Bench and face plan for stone quarries

The bench and face plan holds each bench of a quarry with its level, its face and the area opened this month. Every blast and every squared block is tied back to the bench it came from. Managers plan the next cut here. Blasters, drill crews and yard supervisors read the same record.

What the bench plan keeps for each face

Each bench is a record of its own. It sits in the plan with a name, a level and a face, and everything the quarry does afterwards hangs from it. From the plan, a manager opens a bench, reads it, and sees which work has already been charged to it.

Bench name and level

Every bench carries its own name and its level, entered by the manager when the bench is opened. Names match the face. A blaster or yard supervisor picking from the list sees the word the crew already uses.

Face worked on the bench

The face is recorded as part of the bench, so the plan shows which wall of the quarry is being worked. Blasts are then placed against a real face. Nobody has to describe the spot from memory.

Area opened this month

The area opened on a bench this month is noted against it. A new month gets its own figure, which lets the manager compare one bench with another. Short entries are enough. It is a working record, not a survey drawing.

Blasts and blocks linked back

Each blast and each numbered block names the bench it came from. Open the bench to see the work. The link runs both ways, so a buyer’s query about a block can be followed up to this record.

A bench through the quarry’s working week

Reading the plan matters as much as it is written, and the entries are small. A manager opens a bench before the week starts. Crews check it before a shot, and the yard looks at it when a block needs a source. Each moment below uses the same bench record.

Planning on the first morning

The manager opens the benches for the week and notes the area to be worked on each one. A bench nearly worked out stands out. Next month’s plan then starts from what the records show, not from recollection.

Blaster choosing a bench

Before a shot, the blaster picks the bench from the list. The hole entries then hang from it. Holes, depth and charge are entered on a phone, so the record starts at the face and carries the bench name with it.

Supervisor numbering a block

When a squared block is numbered, the supervisor names the bench it was cut from. One pick from the list does it. Later, the block row and the bench row point to each other without any copying.

Month-end walk of the face

At the close of the month, the manager walks the face and updates the area opened. Differences from the plan are visible at once. The next bench to open is chosen with this figure in hand.

Who reads the bench plan and what shows

Each role opens the plan for its own reason. What changes is the question being asked, and how much of the bench the person needs to see.

For the quarry owner

The owner reads blocks cut and sold, and can trace that output back to benches. A bench that gave little is visible. The owner does not need to call the face to ask which bench is working.

For quarry managers

Managers open and plan benches, set the level and face, and note the area opened each month. They review blast records and yield by bench before the next shot is planned. This is the main working screen for them.

For blaster and drill crew

The blaster and drill crew choose a bench from a short list and enter holes, depth and charge on a phone. Their job is to pick the bench, not to redraw it. A name is all they need.

For yard supervisors and inspectors

Supervisors and inspectors read the bench when a block is numbered, graded or queried. The source bench sits on the block row. A buyer’s agent gets an answer from the register without a walk to the face.

Decisions to settle before the bench plan starts

A few choices are best made before the first bench is entered. They concern people and paper. GullySystem staff set the plan up, and the manager answers these four points at the start.

Who may change a bench

Name the person who may open a bench, change its level or close it once the work there is done. A single named manager keeps the plan from drifting. Blasters and crews only pick from the list.

What the plan leaves out for Bench and face plan

A survey drawing, a drilling design or a slope calculation is not held here. The plan keeps names, levels, faces and areas, which is enough for blasts and blocks to point to.

How present benches come across

Bring the current bench list to the workshop. Staff key in each bench with its level and face, one by one. Then the manager checks every name against the words the crew uses on the face.

Which question comes first

Choose the first question the plan must answer. If it is blocks cut by bench, grade and colour, every block needs its source bench from day one. The blast log by bench is the other candidate.

How the bench plan connects to blasts and blocks

Everything starts with the bench record. Blasts and blocks point back to it. Managers read what those two report against each bench, and the bullets below show where the bench name appears elsewhere in the product. Machines, crews and dispatch reach the bench only through those records.

  • Drilling and blasting log takes the bench name for each shot
  • Block register records the source bench against every numbered block
  • Grading notes reach the bench through the block they describe
  • Crews and shifts assign drill and cutting crews to a bench
  • Yard bays receive blocks that still carry their bench of origin

Where the quarry bench plan stops

This plan is a working record. It stays small on purpose. It does not draw the quarry, design a blast or decide how steep a face may be. Those judgements stay with the manager and with the engineer or adviser the quarry relies on. A quarry with one bench and one crew can keep the level and face in a notebook until a second bench opens.

FAQ

Frequently asked questions

Can one bench hold several months of work?

Yes. The bench stays open while face remains, and each month gets its own area figure for comparison. Old blasts stay tied to it. A finished cut means the bench is marked closed by the manager, and it stays in the history.

Does a blast need a bench before it is logged?

The blast row names its bench, so the bench is chosen first. Open it in the plan before the shot. Later, yield is read bench by bench, and every blast sits under the right face.

Can the plan show which bench gave sound blocks?

It groups blocks cut and graded against each bench, because every block carries its source. Grouping is the plan’s job. Judging stays with the inspector. Soundness still depends on the grade and reason an inspector records on the day.

Who keeps the bench list up to date?

The manager, or a person the manager names. GullySystem staff can also add a bench or rename one on request. Crews only pick from the list, so spellings stay consistent from one shift to the next.

Do we need survey drawings to use the plan?

No. It asks for a name, a level, a face and the area opened. Survey drawings stay with whoever produces them. Keep the drawings where they are, and use the plan for daily work at the face.

Where it fits

How this feature fits the system.

Granite and Stone Quarry Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Block register

Each squared block holds its own number, three measurements, volume and source bench, so a buyer’s query is traced to the face it came from.

Batch and Serial Tracking

Grading and inspection notes

The inspector records the grade, the reason and a photograph against the block, so a disputed grade is reviewed against the notes made that day.

Quality Control

Machine hours and maintenance

Rigs, wire saws, loaders and the crusher each carry hour readings, service intervals, wire and bit changes and breakdown history.

Asset AMC Tracking
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.