Planned Maintenance Schedules for Facility Contracts

Lifts, pumps, the DG set, the STP and fire equipment each need a round at a stated interval. The schedule lists what falls due this week and holds the checklist signed afterwards.

Setting up a schedule

One schedule is built per piece of equipment, not per site. Intervals come off the contract. A lift at a tech park and a lift at a small office block may well be checked at different frequencies, and each carries its own.

Equipment and interval

Each unit gets its own frequency: daily, weekly, monthly, quarterly or half-yearly, as your work order reads.

Checklist points

The points a technician must check and sign, such as oil level, belt condition, panel readings and water level.

Who performs it

Your own technician, the site facility manager, or the vendor holding the annual contract on that equipment.

Readings to record

Figures your client wants captured on every visit, such as running hours, fuel level, pressure or chlorine dose.

Next due date

Counted from the last round completed, so a round done late pushes the following one along with it.

Equipment groups a facility schedule covers

Lists differ by site, but buyers compare the same groups. Each group has its own rhythm and its own vendor.

Lifts

Routine visits by the vendor, plus daily checks of the car and landing by site staff.

Water systems

Tank cleaning dates, pump rounds, chlorine or filter checks and softener regeneration.

Power

DG set run hours, fuel level, battery condition and panel inspection.

Sewage plant

Blower and pump rounds, sludge handling dates and readings your client wants noted.

Fire and life safety

Pump tests, extinguisher checks, alarm panel status and exit route checks, within what the client’s fire advisor sets.

Running the week

Every Monday the site facility manager opens the rounds falling due. The round is performed, the checklist is filled and the readings go in. Anything found wrong becomes a complaint ticket on the spot, which is how a seized bearing noticed during greasing reaches a technician the same day. Rounds not done by their date show as overdue.

Planned work against breakdown work

A building that only fixes things when they stop is paying later. Facility teams track how much work was planned and how much was a reaction. A complaint that comes from a planned round finding is a good sign. A string of complaints on one unit with no round behind it is the opposite. Reading both numbers on one screen shows which sites run on rounds.

Vendor and annual contract rounds

Much of this work sits with vendors. Your own technicians do the rest.

  • The vendor holding each annual contract, with its period
  • Visits due from that vendor and visits actually made
  • The service report the vendor left, attached to the round
  • Equipment still under warranty rather than paid service

Items to settle with the client before the first round

  • Which equipment is yours to maintain and which belongs to a vendor
  • Intervals for each unit, taken from the contract
  • Readings that must be noted on every round
  • Who countersigns rounds on the client side
  • What happens to a round when a unit is shut for repair

What is left to the client

Intervals and checklist points follow your contract and the practice your supervisors already keep. GullySystem puts in what you give it. Any third-party inspection your client arranges sits outside this module, and the paperwork from it is theirs to hold.

A maintenance week from schedule to signature

Planned rounds fall due whether or not anyone remembers them. The schedule puts them on a list, a technician walks them and a supervisor reads the checklist afterwards. These four moments show one week in a site engineer’s office. Nothing is left to memory.

Monday’s due list

The site engineer opens the list for the week. The lift quarterly round, the DG set run and the pump greasing appear with their dates. Nothing is left unowned.

A technician with a checklist

At the DG room, the technician works down the points on a phone, notes the oil level and runtime reading and attaches a photograph. Meanwhile, the round is signed. The next due date is set from that day.

The vendor visit

The lift vendor arrives for the contract round. The engineer enters the visit, attaches the vendor’s report and signs for the client. The round counts as done. The report stays with the equipment record for later reading.

Friday’s overdue read

The manager reads the list of rounds that missed their date. A fire pump test is two days late. The reason is typed against it, and a new date is fixed. The client’s admin sees the same note.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Vendor and annual contract rounds

What proves that a planned task was actually completed?

Select an overdue entry in “Vendor and annual contract rounds”. Ask which work record closes it and what remains visible when the visit is postponed or only part of the job is done.

Background reading: ERPNext: maintenance plans

FAQ

Frequently asked questions

Can two sites share one checklist?

Yes. A checklist written for a lift or a pump can be used at every site that has one, with its own interval per contract.

What happens when a round is skipped?

It shows as overdue until performed, and the overdue list is read by the operations manager across every site. Nothing closes it quietly.

Are readings kept over time?

Yes. Running hours, pressure and fuel readings build a history against the unit, so a drift is visible on the asset page.

Does it send the client a copy?

It can be sent. A completed round with its checklist and photographs can go to the client admin over email or WhatsApp.

Can the interval be changed for one unit?

Yes. An interval belongs to the unit, so a single pump can move from monthly to fortnightly without touching others.

What happens to a round on a unit that is out of service?

The unit is marked under repair and its rounds pause. They resume when it is marked working again.

Can a vendor’s visit satisfy a round?

Yes, when the vendor’s report is attached and a person marks the round done.

Can rounds be seen by the client?

Completed rounds can be shared through a client login for that site.

Where it fits

How this feature fits the system.

Facility Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Sites and contracts

Each client site is held with its blocks, posts, service scope, rate per category, billing cycle and the dates the agreement runs.

Contract Management

Attendance at the site

Staff mark in and out where they report, by phone with a photo and location, or through a device at the larger sites.

Attendance & Time Tracking

Complaint helpdesk

Residents, tenants and office admins log complaints by category, the desk assigns them with a reply time, and closure records the work done.

Helpdesk Automation
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements