Soft toy cutting, sewing and stuffing records
A plush toy starts as a roll of fabric. This feature follows the roll through cutting, the panels through sewing and the shells through embroidery or stuffing units, with fibre fill weight noted. Supervisors and planners see where the pieces are and which count has gone short.
Fabric rolls, cut panels and fill weights
Every plush toy begins as a roll. The cutter lays out the pattern, the panels are bundled and the sewers turn them into shells. Each step has a count. The records keep those counts side by side so a gap shows.
A bear from roll to stuffing unit
A bear moves through cutting, sewing, embroidery and stuffing before it is packed. Some of those steps sit with outside units, and the pieces leave and return on delivery notes. Each step is followed, in and out. One bear shows how.
Who sees which count in the soft toy plant
Cutters, sewing supervisors and planners rarely stand in one room at the same time. Each reads the count that matters to the work in hand. The numbers are the same.
Soft toy counts to agree before sewing starts
Plush work runs on bundles. Before the first roll is entered, choose what a bundle is, how it is counted and who may open or split one. Let the sewing lines have a say.
From cutting table to buyer carton
Soft toys share the factory with moulded ones, and the same features carry them forward. The shell count feeds assembly and packing, the fill weight reaches the tests and the order sees what is ready. Outside units are tracked as parts out. Plush and plastic meet in the carton.
- Item trees and revisions list plush shells and their fabrics
- Assembly line counts receive stuffed shells alongside moulded parts
- Sample tests and holds record results against the plush lot
- Buyer orders and carton packing count plush toys into cartons
- Season capacity view lays plush orders against assembly capacity
Limits of cutting and sewing records
The records count pieces and weigh fill. They do not draw patterns, set piece rates or pay sewers. Fabric needs per order are worked out by your planners, not by the system. A small sewing room making a few plush lines can use a tally book.
Frequently asked questions
Can offcuts and cutting rejects be counted?
Cutting rejects are counted against the roll and the pattern, so a flawed roll stands out when the next order is planned. Offcut weight can be added if the cutting room wants it. Both are optional.
How are pieces sent for embroidery tracked?
A delivery note lists the item, the count sent and the date out. The return is entered against the note. Any shortfall is flagged. Overdue notes rise to the top of the owner’s list, so the unit is chased first.
Is stuffing fibre issued and counted like other stock?
Stuffing fibre is issued to the stuffing line with its weight and noted against the toy lot. Fibre stock falls with each issue. The planner sees when a purchase request is due, before the line runs dry.
Can sewers be paid by pieces from this record?
Shells sewn by line and shift come straight from the record, and payroll staff can read those counts. Piece rates and wages are worked out in your payroll process, not here. An accounting export carries the counts across.
What if one bundle holds two colours?
A bundle is tied to one roll and one colour, which keeps shade differences visible. A mixed set is split into two bundles at the table, each with its own number and roll. Each shell’s shade can then be traced.
How this feature fits the system.
Toy Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Item trees and revisions
Every toy is held as a tree of moulded, soft and bought out parts with its artwork revision, so the line builds from the current list.
Bill of MaterialsResin and masterbatch lots
Granule and colour lots are received with a number and linked forward to the moulded batches that consumed them.
Batch and Serial TrackingSeason capacity view
Open orders are laid against press, decoration and assembly capacity, and shared mould clashes appear before a schedule is released.
Production PlanningTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements