Skip to main content
GullySystem

Bills of materials and device specifications in orthotics

Device specifications and bills of materials define each orthotic device once, with its blank, sheet gauge, top cover, strap and finishing steps. When an order is confirmed, the work order reserves the right stock from that definition. Technicians, the store and the owner read the same list, and nobody retypes a materials list.

What each orthotic device specification lists

A specification is a recipe. It belongs to one device type, so a heat-moulded insole, a knee brace and an ankle-foot orthosis each carry their own. It names the materials and the steps, and every work order copies it. Change it once and later orders follow.

Blank and sheet gauge

The specification names the EVA blank grade or the polypropylene sheet gauge the device is built from, with the piece to cut or mill. A Pelite blank and a Plastazote blank are separate lines. Gauge is stated, not remembered.

Top cover, strap and adhesive

Covers, Velcro straps and adhesives sit on the list with the quantity one device uses. A pair of insoles might take a length of grey top cover. The quantity is a planning figure. Actual use is posted on the work order.

Finishing steps and stages

Each device lists its steps after the blank, from milling and vacuum forming through lamination, grinding and finishing. Steps differ by device. An insole needs no strapping, while a knee brace does. The work order takes its stages from here.

When a device changes

A new blank grade or a different top cover is a change to the specification, made once and dated. Orders raised afterwards use it. Whether an order already on the bench keeps the old list or moves to the new one is the owner’s call.

A week of bills of materials in the workshop

Specifications work quietly and are noticed when missing. Four ordinary moments show where a bill of materials saves a conversation. Each sits at a different point between the order desk, the store and the bench, and each starts from the same list.

Monday: a work order reserves stock

An approved knee brace order becomes a work order. The bill of materials reserves polypropylene sheet, straps and cover from the store. No one types a list. The reservation shows against the rack count that afternoon, before anything is cut.

Tuesday: the store picks

The storekeeper opens the day’s reservations and picks sheet, straps and top cover for each order. Pieces are issued against the work order, so the stock count moves with the pick. Nothing leaves the shelf unrecorded.

Wednesday: a designer changes a blank

A designer finds that a firmer EVA blank suits a runner’s insole better. One edit is made. Orders raised from that day use the new blank, and the store sees the change before it picks.

Thursday: a cost check

Owners compare the sheet and cover issued with what the specification planned for a device type. A gap points to offcuts, a spoiled cut or a wrong grade. Planned figures never rely on memory. The check is quick.

Who relies on the bill of materials

A materials list is read at three or four desks and benches, and each reader wants a different slice. GullySystem sets the views at configuration. The four below follow the roles on the product page.

For owners and managers

Owners compare planned materials with sheet, blank and cover issued against each order. The variance is a cost question, not a quarrel. A device type that always overruns is a specification to review. A single order is a story.

For designers and technicians

Designers and technicians write the specification. They choose the blank, the gauge and the finishing steps for a device type, and revise them as the bench learns. Each change is theirs to propose. Approval sits with the owner or a lead.

For bench and finishing staff

Bench staff read the list on the work order to see which blank, sheet and cover to pick up. They need not search for a materials sheet. Offcuts and adhesive used are written against the same lines.

For store and purchasing

The store sees what each work order has reserved and what is still to be issued. When a rack runs low, purchasing raises a supplier order. Counts match the shelf. Every issue was booked to a specification.

Decisions to settle before specifications are keyed

GullySystem enters the device range first. Every work order depends on it. A little thinking about the four points below saves rework later. Bring the device list and a few finished examples to the first meeting.

Who may edit a specification

Decide who can add a device type or change a blank grade. GullySystem staff can build new types when asked. Within the laboratory, limit edits to a lead technician or the owner, so a casual change cannot alter every later order.

Small items left off the list

A smear of adhesive or a few grams of filler may not be worth a line. Decide which consumables are listed and which are written off as workshop supplies. The accountant should agree the rule.

How the device range is entered

The device range, blank grades, sheet gauges and finishing steps are keyed in first, mirroring how an insole or brace is built on your bench. Bring one finished device of each type. It proves the list.

Which report matters first for device specifications and bills of materials

Sheet, blank and cover issued against each order is the first report for a specification. It shows whether the list matches reality. Read it for a few weeks before tightening any quantity, because early weeks include learning waste.

How bills of materials feed stock and production

The bill of materials sits between the order and the shelf. Several later features read it. It turns a device type into reserved stock, hands its stages to the work order, and gives the owner a plan. The bench is measured against that plan, line by line.

  • Prescription orders pick the device type that selects the list
  • Material stock and batches supply the items and lot numbers
  • Production work orders copy stages and quantities from it
  • Purchasing from material suppliers reorders what the lists consume
  • Remakes record extra sheet used against the original list

Where specifications stop in an orthotics workshop

A specification records how the laboratory chooses to build a device. It does not price the device. Prices sit on each clinic’s account. Whether a build is clinically right is for the podiatrist, and the accountant decides how material cost is treated in the books. A workshop making one device type from one blank can keep a laminated card instead.

FAQ

Frequently asked questions

Can one device type use two different blanks?

A device type holds one list. Where a clinic wants a different blank for the same insole, set it up as a separate device type. That keeps orders and reports clean. GullySystem staff add types when asked.

Do offcuts change the bill of materials?

Planned quantity sits on the list. Bench staff enter offcuts on the work order, so the issued figure can differ from the plan. That gap is the owner’s study. The list itself does not change on its own.

Can strap sizes and cover colours be specified?

Specify the strap and the cover as stock items, such as a grey top cover or a Velcro strap size, each with its own line. A different colour is a different item. The work order reserves whichever the list names.

What happens to open orders when a specification changes?

That is the owner’s decision at set-up. An order already reserved may keep its first list or be moved to the new one by the store. Settle the rule before the first change is made.

Do standard supports need a bill of materials too?

They carry a list too. Standard supports are made to a stock level and share the production plan. Their stock is reserved and reordered in the same way, from the same material records, whether the support is custom or off the shelf.

Where it fits

How this feature fits the system.

Orthotics Manufacturing Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Clinic accounts and price lists

Each clinic and podiatrist is a separate record, so a device is billed to the right account at that clinic’s agreed price.

Contact & Account Management

Prescription orders

Every prescription becomes a numbered order from receipt to dispatch, with scans and clinical notes attached and its status visible to the order desk.

Order Management

Device specifications and bills of materials

Each device type lists its blank, sheet, cover, strap and adhesive quantities, so a work order reserves the right material without retyping.

Bill of Materials
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements