Toy sample tests, lot holds and reports
Every lot of toys can carry its sample tests. Drop, pull, torque and small part cylinder results are entered against the lot. A failed sample places the lot on hold, and the passing report travels with the shipment. The quality desk and the buyer’s inspector read the same record.
Sample results, hold status and reports on a lot
Each test record belongs to a lot, not to a day in a shared folder. It names the lot, the item and the revision, then the test, the sample size and the result for each test. One lot number opens it all.
From a failed pull test to a released lot
A failed pull test changes what happens next. The record is built to make that change obvious to planning and packing alike.
Who enters, holds and reads sample results
A sample result matters to people who never touch the sample or the test rig. The tester enters it. The quality desk acts on it, and planning, packing and the owner live with the outcome.
Rules for tests and holds before the first lot
Holds are strong actions. Settle which tests apply to which items, how large each sample is and who may hold or release a lot. Do this with the quality desk and the buyer’s inspector.
From a failed sample to packing and shipment
A result is only useful if it can stop a carton. Holds travel to packing and orders, and reports travel with the shipment. Results also look back to the assembly line, the moulded batch and the lots behind it. A fault can be followed to its source.
- Buyer orders and carton packing block cartons from a held lot
- Assembly line counts supply the finished output that is sampled
- Resin and masterbatch lots link a failure to its material
- Moulding shift sheets show which press made the failed parts
- Item trees and revisions fix the version that was tested
Limits of sample tests and holds
The record stores results and holds lots. It does not test a toy, certify a toy or say whether a result meets a standard such as EN 71. That judgement stays with the quality desk, your laboratory and the buyer. Reports from an outside laboratory can be kept with the lot. A tiny run of one item can use a paper test sheet.
Frequently asked questions
Can results from an outside laboratory be kept?
A report from an outside laboratory is filed against the lot like an in-house result. Quality staff enter the verdict and keep the document with the shipment for later. Laboratory fees stay outside this record.
Can a hold be placed on part of a lot?
Holds can cover the whole lot or chosen cartons, following the rule set for that test and item. Cartons outside the hold move on to packing. Each carton shows its own status, so packing staff know which are free.
How does the buyer’s inspector get a report?
Reports are printed from the lot, with each test, sample size, result and the date of each. It can go by email or be printed for the shipment file. Sending it is a manual step.
What if a test step is added later?
A new step is added to the item’s test list by GullySystem staff when asked. Lots tested earlier keep the steps they had at the time. Old reports do not change. A past shipment still shows what was done.
Does a hold stop the lot being shipped?
While a lot is on hold, its cartons cannot be released for packing or shipment. The status must change first, with a named person and a reason entered by the quality desk. Release is a recorded act. Packing staff see the hold on their screen.
How this feature fits the system.
Toy Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Item trees and revisions
Every toy is held as a tree of moulded, soft and bought out parts with its artwork revision, so the line builds from the current list.
Bill of MaterialsResin and masterbatch lots
Granule and colour lots are received with a number and linked forward to the moulded batches that consumed them.
Batch and Serial TrackingSeason capacity view
Open orders are laid against press, decoration and assembly capacity, and shared mould clashes appear before a schedule is released.
Production PlanningTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements