Machine hours and maintenance for quarries
Machine hours and maintenance keeps one history for each drill rig, wire saw, loader and crusher. Meter readings go in as taken. Service intervals, wire and bit changes and breakdowns sit on the same record. A failing saw is noticed before its cost shows up.
What each quarry machine record holds
A machine is a record with a history, not a line on a list. Every rig, saw, loader and crusher gets its own page in the product. Readings and events are added as they happen. Nothing is written up from memory later.
A week of readings, services and breakdowns
Maintenance work is done by people with grease on their hands, so entries must be quick. The moments below are the ones when a machine record is opened on a phone or at the office desk. Each takes a minute. Each one replaces a line in a notebook.
Who feeds the machine record and who reads it
The people who run machines enter the facts. The people who plan work and pay for fuel read them. This split keeps entries honest. The operator of a machine has no reason to guess its hours.
Decisions to settle before machines are listed
A machine list is only as useful as its first set of readings. Settle four decisions with the foreman and the manager before go-live. Then every machine starts with a true meter figure and a clear service interval. Begin with true figures.
How machine records connect to diesel and crews
Hours alone tell a limited story. Joined with fuel, crews and output they explain cost. This record gives hours to other features and takes a few facts from them. The lines below list those links, from fuel to blocks cut. Each one saves a second entry somewhere else in the quarry.
- Haulage, loading and diesel reads hours beside fuel issued
- Drilling and blasting log uses the rig that drilled each shot
- Explosives, wire and spare stock supplies wire, bits and spares
- Crews and shifts shows who ran the machine that shift
- Block register shows blocks cut, for cost against output
Where machine tracking stops
This record notes what the meter and the foreman report. It does not diagnose a fault, plan a repair or replace the workshop manual. It cannot read a meter by itself. A missed reading stays missed. Service quality, warranties and repair bills stay with the manager and the supplier. A single loader can be tracked with a notebook in the cab.
Frequently asked questions
Are the hour meters read automatically?
Readings are entered by the operator or foreman. The product page lists no automatic meter feed. Where a quarry wants one, that is a separate discussion at the first workshop. Start with entries on a phone.
Can we set a different service interval per machine?
Each machine carries its own interval, entered at the start. A loader and a wire saw need not match. GullySystem staff change an interval on request. The record shows hours run since the last service.
How do we see which saw is failing?
Wire changes and breakdowns are kept per saw, with the reading at each event. A saw changing wire sooner, or stopping again and again, shows in its history. Diesel and hours add a cost view. The numbers agree with the foreman.
Does the crusher go on the same list?
Add the crusher with the rigs, saws and loaders. It gets hour readings, a service interval and a breakdown history like any other machine. Its tonnes come from the stock screens. Hours come from here.
What about a machine we hire in?
A hired machine can be listed with its own hour readings if the manager wants it tracked. Hire charges and agreements stay with the accounts office and the supplier. This feature keeps the hours only.
How this feature fits the system.
Granite and Stone Quarry Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Block register
Each squared block holds its own number, three measurements, volume and source bench, so a buyer’s query is traced to the face it came from.
Batch and Serial TrackingGrading and inspection notes
The inspector records the grade, the reason and a photograph against the block, so a disputed grade is reviewed against the notes made that day.
Quality ControlMachine hours and maintenance
Rigs, wire saws, loaders and the crusher each carry hour readings, service intervals, wire and bit changes and breakdown history.
Asset AMC TrackingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements