Reports and dashboards for mining operations

Reports and dashboards show output, machine availability, cost per tonne moved and stock on the ground for each site. Every figure is built from entries your team already makes at the face, the gate and the store. Nobody compiles a separate workbook to find out how the pit did.

What the mining reports are built from

A report is only a way of reading entries back. Nothing here is typed in again. The figures come from trips, hours, fuel issues, tickets and jobs made as the work happens. The four items below name the main views.

Output by site, shift and grade

Output is read by site, by shift, by material and by grade. Night shift sits against day shift. Compare them on one bench. The totals come from haul entries, so they match what the crews recorded on the day.

Machine hours and availability

Each machine’s hours, availability and downtime are shown. A loader under repair appears as downtime, with the jobs behind it. The workshop foreman sees where machines are lost. So does the manager, on the same screen.

Cost per tonne moved

Diesel and spares issued by machine are set beside hours and tonnes. Cost per tonne moved is then read for each pit. Set one pit against another in a single view. The gap is traced to its causes.

Stock, buyers and licences

Stock on the ground by pile and grade has its own view. So do weighbridge tickets by buyer and material, and buyer balances. Each is short. Licence renewals due and contractor bills checked are listed as well, for the office.

How a manager reads the pit in a week

A dashboard is only worth opening if it answers the question in front of the reader today. Four ordinary questions from a manager’s week show how the views are used in practice. Each answer rests on entries made on site.

Monday review of the week gone

The manager opens output by site and shift for the past week. One bench fell short. Following it down shows trips, delays and a loader under repair. The cause is found in minutes, not at a long meeting.

Midweek check on machine cost

An older dumper looks costly. Its hours, diesel issued and repair jobs are read against tonnes moved. The numbers either support a replacement or show the machine is not the problem. Either answer helps the manager decide.

Before quoting a large buyer

A buyer asks for a large order of one grade. Stock on the ground by pile tells the manager whether it can be met. The buyer’s balance is read in the same sitting. Then the promise is made.

A meeting with the owner

The owner asks how each pit is doing. The answer is a screen showing output, availability and cost per tonne for each site, side by side. It rests on entries made on site, not on a spoken summary at the end of the month.

Who reads which view

Everyone sees figures that came from their own crews, cut for the job they do. Owners read across sites. Supervisors read their own shift. The office reads money. Each person gets one useful screen to start from.

For owners and managers

Owners see output, equipment availability, fuel use, contractor cost and buyer balances by site and by period. They compare pits on cost per tonne moved. Nothing needs asking for. It is already on the screen.

For shift supervisors

Supervisors see which machines are working, waiting or under repair, and what their shift has moved. Handover notes sit beside the figures. The next supervisor starts from the same numbers. Nothing is retold by word of mouth.

For mechanics and storekeepers

Mechanics see maintenance jobs open and services due. Storekeepers see diesel and spares issued by machine. Each reads a list that matches the work in front of them, with no extra tidying up needed by anyone.

For the mine office and accounts

The office sees weighbridge tickets by buyer and material. It also sees contractor orders and bills checked, buyer balances and licence renewals due. These lists drive the day’s billing and chasing. They agree with the entries.

Reporting decisions to settle before launch

Reports are cheaper to shape early than to rebuild after habits form. Meet the owner and the manager before launch. Do it early. It takes one sitting. Decide which views matter, who sees what and how far back the figures go.

Who sees which figures for Reports and dashboards

Decide whether supervisors see cost per tonne or only output. Decide which sites each manager may open. Some owners keep cost and balances to themselves. Settle it once, and the screens follow without further setup.

What is left out at first

Skip views nobody will read. A short set used every week beats a long one used by nobody. More can be added once the first set is trusted, and the office knows where each figure comes from.

How earlier figures come across for Reports and dashboards

Past output and balances can be loaded from your sheets so comparisons have history. Choose the starting date together with the manager. The site clerk reads over what is loaded before anyone relies on it.

Which report is read first for Reports and dashboards

Pick one, perhaps output by site and shift. Check a week of it against the paper count sheets. When the two agree, trust it. Then bring in machine availability and cost per tonne, one at a time.

How reports join every other feature

Reports hold no data of their own. Each one reads what another feature recorded, so a figure is only as good as the entry behind it. These are the main sources, and what each one adds to the dashboard. Five are named below, each with one line on what it supplies.

  • Shift output and haul log supplies trips, loads and delays
  • Equipment register and hours supplies machine hours and availability
  • Fuel, spares and store supplies diesel and spares by machine
  • Weighbridge and dispatch supplies tickets and stock leaving piles
  • Invoices, receipts and buyer balances supplies what buyers owe

Where reports and dashboards stop

Reports show what your team entered. They cannot repair a missing entry or judge a decision for you. They are not forecasts, and they do not replace mine planning or geological modelling, which stay with specialist software. Figures for the accounts and for tax belong to your accountant. A single-machine quarry may need only a notebook.

FAQ

Frequently asked questions

Can I compare two pits on cost per tonne?

Yes, cost per tonne moved is read for each site and shown together. Site entries feed it, from diesel to tonnes. Each figure traces back to an entry made at the face, the gate or the store.

Do I need a separate tool to build reports?

You do not build one. The views come from entries already made at the face, the gate and the store. When a report needs changing, our staff make the edit. Nobody on your team maintains a report tool.

How current are the figures on the dashboard?

Figures follow entries as soon as they are saved. A site without signal enters them once it is back in range. Totals catch up then. A late entry therefore shows late, and then corrects the totals.

Which reports come with the product?

Output by site, shift, material and grade. Machine hours, availability and downtime. Diesel and spares by machine. Maintenance jobs and services due. Tickets by buyer and material. Contractor bills checked. Buyer balances and licence renewals due.

Can machine availability be read per site?

Availability and downtime are shown by machine and by site. A loader under repair appears with the job behind it. Foreman and manager read the same figure. They do not argue over two different counts.

Where it fits

How this feature fits the system.

Mining Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Equipment register and hours

Each loader, truck, drill and crusher is held with its operator, hours and service due date, so planners see what is available.

Fixed Asset Register

Maintenance and breakdown jobs

A job card records the fault, the mechanic, parts fitted and hours spent, and the repair history stays with that machine.

Job Cards

Fuel, spares and store

Diesel, tyres, bits and lubricants are booked in and issued against a machine, and an alert shows when a fast-moving spare falls low.

Stock Tracking and Alerts
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements