Moulding shift sheets for toy presses
A shift sheet opens for each press run against the item and the mould. Operators record shots, flash, short shots, sink marks and rejects by cavity on a tablet. The shot weight is compared with the standard for the item. The run closes with a good count that the next stage can trust.
Shots, defects and weights on a press sheet
One sheet covers one press and one shift. It names the item, the mould, the colour and the granule and masterbatch lots in the hopper. Then it collects what the press made, entry by entry, until the shift closes and a good count is struck.
Press 4, second shift, a run of wheels
At the start of the second shift a supervisor takes over Press 4 with the wheel mould still running. The sheet for the new shift opens on the same run. The hand-over is a screen. No one has to catch the old supervisor at the gate.
What each reader takes from a press sheet
A press sheet is written by one person and read by several people across the plant. The operator types and the supervisor confirms. Planner, toolroom and owner each read a different total from it.
Press sheet choices to settle before the first shift
A sheet that asks too much goes unfilled, and one that asks too little proves nothing. Choose what the operator types and when. Do it with the supervisors who will fill the tablet.
Press sheets feeding lots, tools, tests and orders
The shift sheet is where the moulding data is born. Lots, tools and items are chosen on it. Counts leave it for planning, decoration and quality. What the operator types here is read in several other places. Getting it right once pays off at each of them.
- Mould and cavity register receives shots and defects by cavity
- Resin and masterbatch lots are picked from stock for each run
- Item trees and revisions supply the standard shot weight
- Paint and decoration passes start from the good count
- Season capacity view reads press hours from run history
Limits of the moulding shift sheet
This record notes what the press made and what the operator saw. It does not set machine parameters, tune a press or work out why a cavity is short. Those remain with the supervisor and the toolroom. It does not read the machine itself. A single press making one part can run on a paper log.
Frequently asked questions
Can the sheet cover a mould change mid-shift?
A mould change closes the first run and opens a second on the same sheet and press. Each run keeps its own item, mould, lots and counts. The changeover time is logged with the reason.
What if shot weight drifts but rejects are zero?
A light or heavy sample is entered and shown against the standard for the item, even when no piece has been rejected. A supervisor decides whether to adjust. Weight drift is a warning, not a reject.
Do operators need a tablet at every press?
Entry is on a tablet at the line, and a tablet can be shared. A supervisor may hold one for a bay of presses and enter counts for each operator. The plant decides the number it buys.
Can past sheets be compared by mould?
Shots and rejects are listed by mould, cavity and shift for any date range you choose. One tool is read across presses. A cavity that gives more flash on one press than another stands out.
Can operators correct a wrong entry later?
A correction is made on the sheet and carries the name of the person who made it. Whether operators or only supervisors may correct is agreed before set-up.
How this feature fits the system.
Toy Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Item trees and revisions
Every toy is held as a tree of moulded, soft and bought out parts with its artwork revision, so the line builds from the current list.
Bill of MaterialsResin and masterbatch lots
Granule and colour lots are received with a number and linked forward to the moulded batches that consumed them.
Batch and Serial TrackingSeason capacity view
Open orders are laid against press, decoration and assembly capacity, and shared mould clashes appear before a schedule is released.
Production PlanningTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements