Skip to main content
GullySystem

Hub sorting and loading for parcel delivery

At the hub, parcels are grouped by destination zone, sealed into bags or roll cages and loaded onto a run. A parcel that missed the vehicle is flagged before the van leaves the dock. Hub staff see what is still waiting and what has gone.

What the hub records for each bag and cage

Sorting needs more than a scan on the way in. Records link each parcel to its zone, to the bag or roll cage that holds it and to the run that cage is loaded onto. Those links expose a mis-sort.

Destination zone for each parcel

Every parcel is placed in a zone from the consignee’s address, using the zone map your company set up. The zone decides which cage collects it. A wrong zone is the usual cause of a mis-sort.

Bag and roll cage contents

Each bag or cage holds a list of the parcels sealed into it. Staff see that list on screen. Checking a container against its list is quicker than opening it, and it shows exactly what is missing.

The run each cage joins

A sealed cage is linked to the run that will carry it, whether a line-haul or a last-mile run. That link lets dispatch see what is going on which vehicle. It ties a late parcel to one run.

The dispatch cut-off for each run

Every run has a cut-off by which its cages must be loaded. That time is held against the run. Parcels still sitting in cages past it are listed, so they are not forgotten overnight in a cage by the dock.

A sorting shift from belt to dock

The hub is busiest between the inbound vans and the outbound runs. Parcels arrive in a rush. They are sorted, then leave on a deadline. The four moments below show how the record keeps pace with the floor, one cage at a time.

Parcels waiting on the sort belt

Staff open the screen and see what is waiting on the belt. Parcels already scanned in but not yet in a cage are listed. The shift lead reads the list. It shows how much sorting is still ahead.

Filling the cage for one zone

A sorter drops a parcel into the cage for Zone C. The scan adds it to that cage’s list. Checking the list against the run sheet shows a parcel that belongs to another zone, and the sorter lifts it out.

Sealing as the cut-off nears

The supervisor watches the clock. Cages for the next run are sealed one by one. Any cage still open when the cut-off arrives is easy to spot, so the supervisor knows where to send extra hands.

Checking the load at the dock

The loader compares each cage with the run before the van moves. Anything that missed the vehicle is flagged. Someone carries it to the dock and loads it, instead of finding it next morning on the floor.

Who works from the hub screen

This screen serves the floor, the desk and the road. Staff on the floor use it every minute. Others dip in for answers. Four roles read it, and each needs a different slice of the same record.

Hub staff sort and seal

Hub staff scan parcels in and out, check cages and bags against run sheets and watch the belt. A mis-sort is caught before the van leaves. Their screen is the working list for the shift.

Dispatchers see what is loaded

Dispatchers need to know which cages are sealed and which run holds them. They read the load status from the desk. No walk to the dock is needed. A run that is short of parcels is seen early.

Drivers receive a full load

A driver reaches the dock and finds a sealed cage matched to the run sheet. Missing parcels have already been flagged. That saves a trip back to the hub after the first few stops. The van leaves complete.

Owners track cut-off misses

Owners read how frequently parcels are left behind past the cut-off, and from which zone. A zone that keeps missing the vehicle points to a staffing or layout problem at the hub. The pattern is plain.

Decisions to settle before the hub goes live

Sorting follows the physical layout of your hub, so a few decisions need the floor’s input. Walk the dock first, with the shift lead. Settle these four points on paper before anything is configured.

Who may open a sealed cage

Decide who can break a seal and reload a parcel. A wide rule helps when a van is leaving in minutes. Name the roles, and record the change each time.

What stays outside the cage system

Some parcels are too big for a cage. Decide how those are handled, and whether they are scanned straight onto a run. Settle the rule now so nobody improvises at the dock. Think of a long tube or a heavy carton.

How hub parcels come across

Parcels sitting in cages at changeover are read in with the other open consignments. Choose a quiet moment for the switch. A dispatcher then checks the list against the floor. Count the cages first, so the list and the floor start from one number.

First report for hub backlog

Begin with parcels left in hub cages past their dispatch cut-off. It shows where the floor falls behind. A shift lead who reads it each morning soon sees which zone needs more hands. Make it the first screen of the shift.

How hub sorting links to other features

Hub work sits in the middle of the parcel’s journey. It takes what pickups and scans have brought in and hands the loaded cages over to the runs that carry them. The list below shows what flows in and what flows out. Nothing is entered twice.

  • Booking and parcel records supply each parcel’s destination zone
  • Labels and scanning log the inbound, bagging and loading steps
  • Run sheets and vehicles receive the cages loaded for each run
  • Failed attempts and returns bring undelivered parcels back to the hub
  • Customer notifications tell senders when a parcel reaches the hub

Where hub sorting stops

This feature records the sorting. It does not do the lifting, run a belt or decide how your hub is laid out. Damaged goods, lost items and any compensation to a sender stay with the owner and an adviser. A depot with one van and a handful of parcels can sort from a shared sheet.

FAQ

Frequently asked questions

How does the hub know which zone a parcel belongs to?

The consignee’s address is matched to your zone map, which is entered when the system is set up. The result appears on the parcel record. The zone then decides which bag or cage the parcel goes into.

What happens if a parcel goes into the wrong cage?

Checking cages and bags against the run sheet shows the stray parcel. The sorter lifts it out. If it slips through, the check against the run sheet catches it before the van leaves. Either way, the error stays at the hub.

Can both line-haul and last-mile runs be loaded here?

Both kinds of run load from the hub. A cage is linked to whichever run will carry it. Dispatch then sees the load for each vehicle in the same way, whatever the run type is, and without a separate list.

Who sees parcels waiting to be sorted?

Staff on the floor see what is waiting on the sort belt. Those are parcels already scanned in but not yet placed in a cage. The shift lead judges the work remaining from the list. Nothing is counted by eye.

How are parcels left behind after the cut-off found?

A report lists parcels left in hub cages past their dispatch cut-off. Each shows its zone and run. A supervisor reads it before the next shift, so left-over parcels are never discovered by a sender’s complaint.

Where it fits

How this feature fits the system.

Delivery Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Booking and parcel records

Each booking from a form, bulk file or phone call becomes a consignment record with sender, consignee, service level and tracking code.

Order Management

Labels and scanning

Parcel labels carry a barcode, and scans at pickup, hub, bagging, loading and handover build the movement history of each parcel.

Barcodes and Labels

Run sheets and vehicles

A run ties a rider, a van and an ordered list of stops together, and the dispatcher sees stops completed as the day goes on.

Vehicle and Trip Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements