Skip to main content
GullySystem

Numbered block register for stone quarries

The block register gives every squared block its own number and keeps its length, width, height, computed volume, colour and source bench. The cutter’s crew is noted at the same entry. Buyers pick from this list. No block depends on paint on the stone any longer.

What each block row keeps in the register

Each squared block is one row. The row is made when the block is cut. It stays with the stone until it leaves. Whatever a buyer’s agent, an inspector or the accounts office asks about a block is answered from this row.

Number as painted on stone

Your yard’s own numbering is kept. Staff set the pattern at the start, with the prefix and the running count. The same number is on the stone and on the screen, so a supervisor can match them at a glance.

Length, width and height

Three measurements are entered for every block. The register then computes the volume itself. A buyer who asks for a block of a stated size gets a figure that comes from the entered measurements, not from a guess.

Colour and source bench

Colour is picked from your own list of colour names, and the source bench is picked from the bench plan. Both go on the row. That pair is what a buyer asks about first and what a quarry must prove.

Cutter’s crew on the entry

The crew that cut the block is noted at the same entry. Nothing extra is typed later. If a run of blocks comes out cracked, the manager can see which crew and which bench they share.

A block from cutting to the buyer’s trailer

A squared block passes through several hands before it leaves the gate. Each adds one fact to the same row. Follow one block through a working week and the register fills in, without anyone writing a second list on a separate sheet.

Cutting crew squares a block

When a block comes off the saw, the crew or the supervisor measures it and opens a row. Three figures and a colour go in. Its number is fixed there, and the paint follows the screen.

Inspector grades and places it

The inspector opens the row, picks a grade and a reason, and adds photographs. From there it moves on to a yard bay. Grading has its own page. Its row is this one, with a place in the yard.

Agent browses the list

A buyer’s agent asks for a colour and a size. The supervisor filters the register and reads out matching blocks with their numbers. The agent picks. Nobody walks every bay, and no colour is described from memory.

Weighbridge prints the numbers

When the trailer is weighed out, the ticket and delivery note list the block numbers picked. The accounts clerk raises the invoice from that dispatch. Stock shows the block as gone. The dispatch sits beside it.

Who opens the block register and why

Four of the five product roles open the register in a normal week. Their purposes differ. Each opens the same row. Here is what each person looks for when the block list is on the screen.

For yard supervisors and inspectors

They number, measure and grade blocks, place them in bays, and answer a buyer’s agent from the register. This is their main screen. Any block missing from it needs a check, and that check is quick.

For quarry managers

Managers read blocks cut by bench, grade and colour with total volume. They compare one bench with another. Low output from a face shows up as a short list, which prompts a question at the next review.

For the quarry owner

The owner reads blocks cut, blocks sold and the stock that remains unsold. There is no need to call the yard. Stone that has lain unsold for a long time is easy to spot, oldest first.

For weighbridge and accounts staff

They pick the sold blocks by number when a trailer is weighed out. The ticket carries the numbers on to the delivery note and the invoice. Nobody retypes a list at the gate. The invoice agrees with the load.

Decisions to settle before blocks are numbered

Block numbers are hard to change once they are painted on stone and quoted to buyers. Settle the four points below with the yard supervisor before the first row is made. GullySystem staff then set the register to match.

Who may edit a block row

Decide who can change a measurement or a number after the row is saved. A supervisor may fix a typing slip. A changed number is a bigger matter. Name the person who approves it, and write the name down.

What the register leaves out for block register

This entry holds measurements, volume, colour, bench and crew. It does not carry a price list. Buyer terms stay out too, and the manager says where they live. Decide which of those belong in the order and invoice records instead.

How existing blocks come across

Your block register arrives from spreadsheets or notebooks before go-live. The yard supervisor then checks a sample of block numbers against the stone lying in the yard. Any pattern of errors is fixed before launch.

The report to read first for block register

Pick blocks cut by bench, grade and colour with total volume, or yard stock with unsold blocks oldest first. The first suits a young face. The second suits a yard that already holds stone to clear.

How the block register connects to other records

Here the product turns on one record. Blasts and benches feed it from one side. Grading, bays, orders and invoices read from it on the other. If a number is wrong here, every later record repeats the mistake, which is why the links below matter.

  • Bench and face plan supplies the source bench for each row
  • Grading and inspection notes add the grade, reason and photograph
  • Yard bays and crushed stone stock shows where each block lies
  • Buyer orders and dispatch picks blocks by number for a trailer
  • Invoices and receipts bills the dispatched blocks to the buyer

Where the block register stops

This record describes a block. It does not cut one, price one or decide that the stone is sound. Measuring stays a task for the yard, and the figures are only as good as the tape or gauge used. Pricing, buyer terms and tax questions stay with the owner and the accountant. A small yard with a handful of blocks can paint numbers and keep a notebook.

FAQ

Frequently asked questions

Can our own numbering system be used?

The numbering your yard paints on stone goes in first. Screen and stone then read alike. Staff set it up with the prefix and the running count your yard uses.

Is the volume typed in or worked out?

Volume is worked out for you. You enter length, width and height, and the figure follows. That removes a column of sums from the yard and from the office. A wrong tape reading still gives a wrong figure, so measure with care.

Can a buyer’s agent search the list by colour?

Each row holds a colour, so a filter by colour and size lists matching blocks. The supervisor reads the numbers and bays aloud. The agent chooses without walking the rows of the yard, and the choice is saved for the order.

What happens when a block is sold?

A buyer picks it by number on an order, and it is weighed out on a trailer and shown on the delivery note. The block is then marked dispatched. Its history stays for later queries.

Can an old paper register be loaded?

Spreadsheet sheets and notebooks are keyed in or scanned before go-live. A supervisor checks sample numbers against the yard. Mistakes found there are fixed first. Then the quarry starts on the new list, with the paper books kept as a backup.

Where it fits

How this feature fits the system.

Granite and Stone Quarry Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Block register

Each squared block holds its own number, three measurements, volume and source bench, so a buyer’s query is traced to the face it came from.

Batch and Serial Tracking

Grading and inspection notes

The inspector records the grade, the reason and a photograph against the block, so a disputed grade is reviewed against the notes made that day.

Quality Control

Machine hours and maintenance

Rigs, wire saws, loaders and the crusher each carry hour readings, service intervals, wire and bit changes and breakdown history.

Asset AMC Tracking
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements