keeps the store counts, and the manager checks a sample. Those balances are entered as opening stock. Reorder levels are then set from your own experience of use. Staff can adjust them later on request.
How this feature fits the system.
Granite and Stone Quarry Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Block register
Each squared block holds its own number, three measurements, volume and source bench, so a buyer’s query is traced to the face it came from.
Batch and Serial TrackingGrading and inspection notes
The inspector records the grade, the reason and a photograph against the block, so a disputed grade is reviewed against the notes made that day.
Quality ControlMachine hours and maintenance
Rigs, wire saws, loaders and the crusher each carry hour readings, service intervals, wire and bit changes and breakdown history.
Asset AMC TrackingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements