Skip to main content
GullySystem

Season capacity view for toy factories

Before a Christmas schedule is issued, the planner lays every open order against press, pad printing and assembly capacity. Shared moulds are highlighted, so two items that want one tool during the same week show as a clash on screen, not on the floor. Owners see which orders to accept, move or refuse.

Orders, capacity and shared tools on one view

This view is built from records the factory keeps anyway. Orders bring quantity and ship window. Item trees bring the mould, the decoration and the assembly line each item needs. Capacity figures for each press and line are entered by the planner, as the plant really runs.

Open orders week by week

Each open order line is placed in the weeks before its ship window, by item and quantity, from the order record. Lines for one buyer sit together. A late confirmation moves the line along with its window.

Press capacity by mould and colour

Press time is laid out by press, mould and colour, with hopper dryer time noted beside each run. A mould near service shows less capacity. Colour changes cost time on the plan, and the plan shows it.

Pad printing and assembly load

Pad printing passes and assembly hours are laid against the capacity of each machine and line. A decoration step that holds up a whole season of orders is visible. So is spare time on a line.

Shared moulds highlighted

A mould that serves several items is highlighted wherever it appears in the season’s plan. It marks each week in which two items want the same tool, with both buyers named. Clashes show before the schedule is issued.

Planning the Christmas season, order by order

Orders for a Christmas range arrive one at a time, and each looks reasonable on its own when it is accepted. Together they want the same wheel mould and the same pad printing line during the same week. It puts them side by side.

A new order is tried first

Before confirming a buyer, the planner enters the lines and looks at the weeks they need. A tight week shows against press, pad printing and assembly load at a glance. The buyer’s reply waits for the screen.

Two items want one mould

Here the wheel mould is highlighted, wanted by two toy cars in the same week. The planner moves one car earlier and checks that both ship windows still hold. No press time is lost. The clash is settled on paper first.

The toolroom needs a tool

The toolroom books a shared mould for its ejector pin service in the middle of the season. That mould then shows no capacity for the service week, for every item that uses it. Others are booked around it.

A late, large order arrives

A buyer asks to add a large order late in the season. The owner reads the view with the planner and sees which existing orders would slip. The reply is a decision, not a hope.

Planners, toolroom and owners read one view

Capacity is argued over in meetings when each person holds a different sheet or spreadsheet. With one view, the talk moves to what to do. Each role starts from its own slice.

For planners issuing the schedule

Planners lay open orders against press, pad printing and assembly capacity and read the clashes. They move items or ask the owner. The schedule goes out once the clashes are settled and the dates agreed.

For toolroom staff booking service

Toolroom staff see the weeks in which each shared mould is busy and the weeks when it is free. They book polishing or repair in a gap. The service week is then shown to the planner.

For factory owners accepting orders

Owners see whether a new order fits the season before the plant accepts it, not after. They see which buyers would be touched. A refusal or a later window is chosen with the facts in view.

For supervisors reading line load

Supervisors read the press and assembly load for each line and each week ahead of the season. A heavy week is known well in advance. Crew rosters and overtime talks with the crews start before it arrives.

Capacity rules to agree before the first schedule

A capacity view is only as honest as the figures behind it. Agree what a press week, a pad printing week and an assembly week really hold. Last season’s experience is the guide.

Working hours counted per press

A press may run extra shifts in season and fewer outside it. Decide the working hours counted for each press and line, week by week, with the planner and supervisors. Holiday weeks need their own entry.

Time set aside for colour changes

Each colour change costs time on a press. Decide whether the view sets time aside for it or leaves it to the planner. Setting time aside keeps the plan honest but needs a figure to start from.

Firm orders versus enquiries

Some enquiries come long before any firm order. Decide whether enquiries sit on the view or only confirmed orders do. A mixed view misleads unless the two are clearly marked apart, so the planner is not planning on hope.

Shared moulds worth highlighting

Only a few moulds decide the whole season. Choose with the toolroom which are highlighted, such as the eight cavity tools used by dozens of items. A long list of highlights hides the clashes that matter to the season.

The view reads from orders, moulds and lines

Capacity needs three inputs. These are what is ordered, what each tool can still do and what each line has really made. Orders, the mould register and the shift and line records feed them in. Then it hands a schedule to the desks that follow it.

  • Buyer orders and carton packing supply quantities and ship windows
  • Mould and cavity register supplies service dates and live cavities
  • Moulding shift sheets show how fast presses really ran
  • Assembly line counts show the real hourly output of each line
  • Item trees and revisions name the mould and parts each item needs

Limits of the season capacity view

The view shows where orders collide. It does not choose between them, optimise a schedule or promise that a plan will hold. Choosing which buyer waits stays with the owner and the planner. Its figures are only as good as the hours and speeds entered. A plant with a few items and spare presses can plan on a wall chart.

FAQ

Frequently asked questions

Can the view show a single mould’s load?

Each mould can be opened to show the items that want it, week by week. Its service dates sit on the same page. Where one tool carries too much of the season is plain to the planner.

How are changes to orders reflected in the view?

A changed quantity or ship window updates the order line, and the view redraws from that line, so no separate sheet is re-entered. Nothing is copied. A new clash or a cleared one shows to the planner at once.

Does it schedule the presses by itself?

It highlights clashes and shows the load. It does not assign runs by itself. The planner decides what moves, and the chosen schedule is then issued to the press hall, the pad printing line and assembly.

What capacity figures do we need to supply?

Hours for each press, pad printing line and assembly line, week by week, with holiday weeks marked by the planner. Cavity counts and service intervals already sit on the mould register. Speeds come from your own records.

Can we compare last season with this one?

Earlier orders, packed cartons and shift output stay on file with their dates. A planner can set last season’s load beside this season’s orders. The comparison informs the capacity figures but does not set them. The figures stay yours.

Where it fits

How this feature fits the system.

Toy Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Item trees and revisions

Every toy is held as a tree of moulded, soft and bought out parts with its artwork revision, so the line builds from the current list.

Bill of Materials

Resin and masterbatch lots

Granule and colour lots are received with a number and linked forward to the moulded batches that consumed them.

Batch and Serial Tracking

Season capacity view

Open orders are laid against press, decoration and assembly capacity, and shared mould clashes appear before a schedule is released.

Production Planning
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.