Skip to main content
GullySystem

Paint and pad printing passes for toys

A toy with a painted face, a printed logo or a decal passes through decoration more than once. This feature logs each spray and pad printing pass against the batch, with the paint lot used and the rejects for colour or registration. A repaint is then planned from the record, not from memory.

Paint lots, passes and rejects on each batch

A spray painted face and a pad printed logo are two separate passes on one moulded part. Every pass has its own paint lot, its own operator and its own rejects. The record keeps the passes apart, so a fault can be pinned to one of them. No pass hides behind another.

Paint lot and colour reference

Each paint lot is received with its colour name, supplier, quantity and a Pantone reference where the buyer gives one. Spray paint and pad ink sit on separate lines. A pass later names the lot it used.

Pad printing and spray passes

Each pass is logged against a moulded batch with the method, operator, date and pieces put through. Passes keep their order. A face is sprayed before its logo is printed, and the record shows it.

Rejects for colour and registration

A rejected piece is entered as a colour fault, a registration fault or another cause, with the count and the pass that made it. Registration means the print sits off its mark. The cause shapes the repaint plan.

Parts out with spray units

Parts sent to an outside spray unit leave on a delivery note with the count sent and the date out. The return is entered against that note. A short return shows at receipt, not when assembly runs dry.

Red gloss from the tin to the tray

Decoration is the stage where a good moulded part can still be lost to the wrong shade. Colour can drift. A print slips and a whole tray goes back. A day on the line shows where the record catches it.

A paint lot arrives

Lot P-0412, red gloss, is received at the store and entered with its colour reference and the supplier’s name. The decoration supervisor sees it on the plan. The planner knows what paint is ready to spray.

Spray passes on the car bodies

The sprayer opens the batch of car bodies, picks the paint lot and logs the pieces put through. At the end of the shift the colour rejects are entered. Both counts stay on the batch.

Pad printing the logo

On the next pass the pad printer logs the logo on the same bodies, naming the ink lot used. A drifting print shows as registration rejects. The supervisor adjusts the fixture before another tray is wasted.

Planning the repaint

At the end of the week the planner reads the rejects by batch. Colour faults go back for a respray. Registration faults return to pad printing, and each repaint takes its own slot on the plan.

Who sees paint, print and reject counts

Decoration touches several desks, and each asks a different question of the same batch record. Where is the paint? Which pieces failed, and what is out with the spray unit? When can the repaint run?

For planners booking repaints

Planners see rejects by pass and batch, then place a repaint on the plan next to the pad printing capacity. Paint stock is read against the passes already booked on each line. A shortage shows before the line sits idle.

For supervisors at the pad printer

Supervisors log passes and rejects on the tablet at the line as trays leave the printer. They pick the paint or ink lot from the stock list. The next pass opens on the same batch.

For the quality desk grading colour

The quality desk enters colour and registration rejects against the pass that made them. It reads rejects by paint lot to spot a bad tin before more trays are sprayed. A bad lot is raised with the supplier.

For factory owners tracking outside units

Owners see which parts are out with spray and embroidery units, listed by delivery note and by age. Old delivery notes stand out. A short return is chased while the unit still has the job.

Decoration settings to agree before the first batch

Decoration records get messy when the vocabulary is loose. One person’s colour fault is another’s shade difference. Settle the terms with the line and the quality desk before the first batch is logged.

Reject causes the line may pick

Choose the causes an operator can pick, such as wrong shade, thin coverage, runs and misregistered print. A list that is too long gets skipped. Agree the wording with the quality desk so reports read alike.

Counting passes by tray or piece

A tray can hold a set of small parts such as wheels or faces at the printer. Decide whether a pass is logged per tray or per piece. Per tray is quicker. Per piece makes rejects exact.

Repaints: new batch or same batch

A repainted tray can keep its batch number or take a new one. A new number keeps first and second pass rejects apart. The old number keeps the whole history in one place. Pick one rule for all toys.

Paint lots at outside spray units

An outside unit may spray with paint you supply or paint it buys for the job. Decide who enters its lots. Without a lot number, a colour query on those parts has no trail to follow.

How decoration hands parts to assembly and test

Decoration sits between the press and the line, so it takes from one and hands to the other. Moulded batches arrive with their lots. Decorated batches leave with theirs, plus a reject count the planner can use.

  • Moulding shift sheets supply the moulded batch each pass starts from
  • Resin and masterbatch lots carry colour through to the decorated batch
  • Assembly line counts show which decorated part ran short
  • Sample tests and holds name the decoration batch under test
  • Season capacity view reads pad printing capacity from booked passes

Limits of paint and pad printing records

This feature notes what was applied and what failed. Judging the result is left to people. It does not mix paint, match a Pantone shade by eye or decide whether a print will satisfy a buyer. Those judgements stay with the line and the quality desk. Rules on paint chemistry and toy safety stay with your adviser and the supplier. A workshop that decorates one toy by hand can use a tally sheet.

FAQ

Frequently asked questions

Can one paint lot serve several toys?

A paint lot is received once and drawn on by any batch that needs it. Every pass names the lot. One tin of red gloss can be followed through a car body and a figure’s face.

How is a decal pass different from pad printing?

A decal pass is logged the same way as a print, with the pieces put through. It adds the sticker sheet revision from the item tree, so the line applies the sheet in force. Registration rejects are entered the same way.

Can we plan a repaint from the rejects?

Rejects for colour and registration are listed by batch and pass, with the cause given. The planner picks the trays to go back and books each on the plan. The booking stays a human choice.

What happens when an outside unit returns short?

The return is entered against the delivery note, and the shortfall shows beside the count sent, with the date. The note stays open and ages on the owner’s list. Chasing the unit stays with your team.

Does it measure colour against a Pantone reference?

Shade is judged by people at the quality desk, not measured by the system. The result is entered as pass or reject with a cause. Everyone compares to one reference. The Pantone reference sits on the lot and the item.

Where it fits

How this feature fits the system.

Toy Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Item trees and revisions

Every toy is held as a tree of moulded, soft and bought out parts with its artwork revision, so the line builds from the current list.

Bill of Materials

Resin and masterbatch lots

Granule and colour lots are received with a number and linked forward to the moulded batches that consumed them.

Batch and Serial Tracking

Season capacity view

Open orders are laid against press, decoration and assembly capacity, and shared mould clashes appear before a schedule is released.

Production Planning
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements