Snag Lists and Handover for Carpentry Jobs
At the walk-through, faults are noted room by room, each assigned to a named carpenter. A cracked laminate edge becomes a line, not a memory. Before the final bill goes out, the list is closed. Foremen close the snags, and owners read what is still open.
What a carpentry snag record keeps
A snag is a single fault found at handover, written as its own line. Each line sits under a room of the client’s home or office and belongs to a carpenter. It stays open until someone closes it. Together the lines make the handover list.
Snags from walk-through to final bill
Handover is the last stage of a carpentry job and the point where goodwill is won or lost. These four moments follow the walk-through to the day the final bill goes out. Each is a line on the list. Rooms keep it orderly.
Who raises, fixes and reads snag lists
Snags are raised by one person, fixed by another and read by a third. Four roles share the list. Each sees the lines that matter to them. One list serves all four.
Decisions to settle before snag list set-up
Snag lists work only when everyone uses them the same way. Agree these four points before the first handover. They decide who adds a line and when a handover is complete. Keep them simple.
Snag lists handing over to billing and warranty
The snag list is the gate between fitting and the final bill, and the door to the warranty. It takes faults in from the walk-through and hands a clean handover on. Five links are worth knowing before the first handover. They are listed below, each with its purpose.
- Fitting crews and wages assign carpenters to snag work
- Stage payments and invoices hold the final bill until closure
- Warranty and repair visits start from the handover date
- Workshop job cards record any panel remade for a snag
- Design approval records settle disputes over a finish
Where snag lists stop in carpentry
The list records faults, owners and closing dates. It does not decide whether a complaint is fair or whether the client is owed a free repair. That judgement stays with the owner and the contract. Faults caused by damp walls or other trades are for you and your adviser to settle. A tiny job may need only a note on the handover sheet.
Frequently asked questions
Can the client see the snag list?
The client agrees each line during the walk-through. A handover sheet with your name and terms carries the list. Whether the client opens it directly is a set-up choice. Agree the copy before the first handover.
What if a snag cannot be fixed on site?
The line stays open and goes to the workshop, which remakes the panel. Board or laminate for the remake is issued against the job. The final bill waits. The snag closes when the new panel is fitted.
How do I spot snags that have gone stale?
The report of open snags by site and age lists each open line with its age. Old lines stand out. Sites with old lines are the ones to visit. The owner then asks the foreman what blocks it.
Can one snag be assigned to two carpenters?
Each snag has one named owner. If a fault needs two trades, such as carpentry and polish, write two lines, each with its own name. Each person then closes only their own work. Responsibility never blurs.
Does the warranty start when the last snag closes?
The handover date is recorded with the job, and the warranty terms sit beside it. Whether warranty runs from handover or from the last closing is your contract’s call. Set the rule at set-up. Your adviser can confirm the wording.
How this feature fits the system.
Carpentry Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Enquiries and site visits
Enquiries are logged by address and type of work, visits are scheduled, and unanswered quotations are listed for follow-up.
Lead ManagementQuotations by area or item
Wardrobes, doors and panelling are priced by area or piece from your rate card, with board and finish named.
Estimate/Quotation ManagementTimber, plywood and hardware stock
Board, laminate and hardware levels are tracked by shade and thickness, with an alert when a store runs low.
Stock Tracking and AlertsTrades that use it
Tell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements