Crews and shifts for stone quarries
Crews and shifts records who worked in the drill, cutting, loading and crusher crews, and where they were put to work. Attendance, the bench or shift and the wages and advances that follow all come from one record. The pay sheet is no longer separate arithmetic. Entry happens once.
What the crew and shift record keeps
A quarry runs on small crews with different jobs. Each crew has its own people, its own place of work and its own pay. The entries below tie those three together. Attendance is entered once and used for every purpose.
A shift roll from first call to pay day
The foremen carry the phones. Entries are quick and made on the spot, at the face or at the crusher. The moments below show where the crew record is touched during a working week, and by whom. Nobody needs a desk to do it.
Who marks, who assigns and who pays
Crews are people, so this record needs honest entries from several roles. Each role below touches a different part. The split keeps the person who marks attendance apart from the person who pays. That is deliberate.
Decisions to settle before crews are recorded
Labour records are personal and carry money. Rules about who may see and change them matter early. Agree the four points below with the owner, the manager and accounts. GullySystem staff then set up the crews and the rates.
How crews connect to benches, machines and cost
A crew record gains meaning when it meets the work. Benches say where the crew worked. Machines say what it used. Cost reports say what it cost. The bullets below name those links. They show where attendance is read again by other features, so nothing is typed twice.
- Bench and face plan receives the bench each crew is posted to
- Block register notes the crew that cut each squared block
- Drilling and blasting log names the drill crew on each shot
- Machine hours and maintenance shows who ran each rig and saw
- Haulage, loading and diesel sets labour beside fuel in cost
Where crew records stop
This feature notes attendance, placements, wages and advances as your quarry sets them. It is not a full payroll service, and it does not decide pay rates, deductions or what the law requires for workers. Those stay with the owner and the adviser. A quarry with a handful of permanent workers can keep a muster roll on paper.
Frequently asked questions
Can wages be computed without a separate sheet?
Wages come from the attendance record and the rates your quarry sets. Advances are taken off the same record. The result is a figure to check. It is not a final payment. Your adviser decides what else applies.
Which crews can be tracked?
Drill, cutting, loading and crusher crews are the crews the product names. Each is marked and assigned the same way. Another crew type can be raised with GullySystem staff at the first workshop, if you need one.
Does a crew belong to one bench only?
A crew is assigned to a bench or a shift, and the assignment can change. Moving a crew midweek is a quick edit. Each day keeps its own placement. Output can then be read per bench.
Where is an advance recorded?
Each advance is entered against the worker with its date and amount. It then reduces the wages computed for the period. The running balance of advances can be read whenever the owner wants it. Reading it takes seconds.
Does it handle statutory wage deductions?
Statutory rules differ by place. The product leaves them to you. Your owner and adviser confirm what applies. Whatever deductions your own staff specify are what the pay sheet reflects. Nothing is added by the product on its own.
How this feature fits the system.
Granite and Stone Quarry Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Block register
Each squared block holds its own number, three measurements, volume and source bench, so a buyer’s query is traced to the face it came from.
Batch and Serial TrackingGrading and inspection notes
The inspector records the grade, the reason and a photograph against the block, so a disputed grade is reviewed against the notes made that day.
Quality ControlMachine hours and maintenance
Rigs, wire saws, loaders and the crusher each carry hour readings, service intervals, wire and bit changes and breakdown history.
Asset AMC TrackingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements