Resin and masterbatch lots for toy moulding

Every bag of ABS, polypropylene or colour masterbatch is received against a lot number. The record notes the drying and mixing ratios used at the press, and each moulded batch points back to the lots it consumed. When a buyer queries a colour or a part, the planner can name the material behind it.

Granule lots, drying notes and mixing ratios

A toy begins as granule in a bag. Before it reaches a hopper, the receiving clerk gives it a lot number, a grade and a place in the store. The record then follows it through the hopper dryer and the colour mix on the press.

Receipt of each granule lot

Each delivery is entered against the supplier’s delivery note with grade, lot number, quantity and store location. ABS and polypropylene sit on separate lines. A delivery with a missing lot number is flagged at receipt.

Colour masterbatch by lot

Masterbatch is received like granule, with its colour name, the buyer’s colour reference and the lot number as printed on the bag. Teal and red never share a line. Each ties to the colour variant on the item tree.

Drying notes for the hopper

The note records which hopper dryer was used, the temperature set and how long the granule sat in it. Operators type the values from the dryer display. A faulty batch can then be checked against them.

Mixing ratio as set and run

Each run notes the masterbatch share mixed into natural granule, as the planner set it and as the operator ran it. A difference between the two is easy to see.

From the delivery bay to a batch of wheels

Granule arrives on pallets, and its lot number has to travel with it from the store to the hopper. A week of wheel and body runs shows where the record is written and who writes it. It starts at the gate.

A pallet of ABS is received

The storekeeper enters the delivery against its purchase request with grade, lot number and quantity, then prints a pallet label. The label carries the lot. Nobody has to copy the number by hand at the press.

The hopper is loaded for teal

Before a teal run the operator selects the granule lot and the masterbatch lot from the store list. The planner’s mixing ratio appears beside them. Both lots are named on the sheet before the first good shot is counted.

The dryer entry is made

A material handler loads the hopper dryer and enters the start time and temperature against the lot number for that run. The press operator sees whether it is ready. No one walks to the dryer to ask.

A buyer queries the shade

A buyer reports a shade difference on one batch of toy cars after it reaches the shelf. The quality desk opens the moulded batch and reads the masterbatch lot it consumed. Batches from the same lot are listed.

Who handles each lot between store and press

A lot passes through several hands before it becomes a toy. Planners order it, the press uses it and the quality desk answers for it. Each sees it from one side.

For planners ordering granule

Planners see granule and masterbatch stock by grade and colour against the runs already booked on each press. Hopper dryer time is checked in the same view, so a booked run has material that is ready.

For supervisors loading the hopper

Supervisors choose the granule and masterbatch lots on the shift sheet at the start of a run. They record the mixing ratio they actually ran. A wrong lot is noticed at the press, not by the buyer.

For the quality desk tracing colour

The quality desk starts from a moulded batch and reads the lots behind it, or starts from a lot and lists the batches it fed. Both routes work. The supplier’s delivery note sits beside it.

For factory owners watching stock

Owners read which grades and colours are running low, which lots are open at the press and what is out on order. A shortage before a peak shows early. There is still time to raise a purchase request.

Lot rules to fix before first receipt

A lot record is only as good as the habits at the store door. A few choices made now decide how much it can prove later. Agree them with the storekeeper and the planner.

Supplier lot number or own number

Suppliers print a lot number on every bag. Decide whether to use it or a number of your own, with the supplier’s kept beside it on the label. A buyer’s query is then answered either way.

Part bags left after a run

A run seldom uses a whole bag. Choose whether the part bag is weighed back to stock, kept beside the press or written off. Whichever is chosen, the leftover keeps its lot number so the next run can name it.

Mixing ratio, set or as run

The planner sets a ratio, and the operator may run a slightly different one at the hopper. Settle whether to keep one figure or both. Keeping both shows drift between plan and press but needs a second entry.

Whether purge counts as consumed

A colour change uses purging compound and wastes some granule at the hopper. Say whether to log it. Logged purge shows the planner what each colour change costs, and it stays out of the good count.

Lot numbers carried on into batches and cartons

A resin lot is the first link in the chain a buyer may ask about. Moulded batches name it, painted batches inherit it and cartons carry it forward. Break one hand-off and the chain stops. The same number travels to the quality desk and the packing record.

  • Mould and cavity register shows which tool consumed each lot
  • Moulding shift sheets name the lots against shots and rejects
  • Paint and decoration passes take over moulded batch numbers
  • Sample tests and holds trace a failed batch to material
  • Item trees and revisions fix the colour each variant needs

Limits of lot tracking for toy resin

Lot tracking records what went into a batch. It does not test the granule, certify a grade or judge whether a colour matches the buyer’s standard. Supplier certificates and laboratory results stay with the quality desk and the supplier. Its accuracy rests on the entries made at the store and the press. A plant that moulds one material in one colour can keep a simple bag log.

FAQ

Frequently asked questions

Can one moulded batch use two granule lots?

A batch can name more than one lot. When a bag runs out and the next carries another lot, both are recorded against the batch with the shots made on each. Quality staff see both when they trace it.

How is a lot rejected at receipt entered?

A rejected delivery is entered with the reason and the quantity refused, and is kept out of available stock. Return paperwork with the supplier stays with your purchasing team. The entry remains for later queries.

Is drying recorded for every material?

Your planners name the grades that need drying when the system is set up, with the dryer settings they use. Other grades skip the dryer fields. The operator is asked only what applies to the material in the hopper.

Can we trace a carton back to its resin?

A carton lists the moulded and decorated batches behind its parts, taken from the packing record. Each batch names the granule and masterbatch lots it consumed. The trace reads end to end. No folder search is needed.

Who sets mixing ratios for each item?

Planners set the ratio when booking the run, using what the toolroom and quality desk have agreed. The operator confirms or corrects it at the press on the tablet. Both figures stay on the shift sheet.

Where it fits

How this feature fits the system.

Toy Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Item trees and revisions

Every toy is held as a tree of moulded, soft and bought out parts with its artwork revision, so the line builds from the current list.

Bill of Materials

Resin and masterbatch lots

Granule and colour lots are received with a number and linked forward to the moulded batches that consumed them.

Batch and Serial Tracking

Season capacity view

Open orders are laid against press, decoration and assembly capacity, and shared mould clashes appear before a schedule is released.

Production Planning
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements