Machine hours and maintenance keeps one history for each drill rig, wire saw, loader and crusher. Meter readings go in as taken. Service intervals, wire and bit changes and breakdowns sit on the same record. A failing saw is noticed before its cost shows up.

What each quarry machine record holds

A machine is a record with a history, not a line on a list. Every rig, saw, loader and crusher gets its own page in the product. Readings and events are added as they happen. Nothing is written up from memory later.

Hour meter readings

The operator or foreman enters the hour meter reading for the machine. Each entry carries a date. Hours in a period are the difference between two readings, so nobody has to add shift sheets by hand.

Service intervals per machine

Your own service interval is set for each machine. The record shows how far the machine has run since its last service. A rig near its limit stands out. A saw that is overdue stands out more.

Wire and bit changes

A new diamond wire on a saw, or a fresh bit on a rig, is logged with the reading at the time. The next change is then compared with the last. Short life is visible without asking anyone.

Breakdowns and what followed

A breakdown is entered against the machine with its date and a note. The hours lost are read from the gap before the next reading. A fault that returns is plain to see. It cannot hide in a notebook.

A week of readings, services and breakdowns

Maintenance work is done by people with grease on their hands, so entries must be quick. The moments below are the ones when a machine record is opened on a phone or at the office desk. Each takes a minute. Each one replaces a line in a notebook.

Readings at shift start

The saw operator checks the meter before work and types the reading on a phone. At shift end, another reading follows. Run time is known from the two figures. The shift sheet no longer needs adding up.

Fitting a new wire

When the cutting crew fits a fresh diamond wire, the foreman records the change against the saw. The wire’s life will be read from the next change. Nobody guesses how long the last one lasted.

A rig stops mid-shot

A drill rig fails with holes half done. The foreman enters a breakdown with a short note. The manager sees the rig is idle and moves the crew. Work does not wait for a phone call to reach the office.

The service that comes due

On Friday the manager reads which machines are near their service interval. A loader is due. The booking is made for a quiet day. The service is then entered with the reading at the time, so the next interval starts from a true figure.

Who feeds the machine record and who reads it

The people who run machines enter the facts. The people who plan work and pay for fuel read them. This split keeps entries honest. The operator of a machine has no reason to guess its hours.

For blaster and drill crew

The drill crew enters rig hour readings and notes a bit change or a breakdown. The blaster does the same for any equipment under their care. The entry is quick. It is made on a phone where the machine stands.

For quarry managers

Managers see which rigs or saws are idle, which are near a service and which have broken down. They plan benches and crews around that. This turns a hunch about a tired machine into a figure.

For the quarry owner

The owner reads machine cost per cubic metre without calling the face, with diesel and hours set beside blocks cut. One machine that costs far more than the others is easy to question. Nothing is hidden.

For weighbridge and accounts staff

Accounts staff read hours and diesel together when the owner asks for a cost. They do not enter readings. The figures come from the people at the machines, which keeps the numbers close to the work.

Decisions to settle before machines are listed

A machine list is only as useful as its first set of readings. Settle four decisions with the foreman and the manager before go-live. Then every machine starts with a true meter figure and a clear service interval. Begin with true figures.

Who may correct a reading for Machine hours and maintenance

A typing slip happens. Decide who may correct a reading once saved, and whether the old figure stays visible. Saws and rigs are costly. A quiet edit of their hours would weaken the whole record for every later report.

Which machines are listed

List every rig, saw, loader and the crusher that you want tracked. Decide whether small pumps or hired machines are included. Hired machines may be billed by the hour. Some quarries list them as well.

Starting readings and service dates

Enter each machine with its current hour meter and its last service. Staff set the intervals you give them. A wrong starting figure carries through every report. Check it at the machine itself, not from a sheet.

The report to read first for Machine hours and maintenance

Pick diesel and machine hours by rig, saw, loader and crusher. This is the plainest view. Hours run and fuel drawn sit side by side, and service and breakdown history can be read in the same sitting.

How machine records connect to diesel and crews

Hours alone tell a limited story. Joined with fuel, crews and output they explain cost. This record gives hours to other features and takes a few facts from them. The lines below list those links, from fuel to blocks cut. Each one saves a second entry somewhere else in the quarry.

  • Haulage, loading and diesel reads hours beside fuel issued
  • Drilling and blasting log uses the rig that drilled each shot
  • Explosives, wire and spare stock supplies wire, bits and spares
  • Crews and shifts shows who ran the machine that shift
  • Block register shows blocks cut, for cost against output

Where machine tracking stops

This record notes what the meter and the foreman report. It does not diagnose a fault, plan a repair or replace the workshop manual. It cannot read a meter by itself. A missed reading stays missed. Service quality, warranties and repair bills stay with the manager and the supplier. A single loader can be tracked with a notebook in the cab.

FAQ

Frequently asked questions

Are the hour meters read automatically?

Readings are entered by the operator or foreman. The product page lists no automatic meter feed. Where a quarry wants one, that is a separate discussion at the first workshop. Start with entries on a phone.

Can we set a different service interval per machine?

Each machine carries its own interval, entered at the start. A loader and a wire saw need not match. GullySystem staff change an interval on request. The record shows hours run since the last service.

How do we see which saw is failing?

Wire changes and breakdowns are kept per saw, with the reading at each event. A saw changing wire sooner, or stopping again and again, shows in its history. Diesel and hours add a cost view. The numbers agree with the foreman.

Does the crusher go on the same list?

Add the crusher with the rigs, saws and loaders. It gets hour readings, a service interval and a breakdown history like any other machine. Its tonnes come from the stock screens. Hours come from here.

What about a machine we hire in?

A hired machine can be listed with its own hour readings if the manager wants it tracked. Hire charges and agreements stay with the accounts office and the supplier. This feature keeps the hours only.

Where it fits

How this feature fits the system.

Granite and Stone Quarry Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Block register

Each squared block holds its own number, three measurements, volume and source bench, so a buyer’s query is traced to the face it came from.

Batch and Serial Tracking

Grading and inspection notes

The inspector records the grade, the reason and a photograph against the block, so a disputed grade is reviewed against the notes made that day.

Quality Control

Machine hours and maintenance

Rigs, wire saws, loaders and the crusher each carry hour readings, service intervals, wire and bit changes and breakdown history.

Asset AMC Tracking
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements