Paint and pad printing passes for toys
A toy with a painted face, a printed logo or a decal passes through decoration more than once. This feature logs each spray and pad printing pass against the batch, with the paint lot used and the rejects for colour or registration. A repaint is then planned from the record, not from memory.
Paint lots, passes and rejects on each batch
A spray painted face and a pad printed logo are two separate passes on one moulded part. Every pass has its own paint lot, its own operator and its own rejects. The record keeps the passes apart, so a fault can be pinned to one of them. No pass hides behind another.
Red gloss from the tin to the tray
Decoration is the stage where a good moulded part can still be lost to the wrong shade. Colour can drift. A print slips and a whole tray goes back. A day on the line shows where the record catches it.
Who sees paint, print and reject counts
Decoration touches several desks, and each asks a different question of the same batch record. Where is the paint? Which pieces failed, and what is out with the spray unit? When can the repaint run?
Decoration settings to agree before the first batch
Decoration records get messy when the vocabulary is loose. One person’s colour fault is another’s shade difference. Settle the terms with the line and the quality desk before the first batch is logged.
How decoration hands parts to assembly and test
Decoration sits between the press and the line, so it takes from one and hands to the other. Moulded batches arrive with their lots. Decorated batches leave with theirs, plus a reject count the planner can use.
- Moulding shift sheets supply the moulded batch each pass starts from
- Resin and masterbatch lots carry colour through to the decorated batch
- Assembly line counts show which decorated part ran short
- Sample tests and holds name the decoration batch under test
- Season capacity view reads pad printing capacity from booked passes
Limits of paint and pad printing records
This feature notes what was applied and what failed. Judging the result is left to people. It does not mix paint, match a Pantone shade by eye or decide whether a print will satisfy a buyer. Those judgements stay with the line and the quality desk. Rules on paint chemistry and toy safety stay with your adviser and the supplier. A workshop that decorates one toy by hand can use a tally sheet.
Frequently asked questions
Can one paint lot serve several toys?
A paint lot is received once and drawn on by any batch that needs it. Every pass names the lot. One tin of red gloss can be followed through a car body and a figure’s face.
How is a decal pass different from pad printing?
A decal pass is logged the same way as a print, with the pieces put through. It adds the sticker sheet revision from the item tree, so the line applies the sheet in force. Registration rejects are entered the same way.
Can we plan a repaint from the rejects?
Rejects for colour and registration are listed by batch and pass, with the cause given. The planner picks the trays to go back and books each on the plan. The booking stays a human choice.
What happens when an outside unit returns short?
The return is entered against the delivery note, and the shortfall shows beside the count sent, with the date. The note stays open and ages on the owner’s list. Chasing the unit stays with your team.
Does it measure colour against a Pantone reference?
Shade is judged by people at the quality desk, not measured by the system. The result is entered as pass or reject with a cause. Everyone compares to one reference. The Pantone reference sits on the lot and the item.
How this feature fits the system.
Toy Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Item trees and revisions
Every toy is held as a tree of moulded, soft and bought out parts with its artwork revision, so the line builds from the current list.
Bill of MaterialsResin and masterbatch lots
Granule and colour lots are received with a number and linked forward to the moulded batches that consumed them.
Batch and Serial TrackingSeason capacity view
Open orders are laid against press, decoration and assembly capacity, and shared mould clashes appear before a schedule is released.
Production PlanningTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements