Skip to main content
GullySystem

Design files and revisions for orthotics labs

Design files and revisions keep the STL scan, the edited CAD model and the milled version together with each order in an orthotics laboratory. A revision trail shows which file reached the CNC mill and who approved it. Designers, technicians and the order desk read one trail, and nothing is overwritten.

What the design file record holds

Every device has three kinds of file, and the record keeps them side by side on the order. The scan is the starting point, the model is the work and the milled version is the result.

The raw STL scan

The scan as it left the scanner or the clinic is stored untouched. It is the evidence of the foot’s shape. When a question arises about a shape, the designer starts here, not from a copy that someone edited.

The edited CAD model

Each edit of the shell is saved as a numbered revision, with its arch fill, heel cup depth and posting. Earlier versions remain. A designer can compare revision two with revision four without asking anyone for a lost file.

The milled version

What went to the CNC mill is recorded as the milled version, marked on the revision it came from. Mill and blank are named. If a Pelite blank comes off too narrow, the file behind it is known.

Approval and who gave it

Each revision shows whether it is approved for the mill and by whom. Only the approved revision is flagged. The flag carries a date, so a technician reading the trail sees the decision, not a rumour.

A working week of scans, models and mill runs

Design files are touched mainly by the people who shape and release them, but the desk, the owner and the bench read the trail too. Four moments from a working week show how the record behaves. Each is an ordinary task.

Monday: a scan comes in

A podiatrist sends an STL scan through the portal. It attaches to the order by itself. The technician opens it, checks that the heel and forefoot are complete and notes the result on the record.

Tuesday: a designer revises

A designer deepens a heel cup after the podiatrist asks for more control. The change is saved as a new revision with a note. Revision one stays exactly as it was. Both can be opened side by side.

Wednesday: release to the mill

The technician reviews the latest revision, marks it approved and sends it on. The trail now records the revision, the person and the mill queue it joined. The operator mills the approved file. Nothing else is sent.

Thursday: a blank comes off narrow

A milled Pelite blank is narrower than the prescription. The owner opens the trail. Its first line names the revision that fed the mill, so the team works out whether the model or the machine was wrong.

Who opens design files and what each sees

Files are the heaviest technical records in the product, so roles matter here. The laboratory decides who may save, who may approve and who may only look. Each role below reads the same trail. Only the seat differs.

For owners and managers

Owners read the trail when a remake is under discussion. They see which revision was milled, who approved it and the number of earlier revisions. Opening the model is not needed. The process speaks for itself.

For the order desk

Order desk staff see whether a scan has arrived and whether a model is approved. When a podiatrist asks about progress, the answer comes from the design status. Editing a model is not their job.

For designers and technicians

Designers save revisions and write notes. Technicians check scans and mark a revision approved. Every earlier version stays visible beside the current one. Rework starts from facts instead of a remembered folder name, and no one hunts through drives.

For bench and finishing staff

Bench staff see which revision was milled for the order in front of them. A wrong-looking shell can be traced. At heat forming or grinding, they can tell the designer exactly which file produced it.

Decisions to settle before design files are stored

Scans and models are large and personal to a patient, so a few decisions are worth settling early. GullySystem enters the answers when it builds your configuration. The owner can change them later. Four are listed below.

Who may approve for the mill

Name the people allowed to mark a revision approved. A technician is a sensible choice. Decide whether the designer who made the revision may also approve it, or whether a second person must check it first.

What is kept or dropped

Decide how long working revisions are kept and which interim files are not worth storing. The rule is yours and your adviser’s. The approved and milled versions are the ones to keep with the order, since they explain the finished device.

How old files come across

Existing scans and models sit in folders today. Agree which are brought across, such as those for live orders, and how the rest are archived. Bring a few sample scan files to the first meeting. They show GullySystem the formats.

Which report matters first for Design files and revisions

Choose a first view. Devices on the line by stage and mill queue suits a technician who plans the mill. Remakes by reason and device type suits an owner studying how a shell misses the fit.

How design files link to milling and remakes

The revision trail is read by nearly every later step. The bill of materials, the planning screen and the remake log all point back to a specific file. A design record that stood alone would be a drawer of files. This one is wired to the order.

  • Prescription orders supply the scan, side and posture
  • Device specifications decide the blank the mill receives
  • Production planning slots the approved model into the mill queue
  • Production work orders show which revision was milled
  • Remakes cite the revision behind the first device

Where design files stop in this product

The product stores and tracks files. It is not a CAD package, so shaping a model still happens in your design software, and the mill’s toolpath still comes from its own controller. Clinical choices stay with the podiatrist. Retention periods are for the owner and an adviser. A single designer with a handful of orders can keep tidy folders.

FAQ

Frequently asked questions

Can we store files from any scanner?

The record holds STL scans and the CAD and milled files your team already makes. Name the formats at set-up. GullySystem confirms them. Anything the laboratory files by hand today can be attached to the order instead.

What does a revision trail actually show?

It lists each saved revision with its date, the person who saved it and any note. It marks the revision approved for the mill and who approved it. A technician reads it top to bottom.

Can a designer overwrite an earlier model?

No, a saved change becomes a new revision. Earlier ones stay in the trail, which is how a lost or wrong file is avoided. Removal of old revisions is a decision for the owner, not the designer.

How do we know which file fed the CNC mill?

The released file is marked as the milled version on its revision, with the mill and blank named. Open the order and the answer is there. No one has to ask the operator to remember.

Where do clinics’ own scan files go?

Scans a podiatrist uploads through the clinic portal attach to the order they belong to. Staff see them arrive, and the designer opens them from the same order. Clinics see only their own patients’ devices.

Where it fits

How this feature fits the system.

Orthotics Manufacturing Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Clinic accounts and price lists

Each clinic and podiatrist is a separate record, so a device is billed to the right account at that clinic’s agreed price.

Contact & Account Management

Prescription orders

Every prescription becomes a numbered order from receipt to dispatch, with scans and clinical notes attached and its status visible to the order desk.

Order Management

Device specifications and bills of materials

Each device type lists its blank, sheet, cover, strap and adhesive quantities, so a work order reserves the right material without retyping.

Bill of Materials
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements