Skip to main content
GullySystem

Views by Role for Pest Control Teams

Owners, the scheduling desk, technicians and accounts each work in their own area of the same customer record. Each sees the part that concerns them.

One record, four seats

Pest control work passes between the office and the field. The scheduling desk plans the day, technicians treat on site, accounts bill the work and the owner watches the whole. One customer record serves all four, so nothing is retyped between them.

What each role sees

For owners

Renewals coming up, completed visits against plan, dues, chemical use and sources of enquiry.

For the scheduling desk

Due visits, technician runs, urgent calls, leave and the status of every open job.

For technicians

Today’s run, the site’s history, the closing screen and their own payslips.

For accounts

Billing for each visit or contract, receipts, dues and the figures payroll needs.

A contract through four seats

  • The enquiry is logged as a lead and an inspection is booked
  • The AMC is saved and its visits are laid out from the start date
  • Due visits are grouped by area and assigned to technicians
  • The technician closes the service report on site with photos and the customer’s sign-off
  • Accounts bill the visit as the contract specifies
  • The AMC appears on the renewal list before its end date

Why separate views help the field

A technician with a phone and a lot of screens gets lost. Showing the technician only today’s run, the customer’s history and the closing form means fewer taps and fewer wrong entries. Keeping pricing, payroll and other people’s pay out of the technician’s view also keeps staff relations calm. The same logic applies at the office. A desk coordinator needs the whole schedule and customer phone numbers but has little use for the chemical purchase rates.

Businesses the system suits

It suits pest control companies with a growing book of residential and commercial AMCs, and operators serving hotels, restaurants, hospitals and food plants. A one-man operator with a notebook gains less than a firm with several technicians and a desk.

What the client decides

Which screens and figures each person sees is agreed during implementation. The scheduling desk is trained on planning, and technicians are trained to close reports on site.

Starting with fewer screens

A new system tempts the owner to switch on every feature on day one. The team copes better with less. Start the technicians with the run list and the closing form. Give the desk the schedule and the due list. Give accounts billing and dues. Add reports and extras after a month, when the basics are habit. A short first phase also shows where the roles need adjusting, such as a supervisor who needs to see two areas instead of one.

Questions before fixing the role list

  • How many seats the firm has today and how many it expects in a year
  • Whether supervisors see all technicians or only their own area
  • Whether branch managers see another branch’s numbers
  • Who may change prices, rates and contract dates

Four seats on one working day

The same customer record is opened by the owner, the desk, the technician and the accounts person on one day, each seeing a different slice. This is how a single AMC customer looks from each seat in turn. Each seat sees only what it needs.

Desk books the visit

On that screen, the scheduling desk opens the customer, sees the contract and picks a free technician. It does not see the invoice history. The booking is made from what the desk needs to know. The desk works with less clutter.

Technician opens the job

On the phone the technician sees the address, the treatment and the visit notes from last time. The price and the dues are not shown. Attention stays on the work to be done. Focus stays on the treatment.

Accounts raises the invoice

The accounts person sees the visit marked done and prepares the invoice. Chemical details are hidden, since they do not matter to billing. A payment received is entered against the same customer. Billing needs none of the chemical detail.

Owner reads the whole picture

In real use, the owner opens the same customer and sees the contract, the visits, the invoice and the dues together. A question about whether the customer is worth keeping can be answered in one sitting. Judgements about a customer need the whole page.

Deciding who sees what before roles are fixed

Roles are fixed once and then forgotten, so the first decision matters. The owner lists the seats, the screens each one needs and the screens each one should never see. A single page of notes is enough. Keep the notes to one page.

Which seats exist

List the roles that really exist in the firm, such as owner, desk, technician, storekeeper and accounts. A role invented for one person soon grows stale. Add one only when a real job needs it. Roles should match real jobs.

What a technician must not see

Prices, margins and other customers’ details stay hidden from the technician’s phone. Decide the exact list. A phone lost in a train should reveal only that day’s runs. Nothing else travels with the technician in a pocket.

Who may edit across seats

Decide which role may change a customer’s phone number or address. If everyone can, errors multiply. Allow the desk to edit and the others to flag a mistake. Allow the desk to edit while other roles flag mistakes through a simple note.

How people move between roles

Then, a technician who becomes a supervisor needs a new seat but keeps their history. Settle how that change is made and who approves it, before the first promotion happens. Agree the steps with the owner first.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

What each role sees

Can you explain the balance from its original documents?

Select a partly settled example in “What each role sees”. Ask for the invoice, allocated receipts and remaining balance to be shown together before agreeing the opening figures.

Background reading: ERPNext: outstanding invoices

A contract through four seats

What proves that a planned task was actually completed?

Select an overdue entry in “A contract through four seats”. Ask which work record closes it and what remains visible when the visit is postponed or only part of the job is done.

Background reading: ERPNext: maintenance plans

FAQ

Frequently asked questions

Do technicians install anything on their phones?

Whether technicians open the system in a phone browser or through an installed app is agreed during scoping, to suit the devices they already carry.

Can the owner see more than one branch?

Yes. The owner can read across branches, while a branch manager sees only that branch.

What does the scheduling desk see when an urgent call arrives?

The desk sees which technicians have room left in their runs, and adds the job to the nearest one.

Can accounts see which customers owe money?

Yes. Dues by customer, oldest first, are part of the accounts view.

Can a technician see another technician’s jobs?

Only if the firm decides so. A technician is shown their own run and the sites on it.

What happens when a staff member changes role?

Access is changed by the office. The history of what was done stays under the name.

Where it fits

How this feature fits the system.

Pest Control Business Management System: the parts that work with this feature, the trades that use it and the ways to put it in place.

AMC contracts and renewals

Each annual contract stores its services, visit frequency, terms and end date, and a renewal list appears ahead of lapse.

AMC and Service Contracts

Technician dispatch and routes

Dispatchers assign jobs to technicians by area and group them into a route, and any change is pushed to the technician’s phone.

Technician Scheduling

Service reports and work orders

Every visit has a work order that the technician closes with the treatment given, chemicals used, photos and the customer’s sign-off.

Service Reports and Proof of Visit
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements