Skip to main content
GullySystem

Drilling and blasting log for quarries

The drilling and blasting log is where a quarry writes down each shot: the holes, their depth, the pattern and the explosive charged. The blaster’s name and the time sit on the same row. Each shot gets one line. Rock moved afterwards is logged against that blast, so yield can finally be read shot by shot.

What a blast record holds in the quarry

One blast is one row. The row is opened before the shot. It carries the figures the drill crew and the blaster would otherwise keep in a notebook. Everything below is entered once and then read by the office, the manager and the yard.

Holes, depth and pattern

The drill crew enters the count of holes drilled, how deep each one went and the pattern they followed. Figures stay beside the blast they belong to. The manager reads them later without hunting for a sheet.

Explosive charged per blast

The blaster records the explosive charged for the shot. This is the number a manager wants when comparing one pattern with another. Keep it close. It sits on the same row as the holes, never in a separate book.

Rock moved afterwards

After the shot, the rock moved is logged against the same blast. Loaders and trucks working the muck pile give the figure. One row then shows what went in. It also shows what came out, so the shot is judged on both.

A shot from drilling to cleared muck pile

A blast is a short sequence. Several people take part. This record follows that sequence and asks each person for only the part they know. Here is how a single shot passes through the record, from the first hole to the cleared pile.

Drill crew marks the holes

As drilling finishes, the crew foreman opens the blast and enters holes, depth and pattern on a phone. A hole count taken at the rig is better than one remembered at the camp. Entry takes minutes.

Blaster charges and records

Before the shot, the blaster adds the explosive charged and signs the row with a name before the charge is fired. The log then holds the shot’s plan. It can still be checked against what is in the holes.

Shot fired and time kept

The time on the row is the time of entry, so a blast cannot drift into the next day’s paperwork. Anyone can see which shot belongs to which hour. Two shots on one bench stay apart. Each has its own row.

Loading crew clears the pile

Over the following shifts, the loading crew reports rock moved. Each report is added to the blast row. When the pile is gone, the manager sees the total next to the charge that broke it.

Who writes and who reads the blast log

Writing the log is a job for the people at the face. Reading it is a job for the office. The two jobs stay apart. Each role below sees the part that matters to the work it does.

For blaster and drill crew

They enter holes, depth and charge on a phone before the shot. Nothing is written up later. The blaster’s own name goes on the record, so the entry is a statement of what was done.

For quarry managers

Managers review blast records and yield, and compare patterns shot by shot. Repeat a pattern that gave sound blocks. Question a pattern that gave rubble, with the figures in front of the crew and the blaster.

For the quarry owner

The owner reads rock moved and blocks cut without calling the face. Charge and yield are on the page. A difficult month can be explained from the log, instead of from conversations with the crew.

For yard supervisors

Supervisors see which blast a block came from through its bench and date. When a buyer queries one block, the blast row is read next to the block row. The answer is found in the office.

Decisions to settle before blasts are logged

The blast log is the record that carries the greatest risk. Answer the questions below together, manager and blaster. GullySystem staff then set the entry screen to match whatever is agreed.

Who may change a blast row

Settle who can edit a row once it is saved. Rows should stay fixed. A blaster should not rewrite a charge after the shot. Corrections by the manager alone are safer, and the manager can be asked to note the reason beside each change.

What the log leaves out for Drilling and blasting log

It keeps holes, depth, pattern, charge, name, time and rock moved. Decide in advance which other papers stay outside it. Statutory registers kept on paper are one example. Those are for the quarry and its adviser to settle.

Earlier blasts and how they enter

Bring a recent blast sheet to the first workshop. Staff use it to set the entry screen. The foreman then sees how a row looks. Whether older sheets are keyed in is a choice for the manager.

The report to read first for Drilling and blasting log

Choose between the blast log by bench and the yield by pattern. The first lists shots with holes, charge and rock moved. The second needs a run of rows. Start with the first, because it needs no history to be useful on the first day.

How the blast log connects to other records

A blast sits between the bench where it was fired and the blocks that come from it. Those two neighbours give the log its meaning. Other parts of the product touch it more lightly, by supplying people, explosives and machines to the shot or by reading its totals.

  • Bench and face plan supplies the bench each blast is fired on
  • Block register traces numbered blocks to the blast that freed them
  • Explosives, wire and spare stock records detonators and charge issued
  • Machine hours and maintenance carries the drill rig’s meter readings
  • Crews and shifts names the drill crew and the blaster on duty

Where the blasting log stops

This record shows what was done. It does not design a pattern, calculate a charge or decide that a shot is safe to fire. Those judgements belong to the blaster, the manager and the adviser the quarry relies on. Statutory returns and the rules on explosives also stay with the quarry. A site that fires one small shot a month can manage with a bound register until volume grows.

FAQ

Frequently asked questions

Can a blast be tied to the blocks it produced?

Yes, through the bench and the date. Each block row names its source bench, and the blast row sits on the same bench. Reading both together shows which shot freed the stone a buyer is asking about.

Does the blaster need a phone at the face?

Holes, depth and charge are entered on a phone before the shot, so one is needed. Keep it simple. A shared phone kept by the foreman is enough. Staff show the entry screen at the first workshop.

What if rock moved is not counted straight away?

The row stays open. Loaders add their figures shift by shift, and the total builds against the blast. Until the pile is gone, the row shows a running figure. Nothing is rewritten. The total simply grows, and the manager reads it at any point.

Can we compare one pattern with another?

Yes, once several blasts are logged. Each row holds its pattern, charge and rock moved, so the manager lines up rows from the same bench. The figures are a guide.

Does it replace the explosives register?

It records the charge for each blast. It is not a statutory register. Which paper registers the quarry must keep is for the owner and an adviser to confirm, and the log sits beside them.

Where it fits

How this feature fits the system.

Granite and Stone Quarry Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Block register

Each squared block holds its own number, three measurements, volume and source bench, so a buyer’s query is traced to the face it came from.

Batch and Serial Tracking

Grading and inspection notes

The inspector records the grade, the reason and a photograph against the block, so a disputed grade is reviewed against the notes made that day.

Quality Control

Machine hours and maintenance

Rigs, wire saws, loaders and the crusher each carry hour readings, service intervals, wire and bit changes and breakdown history.

Asset AMC Tracking
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements