Toy mould and cavity register
The register replaces the card hung on each tool. It holds shot counts by cavity, blocked cavities, polishing dates and the next ejector pin service due for every toy mould. Planners book presses against the tool as it stands today, and toolroom staff book repairs before a mould reaches its limit.
Tool numbers, cavities and service dates on file
Each tool gets one page. A toy mould carries a history that a hanging card holds only in part. The page lists every cavity and dates each shot count, block and repair. The planner reads what the tool can do now.
A press plan that respects the tool’s condition
A planner is about to book the wheel mould for a long run on Press 4. Whether that is wise depends on which cavities are live and how far the tool sits from its next ejector pin service. One page answers both.
Who reads the mould register, and what shows
Moulds are shared property. The planner, the toolroom and the press supervisor each depend on the same page, and each looks for a different line on it. The owner looks across all tools.
Mould register choices to make before loading
Loading the register means copying what the hanging cards say. Some cards are out of date or silent on a repair, so a few choices are needed before the numbers go in. Agree them with the toolroom.
From tool condition to the press plan and beyond
Moulds appear in more places than the toolroom. Shot counts and blocks decide what a planner books, what a shift sheet compares and what the capacity view calls a clash. Each of these reads from it. It reads from item trees to learn which parts a tool makes.
- Moulding shift sheets add shots and rejects by cavity
- Season capacity view highlights shared moulds near their service point
- Item trees and revisions name the tool for each moulded part
- Resin and masterbatch lots record which tool consumed each lot
- Sample tests and holds trace a failed part back to its cavity
Limits of the mould register for toy tools
This feature records the condition of a tool. It does not repair a mould, set an ejector pin interval or decide when a tool should be retired. Those calls stay with the toolroom and the owner. It does not measure wear, so a count is only as good as the entries made at the press. A factory with one or two tools can keep a card on each.
Frequently asked questions
Does the register track hot runner moulds?
Hot runner tools are entered like any other, with their cavities and the service interval set with the toolroom. Repairs to the hot runner system go in the repair history. Temperature control stays with the machine.
What if one mould serves several items?
A mould that makes parts for more than one toy is entered once, with one shot count and one service point. Every item that uses it reads the same page. Clashes show on the capacity view.
Can we mark a cavity that runs but gives rejects?
A cavity can stay live in the plan and still carry a flag for the toolroom. Shift sheets show rejects by cavity, so flash or short shots point to the right one. Blocking is a separate step.
Do shot counts come from the press automatically?
Operators enter shot counts on a tablet at the press, shift by shift, from the figure on the counter. The system does not read the press counter by itself. A direct link is separate work.
How are our old hanging cards loaded?
Tool numbers, cavity counts, service intervals and the last shot count on each card are loaded with your toolroom. Each page is checked against its card by toolroom staff before the first press is booked. Then the cards come down.
How this feature fits the system.
Toy Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Item trees and revisions
Every toy is held as a tree of moulded, soft and bought out parts with its artwork revision, so the line builds from the current list.
Bill of MaterialsResin and masterbatch lots
Granule and colour lots are received with a number and linked forward to the moulded batches that consumed them.
Batch and Serial TrackingSeason capacity view
Open orders are laid against press, decoration and assembly capacity, and shared mould clashes appear before a schedule is released.
Production PlanningTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements