Grading and inspection notes for quarry blocks
Grading and inspection notes put the grade of each squared block on record, with the reason for it and a photograph. Veins, cracks and colour bands decide the price of stone. When a buyer disputes a grade, the inspector’s notes from the day are read first. Memory is not needed.
What an inspection note records on a block
A grade needs a reason. Otherwise it is only an opinion. This feature attaches three things to the block row. The inspector chooses the grade and the reason from lists the quarry owns, and adds a photograph while standing at the stone.
An inspector’s day with blocks and buyers
Inspection happens at the stone, with a phone in hand. The work is short and repeated all day. Each step below adds to the same note. Disputes arrive later, but the evidence is gathered here, while the block is still in view.
Who writes grades and who relies on them
Grading is the inspector’s call, and the other roles lean on it. Each reads the note for a different purpose. Four of them are described below, with what each should expect to find on the block row.
Decisions to settle before grading is recorded
Grading words carry money, so the quarry should agree them before the first block is graded. GullySystem staff enter whatever is decided. Four points need an answer from the manager and the senior inspector.
How grading notes connect to block and yard
A grading note has no life of its own. It hangs from a block row. It travels with that block through the yard and out of the gate. Other parts of the product read the grade without asking the inspector again, and the bullets below list them.
- Block register holds the row each note is attached to
- Yard bays and crushed stone stock lists blocks by bay and grade
- Buyer orders and dispatch picks blocks with the grade the buyer wants
- Invoices and receipts carries the block, and its grade, to the buyer
- Bench and face plan shows which face gave which grades
Where inspection notes stop
A note records a judgement. It does not make the judgement, test the stone or settle a price. The inspector’s eye decides the grade. A laboratory test, if the buyer wants one, stays outside the product. A disputed block still needs a conversation, and the notes give that conversation facts to work from. A very small yard can grade by eye alone.
Frequently asked questions
Does the software decide a disputed grade?
It does not. The software only keeps the inspector’s notes and photograph from the day. The manager and the buyer’s agent read them together. The decision stays with people. They now have a record in front of them.
Can the grade list be changed later?
Grades and reasons are entered by GullySystem staff, and changes are made on request. Say so before a new scale is painted on stone. Old notes keep the words they were written with. History stays honest.
Where are the photographs kept?
Each photograph is attached to the note and so to the block row. Staff find it by block number. The register and the note show the same block, so a picture is never separate from its stone.
Do we have to grade every block?
The register shows which blocks are not yet graded, so gaps are visible. How strict to be is a choice for the manager. A block sold before grading has no note to read later. Keep that rare.
Who sees a grading note?
Staff with a login who work with the block row. Which roles may read or change notes is agreed at set-up. Buyers see nothing. A picture reaches them only if someone from the quarry sends it.
How this feature fits the system.
Granite and Stone Quarry Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Block register
Each squared block holds its own number, three measurements, volume and source bench, so a buyer’s query is traced to the face it came from.
Batch and Serial TrackingGrading and inspection notes
The inspector records the grade, the reason and a photograph against the block, so a disputed grade is reviewed against the notes made that day.
Quality ControlMachine hours and maintenance
Rigs, wire saws, loaders and the crusher each carry hour readings, service intervals, wire and bit changes and breakdown history.
Asset AMC TrackingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements