Toy assembly line counts and short parts

Each assembly line enters its finished toys by the hour on a tablet. When a line stops, the missing screw, wheel or decal is named, and rework is counted apart from good output. Planners see which items are short of one part, and supervisors see what the next shift must chase.

Hourly output, short parts and rework on a line

An assembly line works on one item at a time. Each hour has a count. The record notes the item, the line and the crew, then the pieces that came off finished and good. It also notes why the line stood still.

Finished pieces per hour

Pieces finished are entered for each hour, against the item and the line, by the supervisor on the tablet. Hourly figures add up to the shift output. A slow hour shows while the shift can still catch up.

The short screw or wheel

If a line stops for want of a part, the supervisor names it: a screw, a wheel, an axle or a decal. The stop is dated and tied to the item. Short parts are listed by line.

Good output and rework counts

Rework has its own count. A toy sent back to be reopened and refitted, such as one with a loose wheel, is not good output until it passes again. Totals for good output stay honest.

Line, crew and tree revision

Each entry names the line, the crew, the item and the tree revision in use. Changeovers between items are logged. A line that ran two toys in one shift shows two runs, each with its own count.

One line, one blister pack, one missing wheel

Line 2 has just made its hourly entry. The count is good, but the wheel bin is nearly empty and the next hour will be thin. The record is how that news reaches the planner and the store. Nobody walks across the floor.

The hourly entry on the tablet

At the end of each hour the supervisor taps in the finished toys and the rework pile. The entry is brief. The line carries on while the figures reach the planner’s screen and the owner’s.

The wheel bin runs dry

The line stops for want of wheels. The supervisor picks the wheel from the short list, noting the item and the time. The store sees it and the planner sees it. A purchase request follows if stock cannot cover.

Rework after a torque failure

One toy fails a torque check at the end of the line, and the quality desk enters the result. It is entered as rework with the cause and returns to the bench. Good output waits for it to pass.

The planner reads the lines

The planner opens the line view before the next shift. The lines on plan stay as booked, and one line is short of a decal sheet for its item. The item moves to another line.

Supervisor, planner and owner read the line differently

Assembly is where every earlier delay turns up as a missing part. The people around it need different views. One needs the hourly count and another needs only the short list.

For line supervisors on tablets

Supervisors enter hourly counts, rework and the short part on a tablet at the line. They see the item, the revision and the parts the line should hold. A wrong decal sheet is spotted early.

For planners moving items between lines

Planners read hourly output against the buyer’s order and see which short parts are holding which lines. With a line short of a part, the item can move to another. Spare line time shows in the same view.

For the quality desk checking rework

The quality desk reads rework by cause, line and item, week on week. A rising count on one line is checked at the bench before more toys are built. Failed samples link back to the line.

For factory owners watching shortages

Owners see the items in assembly and which of them are short of one part. They read which screws, wheels and decals hold lines up, ranked by the stops they cause. Supplier calls start from those names.

Assembly count rules to fix before go-live

A line count is only useful if two supervisors would record the same thing. Fix what counts as finished, as rework and as a stop. Walk through it at the line.

Finished: at the bench or boxed

Finished can mean off the bench, sealed in its blister pack or cleared at the line check by the supervisor. Choose one point for every line. Mixed points make the totals disagree between lines and between shifts.

Short part: pick from the tree

A short part can be picked from the item tree or typed in freely by the supervisor. A pick list keeps names clean. Free text is faster at the tablet but splits one part into several spellings.

Who sends a toy for rework

Rework needs an owner. Decide whether the supervisor, the quality desk or both may send a toy back to the bench. Say also where pieces are counted once they pass again, as good or as rework.

Hourly entry or shift total

Hourly entries show a stall while it happens, not after. A shift total is lighter on the supervisor. Choose hourly for lines that stop and start and shift totals for steady ones, line by line.

Counts handed on to test, pack and plan

Assembly takes in moulded, decorated and bought out parts and hands finished toys on to test and packing. Its counts decide what can ship, and its short parts decide what is bought next. The feature sits in the middle of the product. Every other feature touches it.

  • Item trees and revisions list the screws, wheels and decals
  • Paint and decoration passes supply decorated parts to the line
  • Soft toy cutting and sewing supplies stuffed shells to assembly
  • Sample tests and holds take samples from finished output
  • Buyer orders and carton packing count good output into cartons

Limits of assembly line counts

Line counts record output and shortages. They do not time a job, set a target or judge a worker’s pace. Targets, standard times and incentive schemes stay with the owner and the supervisors. Entries come from people at the tablet, not from sensors on the line. A bench with one assembler and one toy can use a clipboard.

FAQ

Frequently asked questions

Can a line run two items in one shift?

Each item run is entered separately, with its own line, crew and counts. The changeover is logged between them. Totals for one item stay clear of the other, even when both ran in a shift.

What if the missing part is bought out?

A bought out part such as a button cell is named like any other short part. The stop links to the tree line for that part and the supplier shown there. A purchase request can follow from it.

How do we count a toy reworked twice?

Each trip back to the bench is entered as rework, with its cause and the line that built the toy. It joins good output only when it passes. Repeat trips for one fault are easy to spot.

Can we compare lines against each other?

Output, rework and short parts are listed by line, item and shift, for any dates you choose. One line can be set beside another. A stalled line is easy to spot. Reasons for a difference stay with the supervisors.

Does the count come from the line or the tablet?

Counts come from the supervisor’s entry on the tablet, shift by shift. The system does not read the line itself. A scanner link would be separate work, discussed before set-up. Quality staff can see who entered each figure.

Where it fits

How this feature fits the system.

Toy Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Item trees and revisions

Every toy is held as a tree of moulded, soft and bought out parts with its artwork revision, so the line builds from the current list.

Bill of Materials

Resin and masterbatch lots

Granule and colour lots are received with a number and linked forward to the moulded batches that consumed them.

Batch and Serial Tracking

Season capacity view

Open orders are laid against press, decoration and assembly capacity, and shared mould clashes appear before a schedule is released.

Production Planning
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements