Reports and dashboards for mining operations
Reports and dashboards show output, machine availability, cost per tonne moved and stock on the ground for each site. Every figure is built from entries your team already makes at the face, the gate and the store. Nobody compiles a separate workbook to find out how the pit did.
What the mining reports are built from
A report is only a way of reading entries back. Nothing here is typed in again. The figures come from trips, hours, fuel issues, tickets and jobs made as the work happens. The four items below name the main views.
How a manager reads the pit in a week
A dashboard is only worth opening if it answers the question in front of the reader today. Four ordinary questions from a manager’s week show how the views are used in practice. Each answer rests on entries made on site.
Who reads which view
Everyone sees figures that came from their own crews, cut for the job they do. Owners read across sites. Supervisors read their own shift. The office reads money. Each person gets one useful screen to start from.
Reporting decisions to settle before launch
Reports are cheaper to shape early than to rebuild after habits form. Meet the owner and the manager before launch. Do it early. It takes one sitting. Decide which views matter, who sees what and how far back the figures go.
How reports join every other feature
Reports hold no data of their own. Each one reads what another feature recorded, so a figure is only as good as the entry behind it. These are the main sources, and what each one adds to the dashboard. Five are named below, each with one line on what it supplies.
- Shift output and haul log supplies trips, loads and delays
- Equipment register and hours supplies machine hours and availability
- Fuel, spares and store supplies diesel and spares by machine
- Weighbridge and dispatch supplies tickets and stock leaving piles
- Invoices, receipts and buyer balances supplies what buyers owe
Where reports and dashboards stop
Reports show what your team entered. They cannot repair a missing entry or judge a decision for you. They are not forecasts, and they do not replace mine planning or geological modelling, which stay with specialist software. Figures for the accounts and for tax belong to your accountant. A single-machine quarry may need only a notebook.
Frequently asked questions
Can I compare two pits on cost per tonne?
Yes, cost per tonne moved is read for each site and shown together. Site entries feed it, from diesel to tonnes. Each figure traces back to an entry made at the face, the gate or the store.
Do I need a separate tool to build reports?
You do not build one. The views come from entries already made at the face, the gate and the store. When a report needs changing, our staff make the edit. Nobody on your team maintains a report tool.
How current are the figures on the dashboard?
Figures follow entries as soon as they are saved. A site without signal enters them once it is back in range. Totals catch up then. A late entry therefore shows late, and then corrects the totals.
Which reports come with the product?
Output by site, shift, material and grade. Machine hours, availability and downtime. Diesel and spares by machine. Maintenance jobs and services due. Tickets by buyer and material. Contractor bills checked. Buyer balances and licence renewals due.
Can machine availability be read per site?
Availability and downtime are shown by machine and by site. A loader under repair appears with the job behind it. Foreman and manager read the same figure. They do not argue over two different counts.
How this feature fits the system.
Mining Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Equipment register and hours
Each loader, truck, drill and crusher is held with its operator, hours and service due date, so planners see what is available.
Fixed Asset RegisterMaintenance and breakdown jobs
A job card records the fault, the mechanic, parts fitted and hours spent, and the repair history stays with that machine.
Job CardsFuel, spares and store
Diesel, tyres, bits and lubricants are booked in and issued against a machine, and an alert shows when a fast-moving spare falls low.
Stock Tracking and AlertsTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements