Skip to main content
GullySystem

Work orders from design to finishing in orthotics

Production work orders carry one orthotic device through the bench from design to finishing. Staff tick each stage and enter hours, offcuts and the adhesive batch used. The order desk reads the stage from the screen, and the owner watches cost build while the work proceeds instead of at the end.

What a work order records for each device

A work order is raised for one device, not for a clinic or a day. It starts from the prescription and the specification. Then it collects what actually happens at the bench, stage by stage. Four kinds of fact build up on it.

Stages from design to finishing

Stages run from design through milling, heat forming, lamination and grinding to finishing, as set for your mill, oven and benches. Each is ticked by name. A knee brace follows a different list from an insole.

Hours at each stage

Staff enter the hours spent at each stage. A designer’s time lands on design and a grinder’s on grinding. Hours post straight to the order. Labour cost for that device is known by the time it leaves.

Offcuts and sheet used

The sheet, blank and cover actually used are entered with the offcuts left over. A cut that went wrong is recorded as it was. The gap between planned and used explains a high material cost. Nothing is guessed.

Adhesive batch and lot numbers

The adhesive batch is written on the order. Lot numbers follow for materials that must be traced to a supplier, such as a sheet or a blank. If a batch is questioned later, a search lists the devices that used it.

A working week on the orthotics bench

The work order is lived in at the bench, between the mill, the oven and the grinder. Each day below shows a moment that once needed a whiteboard, a paper slip or a shout across the workshop. Now the order carries it. Four days follow.

Monday: the day’s list

Bench staff open the day’s work orders on a screen. Each shows the device, the side and the stage waiting. A shell milled on Friday is marked ready for heat forming. No paper slip travels with it.

Tuesday: the oven stage

A technician vacuum forms a polypropylene shell and ticks heat forming. Bench time and the polypropylene sheet piece are entered against the order. Lamination now shows ready on the list. The next person sees it at once.

Wednesday: a ruined cut

A top cover is trimmed badly and a second piece is cut. Both pieces and the offcut are entered. The order then shows the extra material. The cost of that device is true, not hopeful.

Thursday: a status call

A podiatrist asks whether a patient’s brace has left the oven queue. Order desk staff open the work order and read the stage and the hours so far on the screen. The call ends in one lookup.

Who ticks and who reads a work order

The bench writes a work order, and everyone else reads it. The laboratory decides who may tick, who may correct and who may only look. Each view below is a role’s own.

For owners and managers

Owners watch devices on the line by stage, orders running late and material cost against billing. A delay shows before the clinic phones. No floor walk is needed. One screen tells them where each device sits.

For the order desk

Order desk staff read the stage of every device without leaving the screen. They answer status calls from clinics and tell one when a missing scan holds its order. Work at the bench goes on undisturbed.

For bench and finishing staff

Bench and finishing staff see the day’s work orders, tick each stage and record the sheet, cover and adhesive used against each device. Hours go straight to the order. There is no slip to lose.

For store and purchasing

The store sees what each work order has drawn and what is still reserved. Issues made to the order update stock as they happen. A low rack prompts a supplier order. Work at the bench never stops.

Decisions to settle before work orders go live

Work orders are the busiest records in the product. A few decisions are worth making early. GullySystem builds your stages and matches them to your mill, oven and benches. The four questions below shape that build.

Who may reopen a stage

Decide who can untick a stage or correct hours after the bench has moved on to the next device. A supervisor is a sensible limit. Corrections should leave a trace. An edited figure then never surprises the owner.

What the bench does not record

Pick what stays out of the order. Recording every minute of idle time is rarely worth the typing. Hours and offcuts are enough for costing, and a short note covers the odd event, such as a power cut.

How live devices come across

Devices still on the milling queue are carried over when the system starts. Choose a cut-off day. Each device in progress gets a work order, and the supervisor confirms every stage against the bench before the first tick is made.

Which report matters first for production work orders

Start with devices on the line by stage, mill queue and oven queue. It replaces the whiteboard and asks nothing new of the bench. Add sheet issued against each order once stage ticking is routine. Keep the start small.

How work orders connect to the whole device record

A work order borrows from earlier features and gives to later ones. It starts from a prescription and a specification, draws stock from the store and ends at a fitting check. Along the way it builds the cost of one device. That cost reaches the owner.

  • Prescription orders create it with side, size and notes
  • Device specifications give its stages and planned quantities
  • Production planning slots it into mill and oven weeks
  • Material stock and batches take the issues and lot numbers
  • Fitting checks close it before dispatch and invoicing

Where work orders stop in this product

Work orders record the bench. They do not run a machine, and the mill’s own controller still holds its toolpath. Hours are posted for costing, not for pay, so wages and attendance stay with payroll or the accountant. How overhead is treated is the accountant’s call. A technician making a few insoles a week can write the day in a notebook.

FAQ

Frequently asked questions

Is there one work order per pair or per foot?

Each device has its own work order. You decide at set-up how a pair is treated, so bring examples of both a pair of insoles and a single brace. GullySystem then sets the rule once for the whole bench.

Can bench staff enter data on a shared screen?

Yes, if the workshop has a screen at the bench. Each person ticks their own stage. Time is posted to the order as the stage is ticked, so no paper slip needs carrying back to an office.

What if a stage is skipped for a simple insole?

Stages come from the specification, so a simple insole can leave lamination off its list. Where a stage is skipped for one order, the supervisor writes the reason on it. The record shows what actually happened.

How does cost build as work proceeds?

Each issue of sheet, blank or cover posts material to the order, and each stage posts hours. The running figure moves with the bench. Overhead and pricing are separate matters for the owner and the accountant.

Can a work order show the adhesive batch later?

The batch stays on the order. It is entered at the stage that used it. If a supplier raises a concern, a search by batch lists the devices that used it. Dispatch records then show where each went.

Where it fits

How this feature fits the system.

Orthotics Manufacturing Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Clinic accounts and price lists

Each clinic and podiatrist is a separate record, so a device is billed to the right account at that clinic’s agreed price.

Contact & Account Management

Prescription orders

Every prescription becomes a numbered order from receipt to dispatch, with scans and clinical notes attached and its status visible to the order desk.

Order Management

Device specifications and bills of materials

Each device type lists its blank, sheet, cover, strap and adhesive quantities, so a work order reserves the right material without retyping.

Bill of Materials
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements