Toy item trees with colour and artwork revisions
An item tree lists every part that goes into one toy: moulded pieces, plush shells, screws, button cells, decals and the blister card. Colour variants and the artwork revision in force sit on the same tree. Planners, toolroom staff and assembly supervisors all build from the current list, not from an old copy.
The parts, variants and revisions a toy tree holds
A toy is never one thing. A toy car has a moulded body, four wheels, an axle, a decal sheet and a blister card, and a teal version changes some of them. Each of these gets its own line on the tree.
When a buyer sends new artwork for the car
Revisions reach a toy factory by email from a buyer, a designer or the toolroom, and each lands on a different desk. The tree gives them one place to settle. A changed blister card shows how a week goes with it in use.
Each desk reads a different cut of the tree
One record serves every desk. A planner, a toolroom clerk and a line supervisor each want something different from the same toy. Each is shown the part that bears on the work in hand.
Revision rules to agree before trees go live
A tree serves the line only when everyone reads it the same way. Edits, variants, retired parts and packaging need an answer from planners and the toolroom. Agree them before loading begins.
Where the tree feeds the rest of the factory
The item tree is the starting record, and other features read from it. A change here reaches the lots, the line and the carton without anyone retyping a part number or a colour code. Colour lots and carton cards both follow the revision in force. Each hand-off is a reference, not a copy.
- Resin and masterbatch lots take material and colour from variants
- Mould and cavity register links each moulded part to its tool
- Assembly line counts check the short screw or wheel against it
- Sample tests and holds attach results to the revision tested
- Buyer orders and carton packing pick the blister card revision
Limits of an item tree in a toy factory
Item trees describe how a toy is built. It does not design the toy, draw the artwork or approve a change for the buyer. Those decisions stay with the designer and the buyer’s team. It does not judge whether a finished toy meets a safety rule. A factory making one simple toy in one colour can keep a printed parts list on the wall.
Frequently asked questions
Can one tree hold a plush toy and its box?
A plush tree works the same way. It lists the shell panels, the fibre fill, a sewn label and the box, each as a line. Parts sent to an embroidery or stuffing unit are marked as outside work.
What happens to a tree after a revision?
The earlier revision stays on file with its start and end dates. A carton packed last season can still be traced to the card and sticker sheet it carried. New runs read only the revision in force.
Can a colour variant share parts with the original?
A part common to both colours appears once on the shared tree. Only the body, masterbatch or decal that differs sits on the variant branch, so the tree stays readable. A shared screw is amended once.
Where do button cells and circuit boards go?
They are listed as bought out parts on the tree, each with its own line and quantity per toy. Receipt lots and any functional check are recorded against them. An electronic toy reads like a plain one.
Who edits trees when a buyer changes artwork?
Your planners amend trees as they hold them today, using the same item codes. Where the structure of a tree or a test step needs to change, GullySystem staff make that change when asked. The choice is yours.
How this feature fits the system.
Toy Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Item trees and revisions
Every toy is held as a tree of moulded, soft and bought out parts with its artwork revision, so the line builds from the current list.
Bill of MaterialsResin and masterbatch lots
Granule and colour lots are received with a number and linked forward to the moulded batches that consumed them.
Batch and Serial TrackingSeason capacity view
Open orders are laid against press, decoration and assembly capacity, and shared mould clashes appear before a schedule is released.
Production PlanningTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements