Skip to main content
GullySystem

Reports for Facility Management Company Owners

Every figure here is built from the deployment, attendance, complaint, maintenance and billing entries your sites already make. Owners and operations managers read them without joining registers by hand.

The reports

Each one names the records behind it. Nothing on this page is keyed in twice, because every line is read from deployment, attendance, complaints, maintenance rounds, indents, bills and wage entries made at the sites.

Headcount deployed against contracted

Plan per grade beside the strength marked present, site by site, which is the figure a client queries first.

Attendance, absence and cover

Present days, absences and the relievers sent, by site and by grade.

Complaints logged, attended and pending

By site and grade, with ageing measured against the reply hour your contract names.

Planned maintenance due and overdue

Rounds falling due, rounds completed and rounds past their date, per equipment and per site.

Consumable indent and issue per site

What a site asked for and what left the godown, against the material allowance in that contract.

Contract bills and payment outstanding

Bills raised per client with ageing, so a contract running two months behind is visible.

Wage summary

Duties, overtime, advances and deductions for the month, grouped by site and grade.

Measures facility contracts are judged by

Facility agreements name a handful of measures. Response and resolution times, repeat calls, planned work completed on time and age of the oldest open job. The reports above let you read those without building anything new.

Planned work completed on time

Rounds done against rounds due, by site.

Oldest open complaint

How long the longest-waiting ticket has been open. One old ticket can sour a whole review.

Repeat complaints

The same unit or area raising tickets again.

Strength against plan

The measure clients check first on any manpower bill.

Who acts on which

Your owner reads strength, complaint ageing and payment outstanding. The operations manager works short posts and the overdue maintenance list. Site facility managers read their own site. An owner who sees thirty open complaints at one site and a clean sheet at another knows which contract manager to call before the client does. The back office carries the billing and wage summaries into month end. Nobody waits for a sheet from somebody else.

Reading reports in a review meeting

A review with a client goes better with one site opened at a time. Start with strength, then complaints, then rounds, then the bill. If all four look healthy, the conversation is short. If one is poor, you already have the entries behind it. Bring the exported sheet if the client prefers paper.

What the figures reflect

A figure is only as sound as the entry behind it. A duty never marked at the gate does not reach the bill. A complaint closed by word of mouth and never recorded keeps running on the ageing list. A report that looks wrong traces back to a missed entry at a site.

Questions for a facility reporting demonstration

  • Open one site and trace a late complaint to its ticket.
  • Find the contract with the oldest unpaid bill.
  • Show strength for last Tuesday, not today.
  • Limit a manager to two contracts and show what disappears.
  • Export a client review sheet for a single site.

What your office decides

Which reports a manager may open, and whether a client admin reads anything beyond their own site, are settled with your operations team. A new report can be built from entries your sites already make. Ask for one after go-live.

Reading figures through a month of contracts

The owner glances, the operations manager digs deeper and the billing desk checks every line. These scenes show who opens which figure. Then they show what happens next.

The owner on Monday morning

The owner opens the summary across sites. Headcount against contract, open complaints and overdue maintenance sit on one screen. One site shows red. A call to the operations manager follows before the first tea of the day.

The operations manager midweek

The manager opens the site with the shortfall and reads attendance, absence and cover by post. A pattern of absence on night shifts is visible. The roster is adjusted. The reliever pool is told about the change.

The billing executive before cycle end

The executive reads outstanding bills by client and the ageing of each. A bill delayed over the allowed days is flagged. A reminder with the attendance summary goes out. Payment follow-up is logged on the same screen.

A client review meeting

The client asks about repeat calls. The manager opens the list on screen. The discussion works from the same numbers, not from memory.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

The reports

What does one row mean before totals are combined?

Choose one period in “The reports” and compare it with the source records. Define the date basis and grouping before accepting a total that combines several kinds of entry.

Background reading: Microsoft: reporting grain and relationships

Planned maintenance due and overdue

What proves that a planned task was actually completed?

Select an overdue entry in “Planned maintenance due and overdue”. Ask which work record closes it and what remains visible when the visit is postponed or only part of the job is done.

Background reading: ERPNext: maintenance plans

FAQ

Frequently asked questions

Are the figures live?

Yes. They move as sites mark attendance, close complaints and raise indents, so the morning strength list is current.

Can a facility report be downloaded?

Yes. Reports export to a sheet for your accountant or for a client review meeting.

Can a manager be limited to some sites?

Yes. A manager reads the contracts held, and an owner reads every site together.

Is there a report per client?

Yes. Strength, complaints, rounds and bills can all be read for one client across the sites they give you.

Can I see last month’s figures as they stood then?

Reports can be run for a past date range, and corrections to old days are kept with reasons. Confirm the exact behaviour on your data at scoping.

Does the system build graphs?

Dashboards show figures and bars for the main measures. Anything fancier can be built from exported sheets.

Who sets the targets the reports compare against?

You do, from your contracts. The system reads the number you enter and does not guess one.

Can a client admin see these reports?

A client login reads the reports for its own site and nothing else.

Can a report show which sites have not marked attendance?

Yes. A site with no attendance entered for the day appears on a pending list for the operations manager. The gap shows before the wage summary is built, so a missing day is chased while the supervisor still remembers it.

Can maintenance rounds be read by equipment type?

Rounds can be grouped by the plant they cover, such as pumps, lifts or air handling units, provided each item was recorded that way when added. A site then sees which kind of equipment is falling behind.

Where it fits

How this feature fits the system.

Facility Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Sites and contracts

Each client site is held with its blocks, posts, service scope, rate per category, billing cycle and the dates the agreement runs.

Contract Management

Attendance at the site

Staff mark in and out where they report, by phone with a photo and location, or through a device at the larger sites.

Attendance & Time Tracking

Complaint helpdesk

Residents, tenants and office admins log complaints by category, the desk assigns them with a reply time, and closure records the work done.

Helpdesk Automation
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements